| 1 | Cable 1.1kV PVC Insulated AL Twin Core 2.5 Sq.mm PVC Sheathed Weather Proof (TC Weather Proof Wire 1/1.8) |
| 2 | Cable 1.1kV PVC Insulated AL Twin Core 6 Sq.mm PVC Sheathed Weather Proof (TC Weather Proof Wire 1/2.8) |
| 3 | FUSE UNIT 415 V 200A PORCELAIN |
| 4 | FUSE UNIT 415 V 300A PORCELAIN |
| 5 | Cable 1.1kV XLPE AL 1c x150 sq mm (Un Armoured) |
| 6 | Cable 1.1kV XLPE AL 1c X 120 sq mm (Un Armoured) |
| 7 | Cable 1.1kV XLPE AL 1c X 95 sq mm (Un Armoured) |
| 8 | Lightning Arrester 11kV Polymeric insulator without Structure |
| 9 | End Termination Kit HT ABC 3c x 150 Sq.mm |
| 10 | Cable End Termination Kit 11 kV XLPE 3c x 300 Sq.mm -Heat Shrinkable (Outdoor) |
| 11 | Cable Straight Joint Kit 33 kV XLPE 3c x 300 Sq.mm-Heat Shrinkable (Outdoor) |
| 12 | Preformed cable tie for 33kV covered conductor 329 sq.mm |
| 13 | Covered Conductor 120 Sq.mm-33 kV AAC (274 A) |
| 14 | Mid span joint for 33 kV 120 sq.mm covered conductor |
| 15 | Lightning Arrester 33 kV,10 KA(Station class) Porcelain Housing |
| 16 | Insulation Piercing Connector for Covered Conductor -Main 35-240 Sq.mm, Tap 35-240 Sq.mm( For AAAC Covered Conductor) |
| 17 | Cable end termination kit 33kV XLPE 3x300 mm2 Al Heat shrinkable outdoor |
| 18 | Tension Insulator 33 kV Class Polymeric with special string hardware & accessories |
| 19 | Pin Insulator 33 kV Composite Polymeric |
| 20 | Isolator with structure 33kV 800A Double Break Tripple Pole without E/S |
| 21 | Channel cross arm GI 75 x 40mm -2.4 mt |
| 22 | CROSS ARM GI CHANNEL 100X50 mm 3 M |
| 23 | CLAMP GI FOR HT CROSS ARM |
| 24 | V cross arm GI 33 kV |
| 25 | Clamp GI for 33 kV line V cross arm |
| 26 | Stay Insulator Porcelain 33kV |
| 27 | Anchor Plate 200 x 200 x 8 mm GI (HT Stay Plate GI)) |
| 28 | Stay Wire 7/8 (7/3.15mm) GI (HT Stay Wire) |
| 29 | Stay Rod (Anchor Rod) GI 20 mm dia (HT Stay Rod) |
| 30 | Turn Buckle ,Eye bolt with 2 Nuts 20 mm dia -GI(Stay tightner HT) |
| 31 | GI Wire 6 SWG |
| 32 | Pipe GI 40 mm dia -2.5 m Length( Earth Pipe) |
| 33 | Earthing Coil-GI - 115 Turns- 50 mm internal Dia (Free end GI Wire length 13 mt) |
| 34 | BOLT & NUT GI OF SIZES |
| 35 | Conductor ACSR Raccoon |
| 36 | Conductor ACSR Rabbit |
| 37 | MS Cleat |
| 38 | Clamp GI for Cable Support Pipe |
| 39 | Cable 33kV XLPE AL UG 3c x 300 sq mm (Armoured) |
| 40 | CROSS ARM GI CHANNEL 4 LINE(4 Linechannel cross arm) for PSC Poles 8M/200kg |
| 41 | Clamp GI for LT 2/4 Line Cross arm |
| 42 | Channel Cross arm GI - LT 2 Line 75 x 40 mm (2 line Channel Cross arm) |
| 43 | PIN INSULATOR 415V SET(WITH PIN) |
| 44 | Packing Clamp ( U Clamp) |
| 45 | Pipe HDPE 125 mm |
| 46 | Coupler for HDPE Pipe 125 mm |
| 47 | SHACKLE INSULATOR 415V SET(WITH STRAP BOLT&NUT) |
| 48 | Disc Insulator 11 kV Composite Polymeric |
| 49 | Cleat GI for 11kV Disc insulator |
| 50 | Pin Insulator 11kV Composite Polymeric |
| 51 | Hardware Fittings 11kV B&S Type |
| 52 | Termination kit for 33 kv 120 sq mm covered conductor |
| 53 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 54 | Dismantling one damaged LT TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 55 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 56 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 57 | Providing one Driven Earth using GI earth pipe of size38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. |
| 58 | Providing Cable Tie |
| 59 | 15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within50 metres lead as per direction of Engineer - in- Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 60 | Re-joining one snapped HT conductor after removing damagedportionincludingre- tensioning and conveyance of all materials complete. |
| 61 | Laying 3 x 300 sq mm XLPE cables in trench including drawing through pipes wherever necessary. |
| 62 | Doing outdoor/indoor cable termination of 3x300 mm2 33KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket |
| 63 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 64 | Erection of 1 No. 33KV LA/Post insulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers. of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers. |
| 65 | Mounting one 3x300 mm2 XLPE outdoor cable termination of structures very carefully without causing any damage to the drilling holes wherever necessary as directed by the departmental officers |
| 66 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 67 | Labour charges for loading LT TW/RSJ/Rail pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 68 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 69 | Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 numbers of poles. (Running km) |
| 70 | Dismantling of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16 (Street Light) + 1 x50 Sq.mm. (Insulated Messenger) |
| 71 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 72 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizondal brasing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation |
| 73 | Brick work in cement mortar 1:4 with country burnt bricks for superstructure as per the direction of departmental staff |
| 74 | Doing straight joint of 3x300 mm2 33KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket |
| 75 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. for one km additional conductor (ACSR Rabbit) on existing LT line (where realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 76 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. |
| 77 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line. |
| 78 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 79 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 80 | Transporting minor materials |
| 81 | 13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturers specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work |
| 82 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5cm in width. including cost of paint. |
| 83 | Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x 150+ 1 x120 sqmm with bare insulated Messenger |
| 84 | Stringing of 11 kV Aerial bunched cable of size 3 x 150+ 1 x 120 sqmm with bare/insulated Messenger through existing poles |
| 85 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 86 | Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 87 | Cutting trees having girth beyond 60cm but upto and including 120cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. |
| 88 | Cutting trees having girthbeyond 120cm but upto and including 180cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No |
| 89 | Dismantling one set 2x40 W fluorescent tube fitting from existing pole cleaning, rewiring, repairing/replacing holder, changing tubes and refitting the same in position and giving connection. |
| 90 | Dismantling one set 1x40 W fluorescent tube fitting from existing pole cleaning, rewiring, repairing/replacing holder, changing tubes and refitting the same in position and giving connection. |
| 91 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 92 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 93 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 94 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 95 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 96 | Dismantling one damaged LT PSC/RCC Strut pole including removal of clamps and stacking. |
| 97 | Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking. |
| 98 | Dismantling one LT 2 line cross arm with clamp from existing pole and stacking. |
| 99 | Dismantling one LT 4 line cross arm with clamp from existing pole and stacking. |
| 100 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. |
| 101 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 102 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 103 | Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. |
| 104 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 105 | Dismantling one section fuse from structure and bringing back to section store. |
| 106 | Dismantling one section fuse from distribution box and bringing back to section store. |
| 107 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 108 | Dismantling one damaged 11kV A type pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 109 | Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 110 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 111 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 112 | Renewal of existing damaged/old 11kV PSC/RCC DP with new A type DP in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles. |
| 113 | Renewing one damaged PSC/RCC Transformer DP structure with a new A type Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing. |
| 114 | Dismantling one damaged HT PSC/RCC Strut pole including removal of clamps and stacking. |
| 115 | Dismantling (without damage) one HT PSC/RCC Strut pole including removal of clamps and stacking. |
| 116 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 117 | Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. |
| 118 | Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store. |
| 119 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. |
| 120 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 121 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 122 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing(excludingprovision of earthing) |
| 123 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 124 | Erection of suspension clamp for 11KV ABC of any size |
| 125 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 126 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 127 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connectionsincludingcutting and removing tree branches wherever necessary excluding cut point works. |
| 128 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 129 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 130 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 131 | 2.16.1 : Close timbering in trenches including strutting, shoring and packing cavities (whereverrequired)complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m |
| 132 | 2.16.2 : Close timbering in trenches including strutting, shoring and packing cavities (whereverrequired)complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m |
| 133 | Dewatering Manual |
| 134 | 4.3.1 : Centering and shutteringincludingstrutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 135 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 136 | 5.22.1 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars |
| 137 | 2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 138 | Fitting and providing one Strut using A type pole, including digging and back filling pit in ordinary soil. |
| 139 | Erection of one set 33KV Bus Isolator on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers. |
| 140 | Constructing Transformer plinth of size 1.5x1.5x1.5m on 1.8x1.8x0.75m basement inclusive of cost of all materials. [Excavation 1.8x1.8x0.75m, Random Rubble in CM(1:6) 1.8x1.8x0.75m +1.5x1.5x1.5m, concrete (1:2:4, 20mm) 1.5x1.5x0.10m, plaster CM (1:3) 12mm, 1.5x1.5m, Pointing CM (1:3)1.5x1.5mx 4 sides]. |
| 141 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 142 | Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. |
| 143 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 144 | 2.9.1 : Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock |
| 145 | 13.7.1 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) |
| 146 | Transporting 14 m lattice tower parts and connected accessories to an average distance of 5 Km by lorry. |
| 147 | Transporting 14 m lattice tower parts and connected accessories to an average distance of 50 m by head load . |
| 148 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m., Extra for every additional lift of 1.5 m or part there of in. From 1.5 M to3 M( one additional lift, Ordinary rock |
| 149 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to1.5 m, disposed earth to be levelled and neatly dressed. Ordinary rock Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials. Ordinary or hard rock |
| 150 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm in depth 1.5 m in width or 10 sqm on plan), including disposal of surplus excavated soil as directed, within a lead of 50 m and lift up to 1.5 m up to 3m,disposed (including extra for for every additional lift of1.5m or part there of in from1.5 to 3m) all kinds of soil. |
| 151 | Excavation work by mechanical means(Hydraulic excavator)/ manual means in foundation trenches or drains ( exceeding30 cm in depth1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.(Hard rock)(including extra for for every additional lift of 1.5m or part there of in from 1.5 to 3m) |
| 152 | Excavation work by mechanical means(Hydraulic excavator)/ manual means in foundation trenches or drains ( exceeding30 cm in depth1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.(Hard rock)(including extra for for every additional lift of 1.5m or part there of in from 1.5 to 3m) |
| 153 | Stub setting in lines and levels using template in concrete foundation and removing the template after the expiry of the predetermined time, etc. for14 m A,B,C type lattice towers,etc as per specification and as directed by the departmental staff at site. |
| 154 | Erection of tower superstructure above the ground level including erection of normal and special hill side members, wherevernecessart,providing insulators,cross arms, tower accessories etc for 14 m A,B,C type lattice towers,etc as per approved drawing and direction of the departmental staff at site. |
| 155 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size |
| 156 | cutting of GI channel, ISMBs, ISMC 100 GI angle as per specification including conveyance of materials and machinery to the site, etc. as per approved drawings and as directed by departmental staff at site. |
| 157 | steel work in GI angles, channels, etc. including cutting hoisting and fixing in position including applying a coat of zinc chromate primer over the exposed surface, etc. complete as per approved drawing and as directed by departmental staff at site. |
| 158 | Fitting one additional 33kV pin with insulator (1.5 times the Rate for 11kV) |
| 159 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of 33kV pole for making cut point. (1.5 times that of 11kV) |
| 160 | Lifting cement concrete slabs of size 120cmx50cmx10cm/ 100cmx70cmx10cm/ 100cmx50cmx10cm, laid over cable trenches for laying MS rods beneath the trench, placing the slabs carefully to the sides of trenches and replacing the slabs in original position after the completion of works. |
| 161 | Stringing 33kV,120Sqmm XLPE Covered Conductor including fitting of all accessories, providing end termination, midspan joints,earthing, installing insulater piercing connectors etc. |
| 162 | Re-joining one snapped LT conductor after removing damaged portion including Reshackling and conveyance of all materials complete. |
| 163 | Re-Tensioning one span 11kV line including replacing pin insulators, pin binding,jumpering,replacing insulators cross arms disc, tightening stay, cutting tree branches etc. wherever necessary, including conveyance of all materials complete. |
| 164 | Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridgesetc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. |
| 165 | Charges for HDD including survey of site information collection regarding underground utilities, survey of utilities, pit marking, pilot drilling, Pre reaming pulling125 mm dia HDPE pipe (including cost of HDPE pipe, temporary restoration charges for HDD pit with 1:3:6 CC etc) |
| 166 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 167 | Fitting and providing one HT Fly stay for 11kV pole using A type pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing(excludingprovision of earthing). |
| 168 | Surveying and fixing pole location by peg marking in the cleared route, arranging the center line etc. complete as per the direction of dptl. Staff at site Please Enable Macros to View BoQ information |