| 1 | Providing Storm water drainage with coverslab |
| 2 | Dismantling ,clearing away and carefully stacking materials useful for re-use for any thick ness of wallsDismantling of Plain Cement Concrete |
| 3 | Dismantling ,clearing away and carefully stacking materials useful for re-use for any thick ness of wallsDismantling of Reinforced Cement Concrete |
| 4 | Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres in all kinds of soil except mediumrock, dense medium rock and hard rock requiring blasting including refilling the sides of foundation with excavated earth in layers of 15cm thick, watering and consolidation and depositing the surplus earth with in the compound in places as shown by the departmental officers with initial lead and lift. cleaning,levelling the site etc,. complete complying with standard specifications.(TNBP No.20B) |
| 5 | Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28) |
| 6 | Providing steel centering for sides and soffits including supports and strutting upto 1:10/1:20 up to 3.29m height for plain surfaces such as RCC slabs, rectangular beams, Tee beams, bed blocks, Culvert body walls, deck slabs, retaining walls, staircase, Landing slab, landing beams, canopy etc., wood) joists of size 10cmx 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 15cm c/c including cost of nails, ropes, all labour charges and incidental charges etc. complete complying with standard specification.(TNBP Spl. No.154 A) |
| 7 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 8 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. |
| 9 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. |
| 10 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. Please Enable Macros to View BoQ information |