| 1 | Item Description |
| 2 | Earth work in excavation in Mar, Rankar and kankar mixed dry soil digging or in embankment including lead up to 30 mtr and lift up to 1.50 mtr. Including dressing making porfile and manual compaction but excluding mechaniclal compaction ID SOR 4.12 ( 0.00 to 1.50 mtr) Above GL ( machine/manual by any means) |
| 3 | Earth work in excavation in Mar, rankar and kankar mixed dry soil in digging or in embankment including lead up to 30 mtr and lift up to 1.50 mtr including dressing making profile and manual compaction but excluding mechanical compaction. ID SOR 4.12 (from 1.5 to Beyond 3 mtr) (machine/manual by any means) |
| 4 | Earth work in excavation in saturated soil ( excluding cost of dewatering) mar, kabar and rankar soil in foundation of wall, pier, abutment etc. with disposal with in 30 mtr lead and 1.50 mtr lift. ID SOR 4.16 (0.00 mtr to 1.5 mtr) (machine/manual by any means) |
| 5 | Removal of slush (excluding cost of dewatering) from the bed of nala / Ponds SOR 4.17 |
| 6 | Earth work in excavation in mar, kabar and rankar soil in foundation of wall, pier, abutment etc. with disposal with in 30 mtr lead and 1.50 mtr lift. ID SOR 4.14b (0.00 mtr to 1.5 mtr) |
| 7 | Sand filling for foundation of inlet, oulet and ramp. |
| 8 | C.C. in 1:3:6 cement sand and 22.4 to 53 mm Granite stone grit including the cost of materials, labour and etc. required for proper complition of works. (inlet, oulet, ghat and ramp) |
| 9 | R.C.R Stone massonery work in 1:4 cement, sand mortar including the cost of material, labouer etc. required for proper completion of work. (inlet, oulet, ghat and ramp) |
| 10 | Supply and fixing of 1000 mm dia NP3 hume pipe with collar (inlet, oulet). |
| 11 | C.C. in 1:2:4 Cement, sand and 10 to 20 mm grit including the cost of materials, labours and etc. to required for proper completion of work. (inlet, oulet, ghat and ramp) |
| 12 | Plaster work in 1:3 c/s mortar 20 mm thick on stone masonery work. |
| 13 | Dry stone boulder filling in D/S & U/S in one chamber of each (inlet, oulet). |
| 14 | Dewatering during the work before excavation of slus/saturarated soil by 8 HP Diesel pumping set. |
| 15 | Supply and fixing of citizens information board at the site (C.I.B) Please Enable Macros to View BoQ information |