| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: SE EDC, Chandauli, PuVVNL, Varanasi. Name of Work : Work of overhauling and capacity enhancement of power transformers, as well as line construction and strengthening, within the Industrial Area (Phase-1) under the jurisdiction of EDD-Ist, Chandauli—pursuant to the \\"Business Plan 2026-27\\" (on Semi Turn-key basis). Tender No.: 13/EDC(C)/2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Details Item Code / Make Qty. Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Figures To be entered by the Bidder (Including GST) Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT (Including GST) Rs. P TOTAL AMOUNT(Including GST) Rs. P. (col.4 X col.13) TOTAL AMOUNT (Including GST)In Words |
| 2 | Centralised Materials- A |
| 3 | PCC Pole 8.5 Mtr. Long |
| 4 | PCC Pole 11 Mtr. Long |
| 5 | MS Top channel (125x65x2240mm) |
| 6 | MS Dropper angle |
| 7 | T-Off Channel |
| 8 | Polymeric 11 KV Pin insulator |
| 9 | Polymeric Disc insulator |
| 10 | ACSR weasel conductor |
| 11 | ACSR Dog conductor |
| 12 | 11 KV Stay Set |
| 13 | Stay wire 3.5MM 7/10SWG |
| 14 | Earthing Rod |
| 15 | Earthig wire 6 SWG |
| 16 | 11 KV V type cross arm |
| 17 | 11KV outdoor Cable Jointing unit 3*70 sq mm |
| 18 | 11KV Cable Jointing unit 3x300 sq mm |
| 19 | LT AB Cable (3x120+1x95+1x16) sq mm |
| 20 | LT AB Cable (3x95+1x70+1x16) sq mm |
| 21 | LT AB Cable (3x50+1x35+1x16) sq mm |
| 22 | 11KV XLPE Cable 3x70 sq mm |
| 23 | 11KV XLPE Cable 3x300 sq mm |
| 24 | LT XLPE Cable 1x400 sq mm |
| 25 | LT XLPE Cable 1x240 sq mm |
| 26 | LT XLPE Cable 1x120 sq mm |
| 27 | T/F Base angle |
| 28 | 3 Phase Distribution Box |
| 29 | 11/0.4 KV 400 KVA Transformer |
| 30 | 11/0.4 KV 250 KVA Transformer |
| 31 | 11/0.4 KV 100 KVA Transformer |
| 32 | 11/0.4 KV 25 KVA Transformer |
| 33 | Line Isolator 800A, 33KV |
| 34 | Bus Isolator 800A, 33KV |
| 35 | Decentralized Materials- B |
| 36 | Dead End & Suspension Clamp for ABC |
| 37 | Eye- Hook |
| 38 | PG Clamp |
| 39 | Stone Pad |
| 40 | 11KV F-Bracket |
| 41 | 3 Phase Distribution Box Clamp |
| 42 | Clamps for TF dropper and Double Pole channel and base angle |
| 43 | Clamps for 11KV PCC Pole |
| 44 | LT Piercing connectors |
| 45 | Nut and bolt of various size |
| 46 | Al Lug 1x400 sq mm |
| 47 | Al Lug 1x240 sq mm |
| 48 | Al Lug 1x120 sq mm |
| 49 | Al Lug 1x70 sq mm |
| 50 | Al Lug 1x35 sq mm |
| 51 | Tail Less Unit for LT Protection Double Circuit for 250 KVA DT |
| 52 | PG Clamp for Panther and Dog |
| 53 | G.I. Pipe 6\\" Dia |
| 54 | Labour & Maintainance charges - C |
| 55 | Work of Carriage of 8.5 mtr. PCC pole with fitting from store centre Sahupuri/Rajatalab to site with loading & unloading. |
| 56 | Work of Carriage of 11 mtr. PCC pole with fitting from store centre Sahupuri/Rajatalab to site with loading & unloading. |
| 57 | Work of Erection of Single Pole / Double Pole with 8.5 mtr. PCC Pole with digging & Fitting of fixtures with accessories (Holding Clamp, Droper Angle, T-Off Channel, V-Type Cross Arm, Base Angle, Nut & Bolts, , F-Bracket, Stone Pad etc.) as per RESSPO standard. |
| 58 | Work of Erection of Single Pole / Double Pole with 11 mtr. PCC Pole with digging & Fitting of fixtures with accessories (Holding Clamp, Droper Angle, T-Off Channel, V-Type Cross Arm, Base Angle, Nut & Bolts, , F-Bracket, Stone Pad etc.) as per RESSPO standard. |
| 59 | Work of Carriage & Erection of ACSR Weasel Conductor with all accessories (Pin Insulator, Disc Insulator, PG Clamp etc.) including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 60 | Work of Carriage & Erection of ACSR Dog Conductor with all accessories (Pin Insulator, Disc Insulator, PG Clamp etc.) including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 61 | Work of Carriage & Erection of LT AB Cable (3x50+1x35+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp, Eye / J-Hook, DB Clamp, Pearcing Connector, Lug etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 62 | Work of Carriage & Erection of LT AB Cable (3x95+1x70+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp, Eye / J-Hook, DB Clamp, Pearcing Connector, Lug etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 63 | Work of Carriage & Erection of LT AB Cable (3x120+1x95+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp, Eye / J-Hook, DB Clamp, Pearcing Connector, Lug etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 64 | Work of Carriage & Laying by Open air method of LT XLPE Cable 1x400sqmm with Crimping Lug 400sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 65 | Work of Carriage & Laying by Open air method of LT XLPE Cable 1x240sqmm with Crimping Lug 240sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 66 | Work of Carriage & Laying by Open air method of LT XLPE Cable 1x120sqmm with Crimping Lug 120sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 67 | Work of Carriage & Laying by Open air method of 11KV XLPE Cable 3x70 sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 68 | Work of Carriage & Laying by Open Trench method of 11KV XLPE Cable 3x70 sqmm with (bricks, sands & stone slabs including cable loop, Cable Holding Clamp, G.I. Pipe 6\\" Dia all material supply by contractor) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 69 | Work of Carriage & Laying by Open air method of 11KV XLPE Cable 3x300 sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 70 | Work of Carriage & Laying by Open Trench method Single / Double Ckt. of 11KV XLPE Cable 3x300 sqmm with (bricks, sands & stone slabs including cable loop, Cable Holding Clamp, , G.I. Pipe 6\\" Dia all material supply by contractor) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 71 | Work of Carriage & Erection of of 11 KV 3x70 / 3x300 sqmm XLPE O/D Cable Box after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work. |
| 72 | Work of Carriage & Erection of Line Isolator / Bus Isolator 800A, 33KV with (PG Clamp, Nut & Bolts) including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 73 | Work of Jumpering and earthing of new isolator along with all required material including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 74 | Work of Carriage & Mounting of 25 KVA transformer on Double Pole from store centre Sahupuri/Rajatalab to work site and Energizing with all Accessories (Lug, Cable) after installation as per RESSPO standard. |
| 75 | Work of Carriage & Mounting of 100 KVA transformer on Double Pole from store centre Sahupuri/Rajatalab to work site and Energizing with all Accessories (Lug, Cable) after installation as per RESSPO standard. |
| 76 | Work of Carriage & installation on Plinth of 250 KVA transformer from store centre Sahupuri/Rajatalab to work site and Energizing with all Accessories (Z Clamp, Copper L-Piece, Lug, Cable) as per RESSPO standard. |
| 77 | Work of Carriage & installation on Plinth of 400 KVA transformer from store centre Sahupuri/Rajatalab to work site and Energizing with all Accessories (Z Clamp, Copper L-Piece, Lug, Cable) as per RESSPO standard. |
| 78 | Work of Construction of Wire mesh fencing with 1 door for distribution T/F including Grounting of foot & Proper fixingg as per RESSPO standard (fencing size-8x7x6) of T/f of supply of material. |
| 79 | Special Earthing of 250 KVA T/F Nutural and Body Seperately Chemical Pipe, 30Feet Deep & connection with GI Strip of size 30x5mm including cost of material all required material shall be supplied by the contractor. |
| 80 | Work of Construction of Plinth of 250 KVA TF (2X2X1.5M) including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 81 | Work of Erection of Henley Type Tailless Fuse Unit 300 Amp, 650 Volt (Two Circuit) (Complete set as per technical specification & drawing) Suitable up to 250 / 400 KVA Distribution Transformer as per RESSPO standard. |
| 82 | Work of Centrifuging of Oil, Seal and Packing Changing of whole power Transformer and complete overhauling as per RESSPO standard. |
| 83 | Work of Removing cleaning Primer and spray painting of 10 MVA Power Transformer as per RESSPO standard. |
| 84 | Work of Installation of Tap changer in 10 MVA Power Transformer no. 1 with materail as per RESSPO standard. |
| 85 | Work of Delta chemical earthing with 35x6 sq mm strip for Control Panels at Baburi Substaion as per RESSPO standard. |
| 86 | Work of Erection and commissioning of exhaust fan with structure and LT wiring on Power Transformer radiator as per RESSPO standard. |
| 87 | Work of Carriage & Erection of Earthing Complete with loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 88 | Work of Carriage & Erection of Stay Complete with loading & unloading as per RESSPO standard. |
| 89 | Work of Stay Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 90 | Work of Pole Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 91 | Work of Dismantling & Carriage Charges of old 10 KVA T/F form Site to store centre Sahupuri/Rajatalab. |
| 92 | Work of Dismantling & Carriage Charges of old 63 KVA T/F form Site to store centre Sahupuri/Rajatalab. |
| 93 | Work of Dismantling & Carriage Charges of old 100 KVA T/F form Site to store centre Sahupuri/Rajatalab. |
| 94 | Work of Dismantling & Carriage Charges of old 250 KVA T/F form Site to store centre Sahupuri/Rajatalab. |
| 95 | Work of Dismantling & Carriage Charges of Line Isolator / Bus Isolator 800A form Site to store centre Sahupuri/Rajatalab. |
| 96 | Work of Dismantling & Carriage Charges of Old Tap changer form Site to store centre Sahupuri/Rajatalab. Total in Figures 0.0 0.0 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |