| 1 | PART - A (MATERIAL PROVIDED BY CONTRACTOR) |
| 2 | Structure For cable support |
| 3 | \\"L\\" Type Structure for Neutral |
| 4 | 11 KV cable jointing kit 3×300 mm outdoor heat shrinkable Type |
| 5 | 11 KV cable jointing kit 3×300mm indoor heat shrinkable Type |
| 6 | 11 KV cable jointing kit 3×185 mm outdoor heat shrinkable Type |
| 7 | 11 KV cable jointing kit 3×185 mm Indoor heat shrinkable Type |
| 8 | 24 volt battery and battery charger with cabinet |
| 9 | GI pipe 6\\" dia over the 3x300/185 sqmm XLPE cable |
| 10 | Holding Clamp for 3×300 XLPE 11 KV Cable |
| 11 | MS dropper Channel |
| 12 | GI pipe/cable(3x185sqmm) & dropper Channel Holding Clamp |
| 13 | M.S. Nut Bolt and washers |
| 14 | P.G Clamp For Dog to Dog |
| 15 | Rubber Mat |
| 16 | PART - B WORKShifting & loading of following materials on private truck at store centre Deoria & carriage up to 33/11 KV Sub-Station Bankatiya Dubey, Distt- Deoria & Un-loading of the same with proper stacking (Distance about 0 to 55 km) |
| 17 | 3×300 mm2, 11 KV XLPE Cable |
| 18 | 33KV Bus Isolator |
| 19 | 33KV Line Isolator |
| 20 | 11KV Outgoing VCB Pannel |
| 21 | 33KV Fuse set |
| 22 | Structure For Fuse set |
| 23 | Post Insulator |
| 24 | 33 KV LA |
| 25 | ACSR Dog Conductor |
| 26 | 11 KV 3×185 mm2 XLPE Cable |
| 27 | Repairing of plinth and foundation for 10 MVA transformer as per required specification. Dismantling of T/F all connection. |
| 28 | Dismentling of existing 2 no body and 1 no Neutral earthing safely of existing 5 MVA power transformer earthing for installation of new 10 MVA T/F and re-earthing of new 10 MVA T/F by old earth strip including providing required length of GI Earth strip .The earthing of 10 MVA T/F Included all work completed as per required specification of RESSPO norms. |
| 29 | Dismentling of HT jumpers, 11 KV C/J kit and different earthing of 5 MVA T/F drain out T/F oil after closing wall and opening of radiator for shifting of existing 5 MVA T/F from plinth about 30 mtr. Distance & resetting of All accessories etc. complete work. |
| 30 | Jointing charges of 11 KV “XLPE” C/J kit 3 x 300/185 mm2 Indoor/Outdoor type |
| 31 | Laying of 11 KV “XLPE” power cable 3 x 300/185 mm2 including digging of pits of size 0.5 x 0.5 mtr. covering of cable with sand and 1st class brick around the cable./HDD Method as per site requirment. |
| 32 | Laying of 11KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3 m long Complete work. |
| 33 | GI Pipe Earthing Complete for Cable jointing Kit with materials |
| 34 | Earthing of 10 MVA power transformer body earthing at including cost of G.I. strip,G.I. pipe 1.5” dia 40’ long and other earthing materials required.(Delta type) |
| 35 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
| 36 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. |
| 37 | Testing of 11 KV switchgear panel in all respect. |
| 38 | Neutral earthing of 10 MVA T/F Complete including cost of GI Strip, GI Pipe 1.5\\" dia and 40' long and other earthing materials(Delta type). |
| 39 | Jumpring from 33 KV Bus bar to LA to 10 MVA transformer etc.( Providing alluminium Lug) |
| 40 | Erection, grouting and mounting of Fuse set structure. fitting of “Fuse set” on erected structure with complete earthing. |
| 41 | Erection, grouting and mounting of LA structure. fitting of “LA” on erected structure with complete earthing. |
| 42 | Mounting and fitting of 33 KV Bus Isolator on erected structures. |
| 43 | Mounting and fitting of 33 KV Line Isolator on erected structures. |
| 44 | Mounting and fitting of 33 KV Post insulator on erected structures. |
| 45 | Mounting and fitting of 33 KV LA on erected structures. |
| 46 | Painting of erected structure in switchyard (Applying on coat of good quality red oxide primer & good quality of high class luxol aluminium paint) |
| 47 | Dismantling of existing pale fencing and resetting after completion of transformer work. |
| 48 | Part A (Materials Provided by contractor) 11 KV line bifurcation Bankatiya Dubey to sohana feeder |
| 49 | F-bracket for 11 KV |
| 50 | Holding Clamp for Top Channel & Ms channel/Dropper |
| 51 | Clamp for 11 KV \\"V\\" type Cross arm with bolts and nuts |
| 52 | Number Plate with clamp and Nut & Bolt |
| 53 | Danger Plate with clamp and Nut & Bolt |
| 54 | G I Barbed Wire |
| 55 | Nut Bolt and washer all sizes |
| 56 | PG Clamp |
| 57 | Bracing set 4.3 x 4.3 Mtr Angle Iron 65x65x6 mm with holding clamp |
| 58 | 11 KV E Bracket |
| 59 | 11 KV T-off Channel |
| 60 | T-off Channel holding clamp with Bolts and Nuts |
| 61 | MS Guarding Angle With 4 no. Clamp |
| 62 | GI Wire 6 SWG |
| 63 | Gi Wire 8 SWG |
| 64 | Stay Rod |
| 65 | Stay wire 7/8swg |
| 66 | Stay Clamp |
| 67 | Al. Paint |
| 68 | Red Oxide Paint |
| 69 | Polymeric 11KV Pin Insulator |
| 70 | Disc Fitting for T&C 45 KN |
| 71 | Disc Insulator T&C 45 KN |
| 72 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 73 | 11KV Cable 3x185sq.mm J/kit |
| 74 | Ms Channel/Dropper |
| 75 | GI Pipe 6” Dia |
| 76 | Holding clamp for GI Pipe and Cable |
| 77 | Lug for ACSR Weasel Conductor |
| 78 | PART - B- WORKShifting, Loading Carriage & Unloading of following materials from store centre Deoria to work site |
| 79 | 8.5 Mtr PCC Pole |
| 80 | 11 Mtr STP SP55 Pole |
| 81 | ACSR Weasel Conductor |
| 82 | 11 KV 3x185 XLPE Cable |
| 83 | 11 KV \\"V\\" tyoe cross arm 65x65x6 mm, M S Angle |
| 84 | Top Channel 100x50x6 mm, 2400 mm long |
| 85 | Erection of Single pole structure on 8.5 Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories for Single circuit ( 'V' type cross arm 100 x 50 x 6 mm, M.S. Channel (7.9 Kg./M) clamps with bolt and nut, composite polymer pin, insulator, danger board with clamp, barbed wire earthing, etc. complete). |
| 86 | Erection of Double pole structure on 8.5 Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories ((M.S. angle iron 65 x 65 x 6 mm bracing with clamps, 100x50mmX2240 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete)) . |
| 87 | Erection of Single pole structure on 11mtr ST. (SP-55) Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above , grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories for double circuit ( 'V' type cross arm 100 x 50 x 6 mm, M.S. Channel (7.9 Kg./M) clamps with bolt and nut, composite polymer pin, insulator, danger board with clamp, Alluminium paint, red oxide paint, barbed wire earthing, etc. complete). |
| 88 | Erection of Double pole structure on 11Mtr ST Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel with clamps, danger board with clamp, barbed wire earthing, etc. complete). |
| 89 | Erection of End double pole structure for cable riser on 8.5 mtr PCC Pole including all works of evocation of pit, pole erection, making plinth for poles , grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories ((M.S. angle iron 65 x 65 x 6 mm bracing with clamps, 100x50mmX2240 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete)) . |
| 90 | Grouting of stay rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing. |
| 91 | Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. as per drawing. |
| 92 | Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel. |
| 93 | Digging & laying of 11 KV Cable (Double ckt) in trench with sand & brick and back filling |
| 94 | Laying of 11 KV Cable in Air & Looping work Complete |
| 95 | Making of J/kit |
| 96 | Special pipe earthing |
| 97 | Making of Sectional T-off Pole with all fitting complete work. |
| 98 | Chopping of branches of trees of eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place. (Including existing line) Please Enable Macros to View BoQ information |