| 1 | Ghat - Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M including all lifts levelling ramming the foundation trenches removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I. (5.1.1+ 5.1.2) |
| 2 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per specification and direction of E/I (Mode of measurement compacted volume. (5.1.10) |
| 3 | Providing designation 75B one Brick flat soling as per building specification and direction of E/I (5.6.3) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) (5.3.1.3) |
| 5 | providing designation 75 B brick work in c.m (1:6)in foundation and plinth as per building specification and direction of E/I (5.2.6) |
| 6 | Filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) (5.1.7) |
| 7 | Providing 12mm thick cement plaster (1:4) with punning as per building specification and direction of E/I (5.7.2+ 5.7.11) |
| 8 | Add Carriage of Material , Sand Lead lead (1+11)km (i) |
| 9 | Bricks Lead (14+1) km (ii) |
| 10 | Stone Chips lead (15)km (iii) |
| 11 | Cement Lead 10 km (iv) |
| 12 | Drain Slab Labour Required for site clearence do-do-E/I |
| 13 | Providing P.C.C M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6 mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening shuttering mixing cement concrete in mixer and placing in position, vibrating, striking, curing taxes and royalty all complete as per building specification and direction of E/I (5.3.1.2) |
| 14 | Plain / Reinforced cement(1:1.5:3) concrete in sub structure complete as per drawing and technical specification. (5.3.9.1) |
| 15 | Providing tor steel reinforcement of 8 mm dia bars as per approved deign and drawing as per building specification and direction of E/I (5.5.1(II)) |
| 16 | Add Carriage of Material , Sand (AVG Lead 15 Km.(P)) |
| 17 | Stone Chips (AVG Lead 15 Km.(P)) |
| 18 | Cement + Rod (AVG Lead 10 Km.(P)) |
| 19 | Add cost for Signboard and Photography |
| 20 | Goods & Service Tax (G.S.T. 18%) |
| 21 | 1% Labour Cess Please Enable Macros to View BoQ information |