| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading and unloading charges |
| 2 | Dismantling(without damage)one km LT three phase 4 wire OH line conductor by dismantling cross arms,insulators and stacking the conductors in rolls properly |
| 3 | Dismantling(without damage)one km LT single phase 2 wire OH line conductor by dismantling cross arms,insulators and stacking the conductors in rolls properly |
| 4 | Erecting one LT PSC Pole in position including digging and back filing pit in ordinary soil |
| 5 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site(transportation by any vehicle) |
| 6 | Providing Stay for LT poles including digging and back filing pit in ordinary soil |
| 7 | Providing one Earth using GI earth pipe of size 38.1 mm dia,2.5m length including digging separate pit(0.45x0.45x2.5m)at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfiling |
| 8 | Additional rate for excavation of one Earth Pit(2.5m depth) in Laterite |
| 9 | Installation of Insulation piercing connector for main to service line main:16-95 sqmm, Tap 16-95 sqmm |
| 10 | Installing One No.4way Satellite connector of size Main:16 to 95,Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 11 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and unloading using crane |
| 12 | Stringing of 1.1 kV Aerial bunched cable of size 3x70+1x16+1x50 sqmm with bare/insulated Messenger through existing poles |
| 13 | Erection of Anchor clamp/dead end clamp for LT ABC of any size |
| 14 | Providing End caps |
| 15 | Erection of suspension clamp for LT ABC of any size |
| 16 | Installation of Insulation piercing connector for main to service line main:16-95 sqmm, Tap 4-35 sqmm |
| 17 | Installing one No. Insulation piercing connector of size Main:16 to 95, Tap:1.5 to 16 Sq.mm |
| 18 | Installation pf Pre-insulated straight through joints for 16 sqmm cable |
| 19 | Installation pf Pre-insulated straight through joints for 50 sqmm cable |
| 20 | Installation pf Pre-insulated straight through joints for 70 sqmm cable |
| 21 | Insertion of one LT PSC pole in existing three phase OH line including digging and backfilling pit in ordinary soil,fitting cross arm,insulator,binding etc.excluding transportation of poles. |
| 22 | Insertion of one HT PSC pole in existing HT/LT line including digging and backfilling of pit in ordinary soil,fitting cross arm,insulator,binding etc.drawing sufficient length of GI earth leads to the ground for earthing(excluding provision of earthing). |
| 23 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site(transportation by any vehicle) Please Enable Macros to View BoQ information |