| 2 | Jobs to be done:1.Complete Gear box assy. removing, dismantling, O/H and refitting in hyva. 2.Accessories removing & fitting.3. Machining job for Gear box main shaft welding and repairing, gear box lever welding repairing and making.4. Complete hydraulic tipping valve assy. dismantling, tipping valve body refacing, repairing and fitting. 5. Comp. steering system dismantling, steering kit, steering box cross member, steering cross, steering rake with pinion, steering box worn shaft assy., steering bearing etc. new replacement and fitting.6. Both side cabin mounting removing, changing and fitting.7. Both side Driver cabin door lock and handle changing and fitting.8. Front both side king pin overhauling, necessary machining with parts like king pin kit full set, king pin spindle brass bush 01 set, front spindle big bearing 02 no, hub oil seal 02 no. etc. to be replaced. 9. Tie rod end & draglink changing and wheel alignment.10. Rear and front 06 set spring leaf removing, 10 no leaf cutting and hole making, 08 no spring leaf welding and grinding, necessary recambering and fitting.11. Rear and front spring bell crank 04 no removing and fitting.12. Rear spring bell crank 04 no damage hole new making, welding, machining proper size, bell crank bush, bell crank pin big & small size to be replaced with all bell crank bush raimring, machining and fitting. 13. Rear and front spring hanger removing, new hanger with bolt changing and fitting.14. Rear and front spring 06 no shakle removing and new shakle fitting.15. Rear and front spring balance rod lever welding, making and repairing & bush raimring, machining and fitting. Materials/Spares to be replaced: Gear box oil packing kit 01 no, Gear box engaging 2nd gear pinion 01 no, Gear box 2nd speed pinion 01 no, Gear box counter shaft assy. 01 no, Gear box idler gear 01 no, Gear box brass pad 01 set, Gear box roller bearing 03 set, Gear box synchronizer ring 02 no, Gear box brass ring 02 no, Gear box gork assy. 01 set, Gear box shifter shaft 01 no, Gear box shifter dog 01 set, Cabin mounting 02 Set, Door lock assy. 02 set, Door kabja bolt 04 no, Rear spring bell crank bush 04 set, Rear spring bell crank pin big size 06 no, Rear spring bell crank pin small size 06 no, Rear spring pin 08 no, Rear spring bush 08 no, Front spring pin 04 no, front spring bush 04 no, Centre bolt 06 no, Quotter pin bolt 22 no, Spring U bolt 02 no, Spring clamp with bolt 12 inch 04 no, Rear and front spring clamp with bolt 08 inch 06 no, Rear and front spring clamp with bolt 6 inch 05 no, Spring hanger 02 no, Spring shackle 02 no, Spring side washer 8mm 48 no, Spring washer 6 mm 52 no. etc. Repairing work should be completed with all required materials and manpower. |