| 1 | Dismentaling manualy/by mechanical means i/c stacking of serviceable material and disposal of unserviceble material within 50 mtr. lead of Bituminous Road. (DSR-18, I.No.-15.43.2/P-261) |
| 2 | Demolishing cement concrete manually/by mechanical means i/c disposal of material within 50 m lead as per direction of E/I nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). (DSR-18, I.No.-15.2.1/P-258) |
| 3 | Excavating trenches of required width for pipes, cables etc. i/c excavation for sockets depth upto 1.50 m i/c getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm. in depth i/c consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil as directed, within lead of 50 m. The Contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge.Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm dia. (DSR-18, I.No.-2.13.1.3/P-75) |
| 4 | Hire Charges of Mobile Crane 35 Ton Capacity. (SOR-2020/I.No.-0037) |
| 5 | P/L S&S Centrifugaly Cast (Spun)/Ductile Iron Pipes conferming to IS:8329. (DSR-18, I.No.-18.72/P-304)….300 mm dia Ductile Iron Class K-9 pipes |
| 6 | P/F M. S. Specials such as Tee, bend, collars, Tapers, Gap pieces, i/c Flange Ends as required, painting, cutting, welding as per site requirment of M.S. Pipes thickness etc. complete in all respect as per direction by the E/I. (NSI-1.7.00) |
| 7 | Hire charges for Diesel Engine (Double Cylender) on required i/c fuel, labour, T&P etc. (NSI-10.1.08) |
| 8 | Hire charges for D.G Set (i/c cost service of operating staff supply of lubricating oil & diesel) 50 KVA D. G. Set (NSI-10.1.03) |
| 9 | Hiring of Gas cutting set with Oxegen and LPG running time @ 6 Hrs. (NSI-10.1.06) |
| 10 | Hiring of Welding Set Running time @ 6 Hrs. (NSI-10.1.07) |
| 11 | P/L in position Cement Concrete of specified grade excluding the cost of centering and shuttering, all work up to plinth level in 1:4:8 (1 Cement : 4 C. Sand : 8 graded stone agg. 40 mm n.s.). (DSR-18, I.No.-4.1.8/P-88) |
| 12 | P/L Cement Concrete Pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and fineshed with screed board vibrator, vacuum dewatering process and finaly finished by floating, brooming with wire brush etc. complete as per specifications and direction of Engineer-in-charge. (the panel shuttering work shall be paid for separately) (Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable seperately). (DSR-18, I.No.-16.75/P-284) |
| 13 | Disposal of building rubbish/malba/similar unserviceable, dismantled or waste materials by mechanical means, i/c loading, transporting, unloading to approved municipal dumping ground or as approved by E/I, beyond 50 m initial lead, for all leads i/c all lifts involved. (DSR-18, I.No.-15.60/P-263) Please Enable Macros to View BoQ information |