|
| 1 | 33 KV Strengthening Work Under EDD Nautanwa (Business Plan 2026-27) |
| 2 | Safe Loading, Carriage & Unloading of P.C.C. POLE 11.00 Mtr. From Electricity Store Center Maharajganj to Work Site. |
| 3 | Safe Loading, Carriage & Unloading of A.C.S.R. DOG CONDUCTOR From Electricity Store Center Maharajganj to Work Site. |
| 4 | Safe Loading, Carriage & Unloading of 33 KV V TYPE CROSS ARM From Electricity Store Center Maharajganj to Work Site. |
| 5 | Safe Loading, Carriage & Unloading of 33 KV COMPOSIT POLYMER PIN INSULATOR From Electricity Store Center Maharajganj to Work Site. |
| 6 | Safe Loading, Carriage & Unloading of 33 KV COMPOSIT POLYMER DISC INSULATOR From Electricity Store Center Maharajganj to Work Site. |
| 7 | Safe Loading, Carriage & Unloading of Stay Set Complete From Electricity Store Center Maharajganj to Work Site. |
| 8 | Safe Loading, Carriage & Unloading of Earthing Complete From Electricity Store Center Maharajganj to Work Site. |
| 9 | Providing and Installation of CROSS ARM HOLDING CLAMP WITH NUT AND BOLT |
| 10 | Providing and Installation of STAY CLAMP |
| 11 | Providing and Installation of NUT AND BOLT |
| 12 | Providing and Installation of F BRACKET FOR PCC POLE |
| 13 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (11.00 Mtr Long) as per drawing. |
| 14 | Erection of 11.00 mtr Single PCC Pole with all accessories (Cross arm, 33KV Pin insulator with pin, Disc Insulator, F-bracket etc.) as per specification. |
| 15 | Grouting of 11.00mtr PCC Pole With Material as per specification. |
| 16 | Laying sagging and binding of of ACSR DOG Conductor on eracted pole |
| 17 | Intallation of Stay set complete as per specification |
| 18 | Concreting of stay set as per specification |
| 19 | Intallaed of Earthing Complete of 11 Mtr PCC Pole as per specification. |
| 20 | Fixing, tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, including providing & fixing of Stay. |
| 21 | Carriage of Dismentalled Material from work site to store centre Maharajganj Please Enable Macros to View BoQ information |