| 1 | Clearing grass and removal of rubbish up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of Engineer -in –charge. |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge. |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). |
| 4 | Construction of granular sub-base by providing close graded granular sub base Grading III material as per table 401-1, spreading in uniform layer with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC ,and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MoSRT&H Specification for Road & Bridge works (4 th Revision) |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision). |
| 6 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Technical Specification Clause 502 of MOSRT&H including cost, conveyance, royalty, taxes of chips and bitumen & other required materials etc. complete and as per direction of Engineer-In-Charge. |
| 7 | Providing and laying tack coat with penetration grade of bitumen emulsion (RS) of 0.20 Kg per Sqm after scraping cleaning the road surface including cost, conveyance royalty of all materials, T&P labour, hire charges of machinaries etc. complete as per Technical Specification Clause 503 of MOSRT&H and as per direction of the Engineer in charge. |
| 8 | Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH spefn. clause No. 508 complete. |
| 9 | Fine dressing and turfing to the slopes of the road embankment with compact dub gross transported by mechanical means as per the direction of the E.I.C. |
| 10 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m |
| 11 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction, expansion and construction joints, applying sealant, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification as per direction of the Engineer-in-Charge. |
| 12 | Earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of Engineer in Charge. |
| 13 | Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. |
| 14 | Plain cement concrete M-15 grade in Foundation complete as per drawing and technical specification. |
| 15 | Plain cement concrete M-15 grade in Sub-Structure complete as per drawing and technical specification. |
| 16 | Providing Weep Holes is Brick Masonry/Paln/Rainforced concrete abutment, wing wall / return wall with 100mm dia AC pipe, extending through the full width of the structure wirh slope of IV:2Htowards drawing force etc, complete. |
| 17 | R.C.C work of M-25 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. |
| 18 | Supplying,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification.(AR,P-52) |
| 19 | Supplying , Laying & Fixing 600mm dia NP3 RCC hume pipe in position for culvert including pointing ends , fixing collars with cement mortar (1:2) including cost conveyance and taxes of hume pipe etc complete. |
| 20 | Construction of precast RCC railing of M25 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. |
| 21 | R.C.C. M-25 grade using 20 mm size and down graded black hard granite (crusher broken) stone chips including hosting and laying, well rammed with cost, conveyance, royality, taxes of all materials and all labour, T&P, etc. complete. |
| 22 | Pier Cap |
| 23 | Dirt wall |
| 24 | Deck Slab |
| 25 | Providing stone pitching in slopes etc complete as per drawings and technical as per direction of E.I.C. |
| 26 | Finishing wall surface with waterproof cement paint of aproved shade 2 coats including watering, curing,cost of all materials & labour etc. |
| 27 | Information Sign Board |
| 28 | Citizen Board |
| 29 | Direction & Place Identification Board |
| 30 | 600mm equilateral triangle |
| 31 | 600mm Circular |
| 32 | Fixing of Ordinary KM stone |
| 33 | Fixing of 200 metre stone |
| 34 | Guide Post |
| 35 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment ,level and slopes as per technical specification Clause 1902 |
| 36 | 1 st Year |
| 37 | 2 st Year |
| 38 | 3 st Year |
| 39 | 4 st Year |
| 40 | 5 st Year |
| 41 | Making up loose of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 |
| 42 | 1 st Year |
| 43 | 2 st Year |
| 44 | 3 st Year |
| 45 | 4 st Year |
| 46 | 5 st Year |
| 47 | Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 |
| 48 | 1 st Year |
| 49 | 2 st Year |
| 50 | 3 st Year |
| 51 | 4 st Year |
| 52 | 5 st Year |
| 53 | Maintenance of BT road including filling up pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B specification Clause 1904.2 ,1906 |
| 54 | 1 st Year |
| 55 | 2 st Year |
| 56 | 3 st Year |
| 57 | 4 st Year |
| 58 | 5 st Year |
| 59 | Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 |
| 60 | 1 st Year |
| 61 | 2 st Year |
| 62 | 3 st Year |
| 63 | 4 st Year |
| 64 | 5 st Year |
| 65 | Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910 |
| 66 | 1 st Year |
| 67 | 2 st Year |
| 68 | 3 st Year |
| 69 | 4 st Year |
| 70 | 5 st Year |
| 71 | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 |
| 72 | 1 st Year |
| 73 | 2 st Year |
| 74 | 3 st Year |
| 75 | 4 st Year |
| 76 | 5 st Year |
| 77 | Cutting of branches of trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 |
| 78 | 1 st Year |
| 79 | 2 st Year |
| 80 | 3 st Year |
| 81 | 4 st Year |
| 82 | 5 st Year |
| 83 | Cutting of shrubs from the road way or with in R.O.W and disposal of shrubs to suitable locations as per technical specifications Clause 1914 |
| 84 | 1 st Year |
| 85 | 2 st Year |
| 86 | 3 st Year |
| 87 | 4 st Year |
| 88 | 5 st Year |
| 89 | Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914 |
| 90 | 1 st Year |
| 91 | 2 st Year |
| 92 | 3 st Year |
| 93 | 4 st Year |
| 94 | 5 st Year |
| 95 | White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915 |
| 96 | 1 st Year |
| 97 | 2 st Year |
| 98 | 3 st Year |
| 99 | 4 st Year |
| 100 | 5 st Year Please Enable Macros to View BoQ information |