| 1 | Dismantling brick or stone masnory in lime or cement including stacking within 60m. |
| 2 | Dismantling R.C.C.work including stacking materials within 60m. |
| 3 | Dismantling C.C.work including stacking materials within 60m. |
| 4 | Earth Work in making/removing diversion i/c all lead & lift, labour and T&P etc. |
| 5 | Earth Work in excavation/Filling in foundation in ordinary soil including initial lead & lift i/c all labour and T&P etc. |
| 6 | Laying C.C. 1:3:6 Mix (M-10) cement, coarse sand & 20 mm down graded stone shighle including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. |
| 7 | Laying Brick work C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete. |
| 8 | Struck deep pointing in 1:2 cement mortar including cost of all material, labour and T&P etc. complete. |
| 9 | Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone shighle including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering & Reinforcement. |
| 10 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone shighle including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. |
| 11 | Centering & Shuttering For slab and Bed Block including all cost of material labour T&P etc. for complete work. |
| 12 | Providing and fixing in position pre-moulded joint filler in expansion joint. |
| 13 | Supplying and laying tarfelt sheet below aproach slab as paper bearing including cost of all material labour and T&P required for proper completion of work. |
| 14 | Finishing wall with one coat of water proof cement paint weather coat of approved quality on previously new surface with this paint to give an even shade including supply of all materials labour tools & plant etc. required for proper completion of the work. |
| 15 | Reinforcement in slab, Bed Block laying,cutting, bending, binding and placing in position including all cost of material, labour, T&P etc. for complete work. |
| 16 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. |
| 17 | Supplying & Fixing 75MM dia pipe for drain spout including cost of all material, labour and T&P etc. required for proper completion of work. |
| 18 | Retro Reflective sign board are made of 2mm.thick ACP Sheet to be fully covered with enginurs, grade Retro reflective as per colour required by i/q. the Retro reflective - sheet shall be proceed on Aluminum leased as per recommendation, text and sign.Text and sign symbols will be computerized and fabricated on N.T. grade. The sheet with lives,of extra frame of angie iron 32x32x3mm duly painted. One or two posts of M.S .heavy duty channel of 75x35x35 3000mm long and painted with super. Synthetic enamel paint. Please Enable Macros to View BoQ information |