| 1 | Part-A (Material Provided by Contractor) |
| 2 | 33 KV Feeder Pillar Box |
| 3 | 33 KV RMU 3-WAY |
| 4 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor |
| 5 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Straight Through |
| 6 | M S Dropper Angle |
| 7 | M S Holding Clamp for STP Support |
| 8 | Nut Bolt and washer all sizes |
| 9 | Number Plate with clamp and Nut & Bolt |
| 10 | Danger Board with clamp and Nut & Bolt |
| 11 | Barbed Wire |
| 12 | Red Oxide Paint |
| 13 | Aluminium Paint |
| 14 | Earthing Complete (Per set =01 No Earthing Rod + 2Kg GI Wire) |
| 15 | GI Pipe 6\\" Dia |
| 16 | HDPE Pipe 160 mm dia |
| 17 | 33 KV X-arm clamp for temporary line as per site requirement |
| 18 | Armoured copper control cable 2 x 2.5 mm2 |
| 19 | Armoured copper control cable 4 x 2.5 mm2 |
| 20 | PART – B- WORKShifting, Loading Carriage & Unloading of following materials from store centre Gorakhpur to work site for 33/11 KV S/S Buxipur |
| 21 | ST Pole 11 m |
| 22 | ST Pole 9 m |
| 23 | 33 KV XLPE Cable 3x300 sqmm |
| 24 | 33 KV Line Isolator |
| 25 | 33 KV Line Isolator structure |
| 26 | 33 KV CT 400/200/1A |
| 27 | 33 KV CT Structure |
| 28 | 33 KV LA |
| 29 | 33 KV LA Structure |
| 30 | 33 KV VCB with structure |
| 31 | 33 KV Control pannel for single feeder |
| 32 | 33 KV Top Channel |
| 33 | 33 KV X arm |
| 34 | ACSR Dog conductor |
| 35 | Laying of 33 KV 3x300 mm² ‘XLPE’ cable in cable trench. As per site requirement |
| 36 | Laying of 33 KV 3x300 mm² ‘XLPE’ cable by HDD mathod OR laying along with cast of digging, bricks & sand. As per site requirement |
| 37 | Laying of 33 KV 3x300 mm² ‘XLPE’ cable by HDD mathed With HDPE Pipe For Road/sewer Crossing. As per site requirement |
| 38 | Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor/Indoor |
| 39 | Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Straight Through |
| 40 | Looping and rising of 33 KV ‘XLPE’ cable in air in 6” dia. GI pipe 3m long with cable clamp, GI Pipe clamp Complete work. |
| 41 | Road Restoration Charges (Pakka Road) during cable laying and road cutting. |
| 42 | Making plinth for installation of feeder pillar box |
| 43 | Installation of 33 KV Feeder Pillar Box with complete wiring and Earthing complete work |
| 44 | Special pipe earthing with material for cable and kit protection |
| 45 | Making plinth for installation of RMU |
| 46 | Installation of 33 KV RMU with complete wiring and earthing complete work |
| 47 | Erection of Double pole structure on 9 mtr ST Pole for Cable rising with fitting of all accessories, Painting,Earthing Complete Work |
| 48 | Concreting of pole and making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm stone ballast), back filling of earth, proper ramming. (as per UPPCL Norms) |
| 49 | Erection and grouting of Line Isolator Structure and install Line Isolator and earthing,Painting complete work. |
| 50 | Erection and grouting of CT Structure and installation of 33 KV CT, wiring and earthing, Painting complete work. |
| 51 | Erection and grouting of LA Structure and installation of 33 KV LA and earthing, Painting complete work. |
| 52 | Erection and grouting of VCB Structure and installation of 33 KV VCB, wiring and earthing complete work. |
| 53 | Installation of 33 KV CR Pannel, wiring and earthing complete work. |
| 54 | Erection of Single pole on 11 mtr long ST Pole with fitting of accessories for Temporary line |
| 55 | Temporary hanging of 3x300Sq.mm, XLPE Cable 33 KV on erected ST Pole |
| 56 | Dismantling of Temporary cable and ready to use as permanent |
| 57 | Laying from switchyard to control room for 33 KV panel, CT, VCB by digging trench and making connection complete. (As per site requirement laying of cable though cable trench if available with covering brick and sand. |
| 58 | 2 x 2.5 mm2 |
| 59 | 4 x 2.5 mm2 |
| 60 | Dismantling of Temporary ST Pole and X arm and receive back to store centre Gorakhpur Please Enable Macros to View BoQ information |