| 1 | Clearing grass and removal of rubbish up to a distance of 50m out side the periphery of the area etc. complete as per the direction of the Engineer-in-charge. |
| 2 | Dismantling the cement concrete grade M15 & M20 including etc complete and as per the direction of the Engineer-in-charge. |
| 3 | Earth work excavation of foundation in ordinary soil within 50m initial lead and 1.5m initial lift including dressing and levelling the bed with shoring, shuttering and dewatering if required etc completeand as per the direction of the Engineer-in-charge. |
| 4 | Filling in foundation and plinth with sand watered and rammed below bed including cost, conveyance, royalty, taxes and labour charges etc complete and as per the direction of the Engineer-in-charge. |
| 5 | Cement Concrete work of M15 using 20mm and down graded size CBHG chips including mixing with concrete mixture with cost, conveyance, royalty of all materials etc. complete & as per the direction of the Engineer-in-charge. |
| 6 | RCC Work with M 20 (A 20) with crushed granite coarse aggregate and down graded of approved quality free from weathered skin mixing concrete in batching plant, conveying the same by transit mixers and placing in position with all leads and lifts and vibrating the same by mechanical means including cost, conveyance, cess, royalty of all materials and labour etc. as directed by the Engineer-in-charge. |
| 7 | Providing, strengthening, cutting, bending, binding, fitting & placing uncoated HYSD bar reinforcement & laying in position including cost of binding wire 18mm to 20mm gauge & fixing of reinforcement ilcluding lapping (As per steel code) where necessary spot including cost, conveyance, royalty, T & P & all taxes of reinforcement, etc. complete as directed by the Engineer-in-charge. |
| 8 | Form work for concrete with F1 finishing using steel shutter plates of aproved specification for surfaces not porminently or permanently exposed to public view including supply of all materials. T & P labour and transportation of all materials etc. complete as directed by the Engineer-in-charge. |
| 9 | Rigid smooth centering and shuttering for concrete work and dismantling after casting with cost, conveyance and taxes of materials and labour charges etc. complete as per the direction of the Engineer-in-charge. |
| 10 | Earth work in ordinary soil within within 50m initial lead & 1.50m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying layers not exceeding 0.30m in depth and as per the direction of the Engineer-in-charge. |
| 11 | Filling the foundation & plinth with excavated materials including watering and ramming, etc. complete as directed by the Engineer-in-charge. Please Enable Macros to View BoQ information |