| 1 | EARTH WORK IN EXCAVATION IN FOUNDATION OF CHECKDAM |
| 2 | EARTH WORK IN EXCAVATION IN FOUNDATION OF CHECKDAM SITE UP TO 1.50 M DEPTH AND LEAD UP TO 200 M |
| 3 | EARTH WORK IN EXCAVATION BELOW 1.50M DEPTH |
| 4 | REMOVAL OF SLUSH FROM BED OF NALA AND WING WALL WITH 2 LEAD AND 1 LIFT UP TO GROUND HEIGHT FOR EVERY 0.30 M LIFT OR PART THERE OF |
| 5 | EARTH WORK IN EXCAVATION IN WET SOIL IN FOUNDATION OF CREST WING WALL CUT OF WALL APRON AND FLOOR IN UP AND DOWN STREAM WITH 2 LEAD AND 5 LIFT OF UP TO GROUND HEIGHT FOR EVERY 0.30 M LIFT OR PART THERE OF |
| 6 | CONSTRUCTION OF CHECK DAM (PUCCA WORK) |
| 7 | PLAIN CEMENT CONCRETE IN 1:3:6 CEMENT COURSE SAND AND 40mm STONE BALLAST IN FOUNDATION OF WING WALL CREST FLOORS CUT OFF WALL ETC. INCLUDING SUPPLY OF MATERIAL AND LABOUR T&P ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK |
| 8 | RENDUM RUBBLE / KHANDA MASONARY WITH 1:4 CEMENT COURSE SAND MORTAR UP TO BED LEVEL WITH 20X20X20 SIZE KHANDA IN WING WALLS, CREST WALL, PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P REQUIRES FOR PROPER COMPLETION OF WORK |
| 9 | RENDUM RUBBLE / KHANDA MASONARY IN SUPER STRUCTURE WITH 1:4 CEMENT COURSE SAND MORTAR WITH 20X20X20 TO 25X25X25 SIZE KHANDA IN WING WALLS, CREST WALL, PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P REQUIRES FOR PROPER COMPLETION OF WORK |
| 10 | CEMENT CONCRETE WORK IN 1:2:4 WITH CEMENT COURSE SAND AND 20MM STONE BALLAST OVER SURFACE OF FLOOR WING WALL AND CREST WALL INCLUDING COST OF MATERIAL LABOUR AND T&P ETC |
| 11 | 15MM THICK PLASTER IN 1:3 CEMENT AND COURSE SAND MORTAR ON SURFACE OF UP STREAM SIDE CREST WALL WING WALL AND EXTENSION WALL INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P ETC |
| 12 | FLUSH /RAISED POINTING WITH 1:2 CEMENT AND COURSE SAND MORTAR ON SURFACE OFWING WALL CREST WALL SLOPPY WALL ETC INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P ETC |
| 13 | COURSAD RUBBLE STONE MASONARY ON SLOPPY SIDES IN 1:4 CEMENT COURSE SAND AND KHANDA /SPLIT/CUT STONE INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P ETC |
| 14 | DRY STONE PITCHING /FILLING IN LAUNCHING APRON INCLUDING SUPPLY OF MATERIAL LABOUR AND T&P |
| 15 | GENERAL WORK |
| 16 | EARTH WORK IN EXCAVATION FOR MAKING DIVERSION CHENNEL |
| 17 | DEWATERING BEFORE STARTING THE WORK AN DURING THE WORK |
| 18 | MAKING EARTHEN COFFER DAM INCLUDING EXCAVATION OF EARTH AND MAKING BUND TO PREVENT THE STRUCTURE FROM WATER DURING CONSTRUTION PERIOD IN UP STREAM SIDE |
| 19 | MAKING APPROCH ROAD FOR TRANSPORTATION OF MATERIAL UP TO SITE |
| 20 | DISMENTELLING/REMOVING EARTHEN COFFER DAM AFTER COMPLETING CONSTRUTION WORK OF CHECKDAM |
| 21 | FILLING OF DIVERSION CHENNEL (NOTE- SIZE OF DIVERSIONAL CHENNEL IS INCREASED DUE TO SOIL EROSEN DURING CONTINEUE FLOWING OF WATER FROM DIVERSION CHENNEL |
| 22 | PHOTOGRAPHY/ VIDEOGRAPHY BEFORE STARTING THE WORK AT SITE TIME TO TIME DURING CONTRUTION WORK AND AFTER COMPLETION OF WORK |
| 23 | FIXING OF M.S SIGN BOARD AT WORK SITE WITH PAINTING AND WRITING INFORMATION ABOUT CHECKDAM |
| 24 | SURVEYING & DAGBALLING Please Enable Macros to View BoQ information |