| 1 | VARIOUS WORK FOR THE STRENGTHENING OF THE 33 KV SUB STATION- CHOWK,MUKHYALAYA, GHUGHULI, AND MITHAURA UNDER EDD-I MAHARAJGANJ AND EDD NICHLAUL) (Business Plan 2026-27) |
| 2 | Repairing maintance and strenghtening of switchyard/ substation under sub station chowk under EDD I maharajganj |
| 3 | Safe Loading, Carriage & Unloading of 33kv C.T. From Electricity Store Center Maharajganj to Work Site. |
| 4 | Safe Loading, Carriage & Unloading of 33kv L.A. From Electricity Store Center Maharajganj to Work Site. |
| 5 | Safe loading carriage and unloading of 33 kv control pannel for single feeder From Electricity Store Center Maharajganj to Work Site. |
| 6 | Safe Loading, Carriage & Unloading of 33kv Bus Isolator From Electricity Store Center Maharajganj to Work Site. |
| 7 | Removal of damaged 33 kv C.T. from C.T. structure in switchyard after disconnecting from 33 kv side and C.T. secondary connection with proper record and removal of C.T. earthing etc. |
| 8 | Removed of damaged 33 kv L.A. from L.A. structure in switchyard after disconnecting from 33 kv side and L.A. secondary connection with proper recod and removal of L.A. earthing etc. |
| 9 | Removal of old defective 33 kv control panel from control room after disconnecting cables |
| 10 | Removal of damaged 33kv Bus Isolator from Isolator structure in switchyard after disconnecting from 33 kv supply and removal of C.T. earthing etc. |
| 11 | Safe Installation of new 33 kv C.T. on C.T. structure in switchyard with earthing secondary side Reconnection and 33 kv side reconnection etc |
| 12 | Safe Installation of new 33 kv L.A. On L.A. structure in switchyard with earthing secondary side Reconnection and 33 kv side reconnection etc |
| 13 | Safe Installation of new 33kv Bus Isolator. on Isolator structure, Proper alignment, Reconnecting 33 KV supply and conductor and earthing etc. |
| 14 | Installation of 33 kv control panel for single feeder with connection and commisissioning of cables |
| 15 | Proper earthing 33 kv control panel |
| 16 | providing and laying of Armoured Coppewr Control cable of size 2x2.5 sqmm size |
| 17 | providing and laying of Armoured cable control cable of size 4x2.5 sqmm size |
| 18 | Water Level Earthing of 33/11 KV 5 MVA Power Transformer Neutral earthing with required all material i.e. G.I. Pipe 6 swg Cu Wire etc as per specification |
| 19 | Water Level Earthing of 33/11 KV 5 MVA Power Transformer Body earthing with required all material i.e. G.I. Pipe 7 swg Cu Wire etc as per specification |
| 20 | Febrication and erection of 33 kv Fuse set structure in switchyard by cutting, welding etc as sper specification |
| 21 | Grouting plinthing of 33 kv fuse set structure with concrete as per specification |
| 22 | Providing and installation of 33 kv fuse set mounting structure with 33 kv post insulator and proper earthing of structure with 50x6mm size ms strip |
| 23 | Making 33 kv side connection of fuse set. |
| 24 | providing and installation of Nut bolt with washer |
| 25 | Loading, Carriage & Unloading of damaged 33kv C.T. From Work Site to Electricity Store Center Maharajganj |
| 26 | Loading, Carriage & Unloading of damaged 33kv L.A. From Work Site to Electricity Store Center Maharajganj |
| 27 | loading carriage and unloading of old 33 kv control pannel for single feeder From Electricity Store Center Maharajganj to Work Site. |
| 28 | Loading, Carriage & Unloading of old damaged 33kv Bus Isolator From Work Site to Electricity Store Center Maharajganj |
| 29 | Repairing maintance and strenghtening of switchyard/ substation under sub station Ghughuli under EDD I maharajganj |
| 30 | Safe Loading, Carriage & Unloading of 33kv C.T. From Electricity Store Center Maharajganj to Work Site. |
| 31 | Safe Loading, Carriage & Unloading of 33kv P.T From Electricity Store Center Maharajganj to Work Site. |
| 32 | Removed of damaged 33 kv C.T. from C.T. structure in switchyard after disconnecting from 33 kv side and C.T. secondary connection with proper recod and removal of C.T. earthing etc. |
| 33 | Removed of damaged 33 kv P.T from P.T structure in switchyard after disconnecting from 33 kv side and P.T secondary connection with proper recod and removal of P.T . earthing etc. |
| 34 | Safe Installation of new 33 kv C.T. on C.T. structure in switchyard with earthing secondary side Reconnection and 33 kv side reconnection etc |
| 35 | Safe Installation of new 33 kv P.T. On P.T . structure in switchyard with earthing secondary side Reconnection and 33 kv side reconnection etc |
| 36 | providing and installation of Nut bolt with washer |
| 37 | Safe Loading, Carriage & Unloading of damaged 33kv C.T. From Work Site to Electricity Store Center Maharajganj |
| 38 | Safe Loading, Carriage & Unloading of damaged 33kv P.T From Work Site to Electricity Store Center Maharajganj |
| 39 | Repairing maintance and strenghtening of switchyard/ substation under sub station Mukhyalaya under EDD I maharajganj |
| 40 | Safe Loading, Carriage & Unloading of 33kv LIne Isolator From Electricity Store Center Maharajganj to Work Site. |
| 41 | Removal of damaged 33kv LIne Isolator from Isolator structure in switchyard after disconnecting from 33 kv supply and removal of C.T. earthing etc. |
| 42 | Safe Installation of new 33kv LIne Isolator. on Isolator structure, Proper alignment, Reconnecting 33 KV supply and conductor and earthing etc. |
| 43 | providing and installation of Nut bolt with washers |
| 44 | Safe Loading, Carriage & Unloading of old damaged 33kv LIne Isolator From Work Site to Electricity Store Center Maharajganj |
| 45 | Repairing maintance and strenghtening of switchyard/ substation under sub station MIthaura under EDD Nichlaul |
| 46 | Safe Loading, Carriage & Unloading of 33 KV VCB 800 A, 750 MVA From Electricity Store Center Maharajganj to Work Site. |
| 47 | PROVIDING LAYING COMMISSIONING OF LT COPPER CONTROL CABLE OF SIZE 4X2.5 SQMMM |
| 48 | Removal of defective 33 KV VCB from 33 KV VCB structure after disconnecting from 33 KV supply, conductor, control cables with proper record and earthing etc. |
| 49 | Installation of 33 KV VCB from 33 KV VCB structure and reconnecting from 33 KV supply, conductor, control cables , commissioning and earthing of 33 KV VCB Structure. |
| 50 | Loading, Carriage & Unloading of defective 33 KV VCB 800 A, 750 MVA FromWork Site to Electricity Store Center Maharajganj. Please Enable Macros to View BoQ information |