| 1 | Capacity Enhancement of Distribution Transformer (Business Plan 2026-27) |
| 2 | Safe Loading, Carriage & Unloading of PCC Pole 8.5 mtr From Electricity Store Center Maharajganj to Work Site. |
| 3 | Safe Loading, Carriage & Unloading of 11 Kv X ARM From Electricity Store Center Maharajganj to Work Site. |
| 4 | Safe Loading, Carriage & Unloading of ACSR Weseal Conductor From Electricity Store Center Maharajganj to Work Site. |
| 5 | Safe Loading, Carriage & Unloading of 11 Kv Pin Insulator With Pin From Electricity Store Center Maharajganj to Work Site. |
| 6 | Safe Loading, Carriage & Unloading of 11 Kv Disc Insulator With Fitting From Electricity Store Center Maharajganj to Work Site. |
| 7 | Safe Loading, Carriage & Unloading of 11/0.4 T/F 25 KVA From Electricity Store Center Maharajganj to Work Site. |
| 8 | Safe Loading, Carriage & Unloading of 11/0.4 T/F 100 KVA From Electricity Store Center Maharajganj to Work Site. |
| 9 | Safe Loading, Carriage & Unloading of 11/0.4 T/F 250 KVA From Electricity Store Center Maharajganj to Work Site. |
| 10 | Safe Loading, Carriage & Unloading of STAY SET From Electricity Store Center Maharajganj to Work Site. |
| 11 | Safe Loading, Carriage & Unloading of Earthing Complite From Electricity Store Center Maharajganj to Work Site. |
| 12 | Safe Loading, Carriage & Unloading of LA From Electricity Store Center Maharajganj to Work Site. |
| 13 | Safe Loading, Carriage & Unloading of L.T. PVC Cable 3.5X150/70 sqmm From Electricity Store Center Maharajganj to Work Site. |
| 14 | Safe Loading, Carriage & Unloading of LT ABC Cable 3 X 95+1X70+1X16 sqmm From Electricity Store Center Maharajganj to Work Site. |
| 15 | Providing and Installation of 11 KV V X-ARM CLAMP as Per specification. |
| 16 | Providing and Installation of Transformer Base as Per specification. |
| 17 | Providing and Installation of F-braket with clamp as Per specification. |
| 18 | Providing and Installation of top channel as Per specification. |
| 19 | Providing and Installation of Dropper Channel as Per specification. |
| 20 | Providing and Installation of Top, Droper, T-Off Channel Clamp as Per specification. |
| 21 | Providing and Installation of Fuse Set as Per specification. |
| 22 | Providing and Installation of PG Clamp as Per specification. |
| 23 | Providing and Installation of LT Clamp as Per specification. |
| 24 | Providing and Installation of LT Clamp as Per specification. |
| 25 | Providing and Installation of Danger Board With Clamp as Per specification. |
| 26 | Providing and Installation of L.T. PVC AL. Cable 1X240 sqmm as Per specification. |
| 27 | Providing and Installation of Z clamp Copper as Per specification. |
| 28 | Providing and Installation of Barbed Wire as Per specification. |
| 29 | Providing and Installation of Alu. Lug as Per specification. |
| 30 | Providing and Installation of Nut & Bolt as Per specification. |
| 31 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (8.5 Mtr Long) as per drawing. |
| 32 | Erection of 8.5 mtr Single PCC Pole with all accessories (Cross arm, 11KV Pin insulator with pin, Disc Insulator, F-bracket etc.) as per specification. |
| 33 | Grouting of 8.5 mtr PCC Pole With Material as per specification. |
| 34 | Stringing sagging and binding of of ACSR Weasel Conductor on eracted pole |
| 35 | Dismentalling of 10 KVA Transformer |
| 36 | Dismentalling of 63 KVA Transformer |
| 37 | Dismentalling of 100 KVA Transformer |
| 38 | Installation of 25 KVA Distribution Transformer on erected PCC/STP Double Pole DT structure as per specification |
| 39 | Installation of 100 KVA Distribution Transformer on erected PCC/STP Double Pole DT structure as per specification |
| 40 | Making of plinth as per specification |
| 41 | Installation of 250 KVA Distribution Transformer on Plinth. |
| 42 | Intallation of Stay set complete as per specification |
| 43 | Concreting of stay set as per specification |
| 44 | Installation of Earthing Complete as per specification. |
| 45 | Installation of LA as per specification. |
| 46 | Installation of L.T. PVC Cable 3.5X150/70 sqmm as per specification. |
| 47 | Installation of LT ABC Cable 3 X 95+1X70+1X16 sqmm as per specification. |
| 48 | Making of Pale Fencing as per specification |
| 49 | Carriage of Dismentalled Material from work site to store location Please Enable Macros to View BoQ information |