| 1 | Work-01 (Dhanewa Dhanei Increasing Capacity 1x5 MVA to 2x5 MVA)PART - A- MATERIAL PROVIDED BY CONTRACTOR |
| 2 | 11 KV cable jointing kit 3×300 mm outdoor |
| 3 | 11 KV cable jointing kit 3×300mm indoor |
| 4 | 11 KV cable jointing kit 3×185 mm outdoor |
| 5 | 11 KV cable jointing kit 3×185 mm Indoor |
| 6 | Top Channel 100x50x6 mm, 2400 mm long |
| 7 | Holding Clamp |
| 8 | Complete Stay Set |
| 9 | Disc Fitting for T&C 45 KN |
| 10 | Disc Insulator T&C 45 KN |
| 11 | Polymeric 11KV Pin Insulator |
| 12 | PG Clamp |
| 13 | Number Plate with clamp and Nut & Bolt |
| 14 | Danger Plate with clamp and Nut & Bolt |
| 15 | MS Dropper Angle |
| 16 | M S Earthing Rod 20 x 2500 mm |
| 17 | Barbered Wire |
| 18 | 11 KV E Bracket |
| 19 | Armoured Copper Control Cable 2×2.5 mm2 |
| 20 | Armoured Copper Control Cable 4×2.5 mm2 |
| 21 | 24 volt battery and battery charger with cabinet |
| 22 | GI pipe 6\\" dia over the 3x300/185 sqmm XLPE cable |
| 23 | Holding Clamp for 11 KV Cable |
| 24 | Holding Clamp For GI pipe / Cable(3x185sqmm) & Dropper Channel |
| 25 | M.S. Nut & Bolt Various size with washer |
| 26 | Structure For cable support |
| 27 | \\"L\\" Type Structure for Neutral |
| 28 | P.G Clamp For Dog |
| 29 | Rubber Mat |
| 30 | PART - B WORKShifting & loading of following materials on private truck at store centre Maharajganj & carriage up to 33/11 KV Sub-Station Dhanewa Dhanei, Distt- Maharajganj & Un-loading of the same with proper stacking (Distance about 0 to12 km) |
| 31 | S T Pole 11 Mtr Long |
| 32 | 33KV Single T/F Control Panel |
| 33 | 33 KV VCB 800A, 750 MVA with Steel Structure |
| 34 | 33 KV C.T 200/100/1A |
| 35 | Structure of 33 KV CT |
| 36 | 33 KV LA |
| 37 | Structure of 33 KV LA |
| 38 | 33 KV Fuse Set |
| 39 | Structure of 33KV Fuse set |
| 40 | 33 KV Bus Isolator |
| 41 | Structure of 33 KV Bus Isolator |
| 42 | 33 KV Post Insulator |
| 43 | Structure of 33 KV Post Insulator |
| 44 | 90 Ib,Rail pieces (44.64 Kg/M) |
| 45 | ACSR Dog Conductor |
| 46 | 11 KV XLPE Cable 3×300 mm2, |
| 47 | 11 KV XLPE Cable 3×185 mm2 |
| 48 | 11 KV VCB 600/300/5A , 350 MVA I/C |
| 49 | 11 KV VCB (Out going) 200/100/5A 350 MVA |
| 50 | 11 KV Bus Coupler |
| 51 | Fresh T/F Oil |
| 52 | Earthing of S/s Outdoor equipments (earthmat) |
| 53 | Construction of power transformer plinth for 5 MVA transformer of size 3.5 x 3.5 x 1.5 mtr. including cost of all material as per drawing. |
| 54 | Earthing of 5 MVA power transformer body earthing at including cost of G.I. strip,G.I. pipe 1.5” dia 40’ long and other earthing materials required . |
| 55 | Earthing of equipments like control Panel(1),11KV VCB I/C (1),LA(1) including cost of G.I. strip,G.I. pipe 1.5” dia 40’ long and other earthing materials required.(Delta type earthing) |
| 56 | Filling of Transformer oil In Installed 5 MVA Power Transformer |
| 57 | Providing & Jointing charges of 11 KV “XLPE” C/J kit 3 x 300/185 mm2 indoor/Outdoor type |
| 58 | Neutral earthing of 5 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 30’ long and other earthing materials (delta type earthing) |
| 59 | G.I. Stand For neutral earthing of 5 MVA transformer with help of G.I. strip 50 x 8 mm and copper flexible bond etc. with G.I.angle , channel support and grouting. |
| 60 | providing , erection and Grouting of required channel/angle for cable stand and welding of M.S. flat at equal distance for fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of T/F Bushings. |
| 61 | Installation of 33 KV control panel for “VCB” with complete earthing with installation of battery and battery charger in control room and making connection. |
| 62 | Laying of 11 KV “XLPE” power cable 3 x 300 mm2 / 185 mm2 mm2 including digging of pits of xize 0.5 x 0.5 mtr. covering of cable with sand and 1st class brick around the cable./ HDD Method as Per site requirement |
| 63 | Laying of 11KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3 m long Complete work. |
| 64 | GI Pipe Earthing Complete for Cable jointing Kit with materials |
| 65 | Erection of Double pole structure on 11 Mtr S.T Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories (M.S. angle iron bracing with clamps, 100x50mmX2240 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete). |
| 66 | Grouting of stay rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing. |
| 67 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
| 68 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. |
| 69 | Testing of 11 KV switchgear panel in all respect. |
| 70 | Providing of 03 Phase Generator on Rent Basis for Testing of Power Transformer and Related other Equipment.etc |
| 71 | Laying of various typt of control cables |
| 72 | Making of control cable trench in switchyard including cost of sand and 1st class bricks size 0.3m wide X 0.5m depth.with hanger and RCC covering plate |
| 73 | Erection, grouting and mounting of “VCB” Structure, fitting of “VCB” on erected structure with complete earthing. |
| 74 | Erection, grouting and mounting of CT structure. fitting of “CT” on erected structure with complete earthing. |
| 75 | Erection grouting and earthing of following structure. |
| 76 | 33 KV Bus Isolator structure |
| 77 | 33 KV fuse set structure |
| 78 | 33 KV Post insulator structure |
| 79 | 33 KV L.A. structure |
| 80 | Mounting and fitting of equipment on erected structures. |
| 81 | 33 KV Bus – Isolator 400 Amp. |
| 82 | 33 KV Post Insulator |
| 83 | 33 KV LA |
| 84 | 33 KV fuse set ( Copper strip as required size for 33 KV fuse set) |
| 85 | Earhing of outdoor type switchyard earthing for newly erected structure as per proper specification with GI Earthing strip. |
| 86 | Jumpring form 33 KV Bus bar to post insulator, bus isolator, VCB, CT and LA to 5 MVA transformer etc.( Providing alluminium Lug and PG Clamp) |
| 87 | Construction of approach road inside the switchyard 1.5 Mtr. wide with 1st class bricks on edge soling and tipping complete work including cost of all materials. |
| 88 | Dismantling of existing pale fencing and resetting after completion of transformer work. |
| 89 | Painting of newly erected structure in switchyard (Applying on coat of good quality red oxide & aluminium paint) |
| 90 | Part A (Materials Provided by contractor) 02 No. 11 KV line Dhanewa Dhanei |
| 91 | F-bracket for 11 KV |
| 92 | Holding Clamp for Top Channel & Ms channel/Dropper |
| 93 | Clamp for 11 KV \\"V\\" type Cross arm with bolts and nuts |
| 94 | Number Plate with clamp and Nut & Bolt |
| 95 | Danger Plate with clamp and Nut & Bolt |
| 96 | G I Barbed Wire |
| 97 | Nut Bolt and washer all sizes |
| 98 | PG Clamp |
| 99 | Bracing Angle Iron with holding clamp |
| 100 | 11 KV E Bracket |
| 101 | 11 KV T-off Channel |
| 102 | T-off Channel holding clamp with Bolts and Nuts |
| 103 | MS Guarding Angle |
| 104 | GI Wire 6 SWG |
| 105 | Gi Wire 8 SWG |
| 106 | Stay Rod |
| 107 | Stay wire 7/8 swg |
| 108 | Stay Clamp |
| 109 | Al. Paint |
| 110 | Red Oxide Paint |
| 111 | Polymeric 11KV Pin Insulator |
| 112 | Disc Fitting for T&C 45 KN |
| 113 | Disc Insulator T&C 45 KN |
| 114 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 115 | 11KV Cable 3x185sq.mm J/kit |
| 116 | PART - B- WORKShifting, Loading Carriage & Unloading of following materials from store centre Maharajganj to work site |
| 117 | P.C.C. Pole 9 M long |
| 118 | S.T. Pole – 11 Mtr. Long |
| 119 | 11 KV ‘XLPE’ Cable 3x185mm² |
| 120 | ACSR Weasel Conductor |
| 121 | 11 KV \\"V\\" tyoe cross arm |
| 122 | Top Channel 100x50x6 mm, 2400 mm long |
| 123 | Erection of Single pole structure on 9 Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories for Single circuit ( 'V' type cross arm 100 x 50 x 6 mm, M.S. Channel (7.9 Kg./M) clamps with bolt and nut, composite polymer pin, insulator, danger board with clamp, barbed wire earthing, etc. complete). |
| 124 | Erection of Double pole structure on 9 Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories ((M.S. angle iron bracing with clamps, 100x50mmX2240 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete)) . |
| 125 | Erection of Single pole structure on 11mtr ST. (SP-55) Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above , grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories for double circuit ( 'V' type cross arm 100 x 50 x 6 mm, M.S. Channel clamps with bolt and nut, composite polymer pin, insulator, danger board with clamp, Alluminium paint, red oxide paint, barbed wire earthing, etc. complete). |
| 126 | Erection of Double pole structure on 11Mtr ST Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron bracing with clamps, top channel with clamps, danger board with clamp, barbed wire earthing, etc. complete). |
| 127 | Grouting of stay rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing. |
| 128 | Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, cutting, fabrication and fixing of guarding channel with clamps nut & bolts etc. as per drawing. |
| 129 | Laying, spreading, lifting and final sagging of 3 phases of ACSR Weasel conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel. |
| 130 | Digging & laying of 11 KV Cable (Double ckt) with sand & brick and back filling |
| 131 | Laying of 11 KV Cable in Air & Looping work Complete |
| 132 | Making of J/kit |
| 133 | Special pipe earthing |
| 134 | Making of Sectional T-off Pole with all fitting complete work. |
| 135 | Chopping of branches of trees of eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place. (Including existing line) |
| 136 | Work-02 (Nichlaul Tehsil Increasing Capacity 1x5 MVA to 2x5 MVA)PART - A- MATERIAL PROVIDED BY CONTRACTOR |
| 137 | 11 KV cable jointing kit 3×300 mm outdoor |
| 138 | 11 KV cable jointing kit 3×300mm indoor |
| 139 | 11 KV cable jointing kit 3×185 mm outdoor |
| 140 | 11 KV cable jointing kit 3×185 mm Indoor |
| 141 | Top Channel 100x50x6 mm, 2400 mm long |
| 142 | Holding Clamp |
| 143 | Complete Stay Set |
| 144 | Disc Fitting for T&C 45 KN |
| 145 | Disc Insulator T&C 45 KN |
| 146 | Polymeric 11KV Pin Insulator |
| 147 | PG Clamp |
| 148 | Number Plate with clamp and Nut & Bolt |
| 149 | Danger Plate with clamp and Nut & Bolt |
| 150 | MS Dropper Angle |
| 151 | M S Earthing Rod 20 x 2500 mm |
| 152 | Barbered Wire |
| 153 | 11 KV E Bracket |
| 154 | Armoured Copper Control Cable 2×2.5 mm2 |
| 155 | Armoured Copper Control Cable 4×2.5 mm2 |
| 156 | 24 volt battery and battery charger with cabinet |
| 157 | GI pipe 6\\" dia over the 3x300/185 sqmm XLPE cable |
| 158 | Holding Clamp for 11 KV Cable |
| 159 | Holding Clamp For GI pipe / Cable(3x185sqmm) & Dropper Channel |
| 160 | M.S. Nut & Bolt Various size with washer |
| 161 | Structure For cable support |
| 162 | \\"L\\" Type Structure for Neutral |
| 163 | P.G Clamp For Dog |
| 164 | Rubber Mat |
| 165 | PART - B- WORKShifting & loading of following materials on private truck at store centre Maharajganj & carriage up to 33/11 KV Sub-Station Nichlaul Tehsil, Distt- Maharajganj & Un-loading of the same with proper stacking (Distance about 0 to 65 km) |
| 166 | PCC Pole 8.5 Mtr Long |
| 167 | 33KV Single T/F Control Panel |
| 168 | 33 KV VCB 800A, 750 MVA with Steel Structure |
| 169 | 33 KV C.T 200/100/1A |
| 170 | Structure of 33 KV CT |
| 171 | 33 KV LA |
| 172 | Structure of 33 KV LA |
| 173 | 33 KV Fuse Set |
| 174 | Structure of 33KV Fuse set |
| 175 | 33 KV Line Isolator |
| 176 | 33 KV Bus Isolator |
| 177 | Structure of 33 KV Bus Isolator |
| 178 | 33 KV Post Insulator |
| 179 | Structure of 33 KV Post Insulator |
| 180 | 90 Ib,Rail pieces (44.64 Kg/M) |
| 181 | ACSR Dog Conductor |
| 182 | 11 KV XLPE Cable 3×300 mm2, |
| 183 | 11 KV XLPE Cable 3×185 mm2 |
| 184 | 11 KV VCB 600/300/5A , 350 MVA I/C |
| 185 | 11 KV VCB (Out going) 200/100/5A 350 MVA |
| 186 | 11 KV Bus Coupler |
| 187 | Fresh T/F Oil |
| 188 | Earthing of S/s Outdoor equipments (earthmat) |
| 189 | Construction of power transformer plinth for 5 MVA transformer of size 3.5 x 3.5 x 1.5 mtr. including cost of all material as per drawing. |
| 190 | Earthing of 5 MVA power transformer body earthing at including cost of G.I. strip,G.I. pipe 1.5” dia 40’ long and other earthing materials required . |
| 191 | Earthing of equipments like control Panel(1),11KV VCB I/C (1),LA(1) including cost of G.I. strip,G.I. pipe 1.5” dia 40’ long and other earthing materials required.(Delta type earthing) |
| 192 | Filling of Transformer oil In Installed 5 MVA Power Transformer |
| 193 | Providing & Jointing charges of 11 KV “XLPE” C/J kit 3 x 300/185 mm2 indoor/Outdoor type |
| 194 | Neutral earthing of 5 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 30’ long and other earthing materials (delta type earthing) |
| 195 | G.I. Stand For neutral earthing of 5 MVA transformer with help of G.I. strip 50 x 8 mm and copper flexible bond etc. with G.I.angle , channel support and grouting. |
| 196 | providing , erection and Grouting of required channel/angle for cable stand and welding of M.S. flat at equal distance for fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of T/F Bushings. |
| 197 | Installation of 33 KV control panel for “VCB” with complete earthing with installation of battery and battery charger in control room and making connection. |
| 198 | Laying of 11 KV “XLPE” power cable 3 x 300 mm2 / 185 mm2 mm2 including digging of pits of xize 0.5 x 0.5 mtr. covering of cable with sand and 1st class brick around the cable. |
| 199 | Laying of 11KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3 m long Complete work. |
| 200 | GI Pipe Earthing Complete for Cable jointing Kit with materials |
| 201 | Erection of Double pole structure on 8.5 Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories (M.S. angle iron bracing with clamps, 100x50mmX2240 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete). |
| 202 | Grouting of stay rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing. |
| 203 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
| 204 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. |
| 205 | Testing of 11 KV switchgear panel in all respect. |
| 206 | Providing of 03 Phase Generator on Rent Basis for Testing of Power Transformer and Related other Equipment.etc |
| 207 | Laying of various typt of control cables |
| 208 | Making of control cable trench in switchyard including cost of sand and 1st class bricks size 0.3m wide X 0.5m depth.with hanger and RCC covering plate |
| 209 | Erection, grouting and mounting of “VCB” Structure, fitting of “VCB” on erected structure with complete earthing. |
| 210 | Erection, grouting and mounting of CT structure. fitting of “CT” on erected structure with complete earthing. |
| 211 | Erection grouting and earthing of following structure. |
| 212 | 33 KV Bus Isolator structure |
| 213 | 33 KV fuse set structure |
| 214 | 33 KV Post insulator structure |
| 215 | 33 KV L.A. structure |
| 216 | Mounting and fitting of equipment on erected structures. |
| 217 | 33 KV Line Isolator |
| 218 | 33 KV Bus – Isolator |
| 219 | 33 KV Post Insulator |
| 220 | 33 KV LA |
| 221 | 33 KV fuse set ( Copper strip as required size for 33 KV fuse set) |
| 222 | Earhing of outdoor type switchyard earthing for newly erected structure as per proper specification with GI Earthing strip. |
| 223 | Jumpring form 33 KV Bus bar to post insulator, bus isolator, VCB, CT and LA to 5 MVA transformer etc.( Providing alluminium Lug and PG Clamp) |
| 224 | Construction of approach road inside the switchyard 1.5 Mtr. wide with 1st class bricks on edge soling and tipping complete work including cost of all materials. |
| 225 | Dismantling of existing pale fencing and resetting after completion of transformer work. |
| 226 | Painting of newly erected structure in switchyard (Applying on coat of good quality red oxide & aluminium paint) |
| 227 | Part A (Materials Provided by contractor) 02 No. 11 KV line Nichlaul Tehsil |
| 228 | Holding Clamp for Top Channel & Ms channel/Dropper |
| 229 | Number Plate with clamp and Nut & Bolt |
| 230 | Danger Plate with clamp and Nut & Bolt |
| 231 | G I Barbed Wire |
| 232 | Nut Bolt and washer all sizes |
| 233 | PG Clamp |
| 234 | Stay Rod |
| 235 | Stay wire 7/8 swg |
| 236 | Stay Clamp |
| 237 | Disc Fitting for T&C 45 KN |
| 238 | Disc Insulator T&C 45 KN |
| 239 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 240 | 11KV Cable 3x185sq.mm J/kit |
| 241 | Ms Channel/Dropper |
| 242 | GI Pipe 6” Dia |
| 243 | Holding clamp for GI Pipe and Cable |
| 244 | PART - B- WORKShifting, Loading Carriage & Unloading of following materials from store centre Maharajganj to work site |
| 245 | P.C.C. Pole 8.5M long |
| 246 | 11 KV ‘XLPE’ Cable 3x185mm² |
| 247 | ACSR Weasel Conductor |
| 248 | Top Channel 100x50x6 mm, 2400 mm long |
| 249 | Erection of End double pole structure for cable riser on 8.5 mtr PCC Pole including all works of evocation of pit, pole erection, making plinth for poles , grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories (M.S. angle iron bracing with clamps, 100x50mmX2240 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete) . |
| 250 | Grouting of stay rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing. |
| 251 | Digging & laying of 11 KV Cable (Double ckt) with sand & brick and back filling |
| 252 | Laying of 11 KV Cable in Air & Looping work Complete |
| 253 | Making of J/kit |
| 254 | Special pipe earthing |
| 255 | Work-03 (Ghughali (10+5 MVA to 2x10 MVA)PART - A- MATERIAL PROVIDED BY CONTRACTOR |
| 256 | Structure For cable support |
| 257 | \\"L\\" Type Structure for Neutral |
| 258 | Armoured Copper Control Cable 2×2.5 mm2 |
| 259 | Armoured Copper Control Cable 4×2.5 mm2 |
| 260 | 11 KV cable jointing kit 3×300 mm outdoor heat shrinkable Type |
| 261 | 11 KV cable jointing kit 3×300mm indoor heat shrinkable Type |
| 262 | 11 KV cable jointing kit 3×185 mm outdoor heat shrinkable Type |
| 263 | 11 KV cable jointing kit 3×185 mm Indoor heat shrinkable Type |
| 264 | GI pipe 6\\" dia over the 3x300/185 sqmm XLPE cable |
| 265 | Holding Clamp for 3×300 XLPE 11 KV Cable |
| 266 | MS dropper Channel |
| 267 | GI pipe/cable(3x185sqmm) & dropper Channel Holding Clamp |
| 268 | M.S. Nut Bolt and washers |
| 269 | P.G Clamp For Dog to Dog |
| 270 | Rubber Mat |
| 271 | PART - B WORKShifting & loading of following materials on private truck at store centre Maharajganj & carriage up to 33/11 KV Sub-Station Ghughuli, Distt- Maharajganj & Un-loading of the same with proper stacking (Distance about 0 to 55 km) |
| 272 | 3×300 mm2, 11 KV XLPE Cable |
| 273 | 33KV Control Panel for Single Feeder |
| 274 | 33 KV VCB 800A, 750 MVA with Steel Structure |
| 275 | 33 KV C.T 200/100/1A |
| 276 | Structure of 33 KV CT |
| 277 | 33 KV LA |
| 278 | Structure of 33 KV LA |
| 279 | 11 KV 3×185 mm2 XLPE Cable |
| 280 | ACSR Dog Conductor |
| 281 | Repairing of plinth and foundation for 10 MVA transformer as per required specification. Dismantling of T/F all connection. |
| 282 | Dismentling of existing 2 no body and 1 no Neutral earthing safely of existing 5 MVA power transformer earthing for installation of new 10 MVA T/F and re-earthing of new 10 MVA T/F by old earth strip including providing required length of GI Earth strip .The earthing of 10 MVA T/F Included all work completed as per required specification of RESSPO norms. |
| 283 | Dismentling of HT jumpers, 11 KV C/J kit and different earthing of 5 MVA T/F drain out T/F oil after closing wall and opening of radiator for shifting of existing 5 MVA T/F from plinth about 30 mtr. Distance & resetting of All accessories etc. complete work. |
| 284 | Jointing charges of 11 KV “XLPE” C/J kit 3 x 300/185 mm2 Indoor/Outdoor type |
| 285 | Laying of 11 KV “XLPE” power cable 3 x 300/185 mm2 including digging of pits of size 0.5 x 0.5 mtr. covering of cable with sand and 1st class brick around the cable./HDD Method as per site requirment. |
| 286 | Laying of 11KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3 m long Complete work. |
| 287 | GI Pipe Earthing Complete for Cable jointing Kit with materials |
| 288 | Earthing of equipments like control Panel(1),11KV VCB I/C (1),LA(1) including cost of G.I. strip,G.I. pipe 1.5” dia 40’ long and other earthing materials required.(Delta type earthing) |
| 289 | Earthing of 10 MVA power transformer body earthing at including cost of G.I. strip,G.I. pipe 1.5” dia 40’ long and other earthing materials required. |
| 290 | Neutral earthing of 10 MVA T/F Complete including cost of GI Strip, GI Pipe 1.5\\" dia and 40' long and other earthing materials(Delta type). |
| 291 | Laying of various typt of control cables |
| 292 | Jumpring from 33 KV Bus bar to LA to 10 MVA transformer etc.( Providing alluminium Lug) |
| 293 | Installation of 33 KV control panel for “VCB” with complete earthing with installation of battery and battery charger in control room and making connection. |
| 294 | Erection, grouting and mounting of “VCB” Structure, fitting of “VCB” on erected structure with complete earthing. |
| 295 | Erection, grouting and mounting of CT structure. fitting of “CT” on erected structure with complete earthing. |
| 296 | Erection, grouting and mounting of LA structure. fitting of “LA” on erected structure with complete earthing. |
| 297 | Mounting and fitting of 33 KV LA on erected structures. |
| 298 | Painting of erected structure in switchyard (Applying on coat of good quality red oxide primer & good quality of high class luxol aluminium paint) |
| 299 | Dismantling of existing pale fencing and resetting after completion of transformer work. |
| 300 | Part A (Materials Provided by contractor) 02 No. 11 KV line Ghughali |
| 301 | F-bracket for 11 KV |
| 302 | Holding Clamp for Top Channel & Ms channel/Dropper |
| 303 | Clamp for 11 KV \\"V\\" type Cross arm with bolts and nuts |
| 304 | Number Plate with clamp and Nut & Bolt |
| 305 | Danger Plate with clamp and Nut & Bolt |
| 306 | G I Barbed Wire |
| 307 | Nut Bolt and washer all sizes |
| 308 | PG Clamp |
| 309 | Bracing Angle Iron with holding clamp |
| 310 | 11 KV E Bracket |
| 311 | 11 KV T-off Channel |
| 312 | T-off Channel holding clamp with Bolts and Nuts |
| 313 | MS Guarding Angle |
| 314 | GI Wire 6 SWG |
| 315 | Gi Wire 8 SWG |
| 316 | Stay Rod |
| 317 | Stay wire 7/8 swg |
| 318 | Stay Clamp |
| 319 | Al. Paint |
| 320 | Red Oxide Paint |
| 321 | Polymeric 11KV Pin Insulator |
| 322 | Disc Fitting for T&C 45 KN |
| 323 | Disc Insulator T&C 45 KN |
| 324 | Earthing of Pole by M S Earthing Rod 20 x 2500 mm and 6 SWG earthing wire etc |
| 325 | 11KV Cable 3x185sq.mm J/kit |
| 326 | PART - B- WORKShifting, Loading Carriage & Unloading of following materials from store centre Maharajganj to work site |
| 327 | 11 kv Outgoing Pannel |
| 328 | P.C.C. Pole 8.5M long |
| 329 | S.T. Pole – 11 Mtr. Long |
| 330 | 11 KV ‘XLPE’ Cable 3x185mm² |
| 331 | ACSR Weasel Conductor |
| 332 | 11 KV \\"V\\" tyoe cross arm |
| 333 | Top Channel 100x50x6 mm, 2400 mm long |
| 334 | Erection of Single pole structure on 8.5 Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories for Single circuit ( 'V' type cross arm 100 x 50 x 6 mm, M.S. Channel (7.9 Kg./M) clamps with bolt and nut, composite polymer pin, insulator, danger board with clamp, barbed wire earthing, etc. complete). |
| 335 | Erection of Double pole structure on 8.5 Mtr PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories ((M.S. angle iron bracing with clamps, 100x50mmX2240 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete)) . |
| 336 | Erection of Single pole structure on 11mtr ST. (SP-55) Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above , grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories for double circuit ( 'V' type cross arm 100 x 50 x 6 mm, M.S. Channel clamps with bolt and nut, composite polymer pin, insulator, danger board with clamp, Alluminium paint, red oxide paint, barbed wire earthing, etc. complete). |
| 337 | Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. |
| 338 | Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. |
| 339 | Testing of 11 KV switchgear panel in all respect. |
| 340 | Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, cutting, fabrication and fixing of guarding channel with clamps nut & bolts etc. as per drawing. |
| 341 | Laying, spreading, lifting and final sagging of 3 phases of ACSR Weasel conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel. |
| 342 | Digging & laying of 11 KV Cable (Double ckt) in trench with sand & brick and back filling |
| 343 | Laying of 11 KV Cable in Air & Looping work Complete |
| 344 | Making of J/kit |
| 345 | Special pipe earthing |
| 346 | Making of Sectional T-off Pole with all fitting complete work. |
| 347 | Chopping of branches of trees of eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place. (Including existing line) |
| 348 | Work-04 (33 KV Line Baikunthpur from 132/33 KV S/S Maharajganj to 33/11 KV S/S Baikunthpur )PART - A- MATERIAL PROVIDED BY CONTRACTOR |
| 349 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor |
| 350 | Providing 6” dia.MS G.I. pipe 3m long |
| 351 | Holding Clamp for GI Pipe & cable |
| 352 | Lug for ACSR Dog Conductor |
| 353 | PART – B- WORKShifting,loading and carriage of following materials on private truck at store centre Maharajganj & Un-loading of the same with proper stacking at work site. |
| 354 | 33 KV ‘XLPE’ Cable 3x300mm² |
| 355 | Digging & laying of 33 KV Cable with sand & brick and back filling as per site requirement. |
| 356 | Laying of 33KV ‘XLPE’ cable in air and Loop |
| 357 | Cable jointing charges of 33 KV XLPE Cable Outdoor |
| 358 | GI Pipe Earthing Complete for Cable jointing Kit with materials Please Enable Macros to View BoQ information |