|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 meters outside disposal of unserviceable materials with all leads, lifts and dellifts with cost of all labour, T & P, labour welfarecess etc.complete as per the direction of the Engineer-in-Charge. |
| 2 | Collecting,supplying and stacking good quality moorum from approved quarry and stacking the same at work site or at approved stack yard for premeasurement in regular box heaps of 1.50m x 1.50 m x 0.50 m to be measured as one cum and conveying from premeasured stacks and spreading the moorum over the prepared surface for sub-base not exceeding 10mm in layers to required thickness including watering and compacting to required density with P.R.R. including cost, conveyance,royalty ,DMF, EMF, additional charges and all other taxes of all materials and cost of labour , T&P, taxes required for the work including hire & running charges of machineries and labour welfare cess etc.complete in all respects,with all leads , lifts and delifts as per specification and as directed by Engineer-In-Charge. |
| 3 | Providing, laying, spreading and compacting stone aggregates of IRC Grade- I metal of size 90mm to 45mm free from weathered skin and deleterious materials to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tones in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials as moorum to fill up the interstices of coarse aggregates, watering & compacting to the required density and thickness of 75mm as per clause No. 404 of MOSRT&H specification for road and bridge works (4th revision) including cost, conveyance, royalty ,DMF, EMF, additional charges, taxes of all materials, hire and running charges of PRR with cost of all labour T&P required for the work, labour welfare cess etc. complete and as per specification & direction of the Engineer-in-Charge. (Measurement will be taken on the finished section only) |
| 4 | Earth work in suitable type of soil in borrow area, loading into transport vehicle manually and transportation of earth by mechanical means and unloading the same over the approved surface of embankment in proper profiles with all leads, lifts, delifts etc. including rough dressing and breaking the clods to maximum 5 cm to 7 cm size including removal of roots, bushes, other deleterious materials from transported earth with all cost, carriage, royalty ,DMF, EMF, additional charges, labour welfare cess & laying in layers not exceeding 22.50 cm in depth with hire & running charges of all machineries with all labour & T&P, taxes required for the work etc complete in all respects as per specification and the direction of the Engineer-In-Charge. (Measurement to be taken on Level Sections only and earth to be arranged by the contractor at his own cost and responsibility) |
| 5 | Rough stone dry packing in approns and revetments to proper profile using hard granite stones boulder of good quality having 15cm to 30cm size quarried and transported from approved quarry, free from weathered skin and any other deleterious materials including filling the interstices with small stones and jallies etc with cost of quarrying, conveyance, royalty and all other taxes of all materials with all labour, T&P, taxes required for the work with all leads, lifts and delifts, labour welfare cessetc complete in all respects as per specification and the direction of the Engineer-In-Charge. Please Enable Macros to View BoQ information |