| 1 | Construction of granular sub base by providing well graded material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achive desire density complete as per technical specification clause as per MORD 401 |
| 2 | M-150 Class B/W in 1:4 cement, coarse sand 1.25 F.M motar in foundation and plinth including supply of all materials, labour , T & P etc. As per P.W.D. S.I. No. 305(a) |
| 3 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with grade cementcoarse aggregate not exceeding 25 mm, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. |
| 4 | 12 mm thick plaster in 1:4 cement and coarse sand mortar on brick work minimum thickness not to be less than 1 cm. including supply of all materials, labour,T & P etc. As per SI No 584(a) |
| 5 | P.C.C work in 1:2:4 Cement, c/ sand, and 20 mm stone grit including supply of all materials, labour , T & P etc. As per S.I.No 279(a) |
| 6 | R.C.C. Work with cement approved coarse sand and 2 cm. gauge approve stone grit in proportions of R.C.C column in 1:2:4 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary, centering & shuttering etc. and supply of all material, labour, tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. |
| 7 | MS (Tor steel or plain)in plain work such as RCC or RB work including binding for proper shape and including supply of steel & its wastage bend, hooks and authorized overlapping shall be measured and including cost for binding wire. SINo. 504 |
| 8 | Providing & Fixing of granite inogration stone for display board including of all work complete |
| 9 | ADD GST 18% Please Enable Macros to View BoQ information |