| 1 | Dismentling of old damaged pavement i/c stacking dismentled material with in 60m in distance as directed by engineer incharge |
| 2 | Construction of subgrade with material obtained from borrow pits for local earth construction of embankment with approved material obtained from abailable land and permitted and approved by Engineer in charge and as per technical specification clause 301. |
| 3 | Resoling with serviceable material obtained |
| 4 | Excavation in foundation in ordinary soil (loam clay or sand ) includig lift upto 1.50 metre and lead upto 30 metre . Including filling watering & ramming of excavated earth into the trenches of into the space between the building & the sides of foundation trenches or into the plinth & removal & disposal of surpluse earth as directed by the Engineer incharge upto a distance of 30 m from the foundation trenches. (Excluding Royality Rs. 30 ) As per S.I. No. 251 Excluding GST |
| 5 | Concrete with 40mn gauge B/B, fine sand of 1.25 FM and Cement in proportion of 12:6:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. SI.N0.273 |
| 6 | M-150 Brick work in 1:4 cement & fine sand (1.25 F.M.) mortar morter in foundation and plinth including supply of all materials, labour & tools & plants etc. required for proper completion of the work. Excluding GST. SI No. 305 |
| 7 | Provoiding concrete for plain/reienforced concrete in open foundations as per drawing and technocal specifications clauses 802,803,1202,1203 (11.4(iii) 800 and1200) |
| 8 | 12mm thick plaster with 1:4 cement and find sand morter over brick or stone masonry work including supply of all materials, labour ,T&P etc. required for proper completion of the work . Exculding GST. As per S.I. No. 597© |
| 9 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and cam |
| 10 | Provoiding and laying of Rubber Moulded Reflective Zig-Zag 80mm thick tiles of precost compressed C.C. Passing miniumum 30mpa compressive strength-ISI Marked concrete block pavements having thickness 80 mm as per technical specification clause 1504 |
| 11 | R.C.C work with with cement approved course sand and 2 cm approved stone grit in praportion of 1:1.5:3 in SLAB excluding supply of renforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire including necess |
| 12 | M.S. (tor steel or plain) in plain work such as Rcc or R.B. work including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Exculding GST. SI No. 504 |
| 13 | Suppply and fixing of sign board I/C all. |
| 14 | As per Order of Joint Secretary G.O. No. G-1877 Dated 21-02-2025 and Director cum-chief Engineer U.P. RED, Lucknow Latter No 801 Dated 03-03-2025 Deduction 5% for Comptetive Price Effciency Please Enable Macros to View BoQ information |