| 1 | As Per RUIDP SOR 2023 |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.Depth upto 1.5 m |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 5 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix :1:4 (1 cement : 4 fine/ coarse sand) |
| 8 | Kota stone slab 20 mm to 25 mm thick (semi-polished) area 2001-5000 sqcm |
| 9 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. |
| 10 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: |
| 11 | Providing and fixing stone slab covering of required size over drains including filling of joints with cement sand mortar 1:3 complete as per direction of Engineer-in-charge |
| 12 | Providing and Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form work 300MM |
| 13 | TOTAL S.NO 02 TO 12 Amoun17742.01 says 10.00 Lac Please Enable Macros to View BoQ information |