| 1 | The work of In the Business Plan 2026-27, the work of strengthening/Agumentation 33 KV/11 KV power lines 33/11 KV power substation Kulpahad/Jaitpur/Ajnar/Dawrra under the distribution subdivision Kulpahad (on semi-turnkey basis). under EDD-II, MAHOBA, including carriage of all required Line material/Transformers from ESC/Workshop Mahoba to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/dismentled line material/T/Fs from site to store centre/workshop, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- | The work of In the Business Plan 2026-27, the work of strengthening/Agumentation 33 KV/11 KV power lines 33/11 KV power substation Kulpahad/Jaitpur/Ajnar/Dawrra under the distribution subdivision Kulpahad (on semi-turnkey basis). under EDD-II, MAHOBA, including carriage of all required Line material/Transformers from ESC/Workshop Mahoba to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/dismentled line material/T/Fs from site to store centre/workshop, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- |
| 2 | Supply of following 11 KV Line Jaitpur/Kulpahad materials :- | Supply of following 11 KV Line Jaitpur/Kulpahad materials :- |
| 3 | X-Arm Holding Clamp for PCC as per RESSPO manual. | X-Arm Holding Clamp for PCC as per RESSPO manual. |
| 4 | 11 KV F-Bracket for PCC as per RESSPO manual. | 11 KV F-Bracket for PCC as per RESSPO manual. |
| 5 | Nut Bolt with Washer All Size as per RESSPO manual. | Nut Bolt with Washer All Size as per RESSPO manual. |
| 6 | Earthing Complete (Earthing Rod, GI Wire 6 SWG) | Earthing Complete (Earthing Rod, GI Wire 6 SWG) |
| 7 | Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. | Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. |
| 8 | Erection/Instalation/Fixing of 11 KV Line Jaitpur/Kulpahad following :- | Erection/Instalation/Fixing of 11 KV Line Jaitpur/Kulpahad following :- |
| 9 | Fixing of X-Arm Holding Clamp for PCC as per RESSPO manual. | Fixing of X-Arm Holding Clamp for PCC as per RESSPO manual. |
| 10 | Fixing of 11 KV F-Bracket for PCC as per RESSPO manual. | Fixing of 11 KV F-Bracket for PCC as per RESSPO manual. |
| 11 | Fixing of Earthing Complete (Earthing Rod, GI Wire 6 SWG) | Fixing of Earthing Complete (Earthing Rod, GI Wire 6 SWG) |
| 12 | Fixing & Erection of Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. | Fixing & Erection of Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. |
| 13 | Cartage & Erection of PCC Pole 8.5 Mtr. Long as per RESSPO manual (Provided by the Dept.) | Cartage & Erection of PCC Pole 8.5 Mtr. Long as per RESSPO manual (Provided by the Dept.) |
| 14 | Fixing of 11 KV MS-X Arm \\"V\\" Type as per RESSPO manual (Provided by the Dept.) | Fixing of 11 KV MS-X Arm \\"V\\" Type as per RESSPO manual (Provided by the Dept.) |
| 15 | Fixing of 11 KV Disc Insulator as per RESSPO manual (Provided by the Dept.) | Fixing of 11 KV Disc Insulator as per RESSPO manual (Provided by the Dept.) |
| 16 | Fixing of 11 KV Disc Fitting as per RESSPO manual (Provided by the Dept.) | Fixing of 11 KV Disc Fitting as per RESSPO manual (Provided by the Dept.) |
| 17 | Fixing of 11 KV Composite Polymer Pin with Nut (Provided by the Dept.) | Fixing of 11 KV Composite Polymer Pin with Nut (Provided by the Dept.) |
| 18 | Laying, stringing ACSR Weasel Conductor (Provided by the Dept.) | Laying, stringing ACSR Weasel Conductor (Provided by the Dept.) |
| 19 | Fixing of GI Wire 6 SWG (Provided by the Dept.) | Fixing of GI Wire 6 SWG (Provided by the Dept.) |
| 20 | Fixing of Gaurding Angle with Clamp nut & Bolt (Provided by the Dept.) | Fixing of Gaurding Angle with Clamp nut & Bolt (Provided by the Dept.) |
| 21 | Concreting of Support Stay Set. including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support Stay Set. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 22 | Concreting of Support PCC Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support PCC Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 23 | Cartage & Dismentling Conductor of old & Used Material from Site to Store | Cartage & Dismentling Conductor of old & Used Material from Site to Store |
| 24 | Supply of following 33 KV Line Ajnar to Dhawrra/Kulpahad Nishwara Line materials :- | Supply of following 33 KV Line Ajnar to Dhawrra/Kulpahad Nishwara Line materials :- |
| 25 | 33/11 KV 3X300 Sqmm Cable Jointing Kit Outdoor Type as per RESSPO manual. | 33/11 KV 3X300 Sqmm Cable Jointing Kit Outdoor Type as per RESSPO manual. |
| 26 | G.I Pipe 6\\" MM Dia as per RESSPO manual. | G.I Pipe 6\\" MM Dia as per RESSPO manual. |
| 27 | Stone Pad as per RESSPO manual. | Stone Pad as per RESSPO manual. |
| 28 | Earth Wire Clamp with Nut & Bolt as per RESSPO manual. | Earth Wire Clamp with Nut & Bolt as per RESSPO manual. |
| 29 | Aluminium Paint Paint as per RESSPO manual. | Aluminium Paint Paint as per RESSPO manual. |
| 30 | Aluminium Winding Wire as per RESSPO manual. | Aluminium Winding Wire as per RESSPO manual. |
| 31 | Barbed Wire as per RESSPO manual. | Barbed Wire as per RESSPO manual. |
| 32 | 33 KV X-Arm Holding Clamp for STP as per RESSPO manual. | 33 KV X-Arm Holding Clamp for STP as per RESSPO manual. |
| 33 | 33 KV X-Arm Holding Clamp for PCC as per RESSPO manual. | 33 KV X-Arm Holding Clamp for PCC as per RESSPO manual. |
| 34 | 33 KV F-Bracket for STPas per RESSPO manual. | 33 KV F-Bracket for STPas per RESSPO manual. |
| 35 | 33 KV F-Bracket for PCC as per RESSPO manual. | 33 KV F-Bracket for PCC as per RESSPO manual. |
| 36 | Nut Bolt with Washer All Size as per RESSPO manual. | Nut Bolt with Washer All Size as per RESSPO manual. |
| 37 | Earthing Complete (Earthing Rod, GI Wire 6 SWG) | Earthing Complete (Earthing Rod, GI Wire 6 SWG) |
| 38 | Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. | Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. |
| 39 | Erection/Instalation/Fixing of 33 KV Line Ajnar to Dhawrra/Kulpahad Nishwara Line following :- | Erection/Instalation/Fixing of 33 KV Line Ajnar to Dhawrra/Kulpahad Nishwara Line following :- |
| 40 | Filling & Fixing of 33/11 KV 3X300 Sqmm Cable Jointing Kit Outdoor Type as per RESSPO manual. | Filling & Fixing of 33/11 KV 3X300 Sqmm Cable Jointing Kit Outdoor Type as per RESSPO manual. |
| 41 | Fxing of Stone Pad as per RESSPO manual. | Fxing of Stone Pad as per RESSPO manual. |
| 42 | Fixing of Earth Wire Clamp with Nut & Bolt as per RESSPO manual. | Fixing of Earth Wire Clamp with Nut & Bolt as per RESSPO manual. |
| 43 | Work of Aluminium Paint Paint as per RESSPO manual. | Work of Aluminium Paint Paint as per RESSPO manual. |
| 44 | Work of Aluminium Winding Wire as per RESSPO manual. | Work of Aluminium Winding Wire as per RESSPO manual. |
| 45 | Fixing of Barbed Wire as per RESSPO manual. | Fixing of Barbed Wire as per RESSPO manual. |
| 46 | Fixing of 33 KV X-Arm Holding Clamp for STP as per RESSPO manual. | Fixing of 33 KV X-Arm Holding Clamp for STP as per RESSPO manual. |
| 47 | Fixing of 33 KV X-Arm Holding Clamp for PCC as per RESSPO manual. | Fixing of 33 KV X-Arm Holding Clamp for PCC as per RESSPO manual. |
| 48 | Fixing of 33 KV F-Bracket for STPas per RESSPO manual. | Fixing of 33 KV F-Bracket for STPas per RESSPO manual. |
| 49 | Fixing of 33 KV F-Bracket for PCC as per RESSPO manual. | Fixing of 33 KV F-Bracket for PCC as per RESSPO manual. |
| 50 | Fixing of Earthing Complete (Earthing Rod, GI Wire 6 SWG) | Fixing of Earthing Complete (Earthing Rod, GI Wire 6 SWG) |
| 51 | Fixing of Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. | Fixing of Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. |
| 52 | Cartage & Erection of STP Pole11 Mtr. Long as per RESSPO manual (Provided by the Dept.) | Cartage & Erection of STP Pole11 Mtr. Long as per RESSPO manual (Provided by the Dept.) |
| 53 | Cartage & Erection of PCC Pole 9 Mtr. Long as per RESSPO manual (Provided by the Dept.) | Cartage & Erection of PCC Pole 9 Mtr. Long as per RESSPO manual (Provided by the Dept.) |
| 54 | Fixing of 33 KV MS-X Arm \\"V\\" Type as per RESSPO manual (Provided by the Dept.) | Fixing of 33 KV MS-X Arm \\"V\\" Type as per RESSPO manual (Provided by the Dept.) |
| 55 | Fixing of 33 KV Disc Insulator as per RESSPO manual (Provided by the Dept.) | Fixing of 33 KV Disc Insulator as per RESSPO manual (Provided by the Dept.) |
| 56 | Fixing of 33 KV Disc Fitting as per RESSPO manual (Provided by the Dept.) | Fixing of 33 KV Disc Fitting as per RESSPO manual (Provided by the Dept.) |
| 57 | Fixing of 33 KV Composite Polymer Pin with Nut (Provided by the Dept.) | Fixing of 33 KV Composite Polymer Pin with Nut (Provided by the Dept.) |
| 58 | Laying, stringing ACSR DOG Conductor (Provided by the Dept.) | Laying, stringing ACSR DOG Conductor (Provided by the Dept.) |
| 59 | Fixing of GI Wire 6 SWG (Provided by the Dept.) | Fixing of GI Wire 6 SWG (Provided by the Dept.) |
| 60 | Fixing of 33 KV Gaurding Angle with Clamp nut & Bolt (Provided by the Dept.) | Fixing of 33 KV Gaurding Angle with Clamp nut & Bolt (Provided by the Dept.) |
| 61 | Laying of 3X300 XLPE cable & Laying of GI Pipe 6\\" MM Dia (60 Mtr.) By HDD Driling Mathaud for NH Hiway Jhansi Khajuraho at site Nogaun Dhawrra as required as per RESPO norms and direction by supervising Engineer. (Cable Provided by the Dept.) | Laying of 3X300 XLPE cable & Laying of GI Pipe 6\\" MM Dia (60 Mtr.) By HDD Driling Mathaud for NH Hiway Jhansi Khajuraho at site Nogaun Dhawrra as required as per RESPO norms and direction by supervising Engineer. (Cable Provided by the Dept.) |
| 62 | Concreting of Support Stay Set. including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support Stay Set. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 63 | Concreting of Support PCC Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support PCC Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 64 | Cartage & Dismentling old & Damage 3X300 XLPE Cable Material from Site to Store ESC Mahoba. | Cartage & Dismentling old & Damage 3X300 XLPE Cable Material from Site to Store ESC Mahoba. |
| 65 | Note: Any quantity of item from sl no. 1 to sl no. 4.25 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 4.25 may vary to any limit within the financial value of agreement against this tender. |