| 1 | The work of In the Business Plan 2026-27, the work of strengthening/Agumentation 33 KV power lines and 33/11 KV power substation Alipura under the distribution subdivision Kabrai (on semi-turnkey basis). under EDD-II, MAHOBA, including carriage of all required Line material/Transformers from ESC/Workshop Mahoba to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/dismentled line material/T/Fs from site to store centre/workshop, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- | The work of In the Business Plan 2026-27, the work of strengthening/Agumentation 33 KV power lines and 33/11 KV power substation Alipura under the distribution subdivision Kabrai (on semi-turnkey basis). under EDD-II, MAHOBA, including carriage of all required Line material/Transformers from ESC/Workshop Mahoba to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/dismentled line material/T/Fs from site to store centre/workshop, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- |
| 2 | Supply of following materials :- | Supply of following materials :- |
| 3 | Stone Pad as per RESSPO manual. | Stone Pad as per RESSPO manual. |
| 4 | X-Arm Holding Clamp for STP as per RESSPO manual. | X-Arm Holding Clamp for STP as per RESSPO manual. |
| 5 | X-Arm Holding Clamp for PCC as per RESSPO manual. | X-Arm Holding Clamp for PCC as per RESSPO manual. |
| 6 | 33 KV F-Bracket for STP as per RESSPO manual. | 33 KV F-Bracket for STP as per RESSPO manual. |
| 7 | 33 KV F-Bracket for PCC as per RESSPO manual. | 33 KV F-Bracket for PCC as per RESSPO manual. |
| 8 | Earthing Complete (Earthing Rod, GI Wire 6 SWG) | Earthing Complete (Earthing Rod, GI Wire 6 SWG) |
| 9 | Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. | Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. |
| 10 | Erection/Instalation/Fixing of following :- | Erection/Instalation/Fixing of following :- |
| 11 | Erection of Stone Pad as per RESSPO manual. | Erection of Stone Pad as per RESSPO manual. |
| 12 | Fixing of X-Arm Holding Clamp for STP as per RESSPO manual. | Fixing of X-Arm Holding Clamp for STP as per RESSPO manual. |
| 13 | Fixing of X-Arm Holding Clamp for PCC as per RESSPO manual. | Fixing of X-Arm Holding Clamp for PCC as per RESSPO manual. |
| 14 | Fixing of 33 KV F-Bracket for STP as per RESSPO manual. | Fixing of 33 KV F-Bracket for STP as per RESSPO manual. |
| 15 | Fixing of 33 KV F-Bracket for PCC as per RESSPO manual. | Fixing of 33 KV F-Bracket for PCC as per RESSPO manual. |
| 16 | Fixing of Earthing Complete (Earthing Rod, GI Wire 6 SWG) | Fixing of Earthing Complete (Earthing Rod, GI Wire 6 SWG) |
| 17 | Fixing & Erection of Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. | Fixing & Erection of Stay Complete - ( Stay Set , Stay Insulator, Stay Clamp , Stay Wire ) as per RESSPO manual. |
| 18 | Cartage & Erection of STP Pole 11 Mtr. Long as per RESSPO manual (Provided by the Dept.) | Cartage & Erection of STP Pole 11 Mtr. Long as per RESSPO manual (Provided by the Dept.) |
| 19 | Cartage & Erection of PCC Pole 9 Mtr. Long as per RESSPO manual (Provided by the Dept.) | Cartage & Erection of PCC Pole 9 Mtr. Long as per RESSPO manual (Provided by the Dept.) |
| 20 | Fixing of 33 KV MS-X Arm \\"V\\" Type as per RESSPO manual (Provided by the Dept.) | Fixing of 33 KV MS-X Arm \\"V\\" Type as per RESSPO manual (Provided by the Dept.) |
| 21 | Fixing of 33 KV Pin Insulator (Provided by the Dept.) | Fixing of 33 KV Pin Insulator (Provided by the Dept.) |
| 22 | Fixing of 33 KV Pin with Nut (Provided by the Dept.) | Fixing of 33 KV Pin with Nut (Provided by the Dept.) |
| 23 | Laying, stringing ACSR DOG Conductor (Provided by the Dept.) | Laying, stringing ACSR DOG Conductor (Provided by the Dept.) |
| 24 | Concreting of Support PCC Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support PCC Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 25 | Cartage & Dismentling Conductor of old & Used Material from Site to Store | Cartage & Dismentling Conductor of old & Used Material from Site to Store |
| 26 | Note: Any quantity of item from sl no. 1 to sl no. 2.15 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 2.15 may vary to any limit within the financial value of agreement against this tender. |