|
| 1 | Supply, installation, testing and commissioning of Pressure Transmitter with proper wiring including necessary power pack for supply of DC complete all as specified and directed:-Power supply : 24 V DCEnclosure : IP 65Temperature : 0 to 80 CelsiusAccuracy : Maximum 1 %Pressure Range : 0 - 40 barOutput Signal : 4-20 mAResponse Time : 4 ms Make : I&S/Endress+Hauser/Yokogawa/Rosemount |
| 2 | Supply, Installation,Testing and Commissioning of Smart Hydrostatic Level Transmitter at Sump and overhead tank for measurement of level with following specification complete all as specified and directed:- Range : 0-10 meters Accuracy : 0.2 % minimum Supply Voltage : 24 V DC Output : 4-20 mAOperating Temprature : 0 to 50°CResponse Time : Minimum 150 msNOTE :- 1). The Level Sensor Indicator need to be covered in a polycarbonate box of suitable size before installation on OHT or Sump.2). The Programming of Level Sensor, e.g. Changes in range of sensor, changes in operational features etc. shall be carried out by authorized system integrator of the provided makes. The programmer shall submit a letter from the OEM as proof of his being an authorized system integrator of the OEM. The programmer shall also submit a signed report on original letterhead of the OEM that testing & commissioning has been carried out by him. Make: I&S / Endress+Hauser / Siemens. |
| 3 | Supply, Installation, Testing & Commissioning of Indoor type PLC (Programmable Logic Controller) based Pump and Valve Automation, Protection Panel comprising with Wirelesss GSM based Communication suitable for control and monitoring of 01 No Submersible Pump, 02 Nos Motorized Butterfly Valve, 02 Nos Electrical Actuator for Sluice Gate Valve, 01 No Pressure Transmitter, 01 Nos Hydrostatic Level Transmitter, 01 Nos Flow Meter complete all as specified and directed. The panel should be of minimum size 1100(H) X 1000(W) X 300(D) mm fabricated with 2 mm thick CRCA Sheet. (Location :- Pump House No. 1,2,8,10, Polo, Panditwari, Ranghanwala, OTCT, MT) (i) The Panel should also comprising the following items:- (a) Water Level Sensing & Display(b) Automatic Pump On/Off (c) Automatic Operation of Motor Actuated Sluice & Butterfly Valves (d) Single Phasing Prevention (e) Auto Mode Operation (all connected sub systems including all valves in pump houses and pumps) from the PLC based Control Panel.(ii) 01 No PLC with follwing specifications:- (MAKE : HORNER/L&T/GE AUTOMATION/PHOENIX CONTACT)(a). 1 Nos RS 485 communication port and 1 No Ethernet communication port.(b). Suitable Nos of digital / analog input and outputs.(c). Programming Software based on IEC to facilitate building of custom build function blocks.(d). Industrial Grade Processor, Web Server and SMTP E-mail service.(e). Protocol : Master/Slave Modbus; Expandable upto 248 I/O’s and 7 expansion module.(iii) 01 No HMI - 4\\" Graphical Touch screen display with follwing specifications:- (MAKE: HORNER/ L&T/ GE AUTOMATION/ SCHNEIDER) |
| 4 | (a). 01 No RS 485 communication port and 01 No. USB port (b). Serial multilink and USB downloading port (c). Support external data storage on a USB memory stick for storing production data and backing up applications.(iv) 01 No SMPS of 5A rating suitable according to panel design. (MAKE : MEAN WELL / SCHNEIDER / TTPL/ PHOENIX CONTACT / OMRON)(v) Suitable Nos of interposing relays of 220VAC & 24 VDC coil rating and 6 A contact rating.(vi) Suitable Nos of relay cards with operating voltage 24VDC, with continuous current of 5A. Card must be of 8 channel & having 8 relays.(vii) MCB rating 16A, 10A, 6A as suitable according to panel design. (viii) Illuminiated push button, Indicator lamp, Selector switches as suitable according to panel design. (ix) Audio visual alarm indicator as suitable according to panel design. CRCA EnclosureMake of the PLC based panel (MAKE : I&S / Adlec / Tricolite / Rockwell Automation )NOTE : (i) The Programming, Testing, Commissioning & Integration of PLC Panel shall be carried out by authorized system integrator of the provided makes. The programmer shall submit a letter from the OEM as proof of his being an authorized system integrator of the OEM. The programmer shall also submit a signed report on original letterhead of the OEM that Programming, Testing, Commissioning & Integration has been carried out by him. (ii) The quotatd rate shall be included the rate for testing commissioning and integration of PLC. |
| 5 | Supply, installation, testing and commissioning and Programming of Master Control Station (SCADA Software).The scope includes:-Services for programming, configuration and customisation of the Smart Station Platform with respect to the Water supply Module as per actual site conditions and requirement of the engineer. (a). Landing Page to depict criritcal paramters viz. - Level of water in all tanks, pump status ON/OFF/FAIL(b). Creation of drop down tabs to monitor the all Pump houses and Remote PLC Panel systems individually(c). Creation of individual PLC Panel wise schematics and layouts for the Water Supply system as per the actual site including display of all relevant parameters viz. Water level, Pump ON/OFF/FAIL status, Valve OPEN/CLOSE/FAIL status(d). Soft keys for remote manual operation of all pumps and motorised valves from the Master Control station. (e). Creation of Day wise Reports for :-(i) Run hours of pumps(ii) Pump / valve operation failures(iii) Active/Return status of each equipment with date and time.(iv). Configuring notifications, alerts and alarms as per preset logic. (v) Consumption Patterns - Daily, Weekly, Monthly and Annually. Make of SCADA: - Schneider Electric, GE Automation, Siemens, Rockwell Automation, L&T / Phoenix Contact.(f). Personal Computer as central Server for development version of the scada software and reporting the software with following specifiaction:- Intel 8th Gen Core I5, 16 GB RAM, 1 TB HDD, Keyboard / Mouse. Make:- Dell, HP, Lenovo & 32 inches LED monitor/ LED TV Make:- Sony, Samsung, LG. (g). 2KVA UPS including batteries for 1/2 Hr backupNOTE:- Contractor shall provided 02 Nos trained operator in each server room (02 Nos) during defect liability period of 02 years without any extra cost. |
| 6 | Supply, Installation, testing and Commissioning of 150 mm dia, single phase, Motor Actuated Butterfly valve with disc material SS - 304, Stem Material SS - 410, Seat EPDM, hand wheel for manual operation and having 02 nos. limit switches for Open / Close condition, valve position indicator. The housing of actuator should be of Aluminium Dicast. The actuator must have planetary gear set to transfer the largest torque in the most compact form. The mounting shall be indirect on valve type.Input Voltage : 24V DCDesigned Line Pressure : 16 kg/sq cm.1). Wiring & Testing of Mototrized Butterfly Valve shall be carried out by authorized system integrator of the provided makes. The engineer shall submit a letter from the OEM as proof of his being an authorized system integrator of the OEM. The engineer shall also submit a signed report on original letterhead of the OEM that wiring & testing has been carried out by him. Make of Actuator - I&S / EMERSON / ROTORK / AUMAMake of Butterfly - I&S / AUDCO / KIRLOSKAR |
| 7 | Supply, Installation, testing and Commissioning of 100 mm dia, single phase, Motor Actuated Butterfly valve with disc material SS - 304, Stem Material SS - 410, Seat EPDM, hand wheel for manual operation and having 02 nos. limit switches for Open / Close condition, valve position indicator. The housing of actuator should be of Aluminium Dicast. The actuator must have planetary gear set to transfer the largest torque in the most compact form. The mounting shall be indirect on valve type.Input Voltage : 230V AC Designed Line Pressure : 16 kg/sq cm.Gear Set Type : Planetary Gear Set1). Wiring & Testing of Mototrized Butterfly Valve shall be carried out by authorized system integrator of the provided makes. The engineer shall submit a letter from the OEM as proof of his being an authorized system integrator of the OEM. The engineer shall also submit a signed report on original letterhead of the OEM that wiring & testing has been carried out by him. Make of Actuator - I&S / EMERSON / ROTORK / AUMAMake of Butterfly - I&S / AUDCO / KIRLOSKAR |
| 8 | Supply, Installation, Testing and Commissioning of 150 mm dia, Water Flow Meter, along with all necessary installation accessories like barrel piece, double nipple, elbows/bends etc with following specification complete all as specified and directed:- Accuracy: - ± 0.5% of reading Flow velocity range, m/s: - 0.02 - 5Output: - 4-20mA output.Maximum pipeline pressure, MPa / bar: - 25Ambient temperature range, °С: 0 - 65Power Supply: - 230 vACProtection: - IP 65Technical Specification: - Less than 0.01 m/s starting velocity, Two line digital LCD accumulative flow and for instantaneous flow, Date cumulative record and data acquisition function, Various of Units selected, including Cubic meter, USA gallon, Cubic feet and Liter, Display parameters: - Flow Rate, Totalizer - Forward, Reverse.NOTE :-1). Supply, wiring & testing, commissioning, programming of Water Flow Meter shall be carried out by authorized system integrator of the provided makes. The engineer shall submit a letter from the OEM as proof of his being an authorized system integrator of the OEM. The engineer shall also submit a signed report on original letterhead of the OEM that programming, wiring & testing, commissioning has been carried out by him. Make: I&S /EMERSON/KROHNE MARSHALL/ YOKOGAWA ELECTRIC |
| 9 | Supply, Installation, Testing and Commissioning of 100 mm dia, Water Flow Meter, along with all necessary installation accessories like barrel piece, double nipple, elbows/bends etc with following specification complete all as specified and directed:- Accuracy: - ± 0.5% of reading Flow velocity range, m/s: - 0.02 - 5Output: - 4-20mA output.Maximum pipeline pressure, MPa / bar: - 25Ambient temperature range, °С: 0 - 65Power Supply: - 230 vACProtection: - IP 65Technical Specification: - Less than 0.01 m/s starting velocity, Two line digital LCD accumulative flow and for instantaneous flow, Date cumulative record and data acquisition function, Various of Units selected, including Cubic meter, USA gallon, Cubic feet and Liter, Display parameters: - Flow Rate, Totalizer - Forward, Reverse.NOTE :-1). Supply, wiring & testing, commissioning, programming of Water Flow Meter shall be carried out by authorized system integrator of the provided makes. The engineer shall submit a letter from the OEM as proof of his being an authorized system integrator of the OEM. The engineer shall also submit a signed report on original letterhead of the OEM that programming, wiring & testing, commissioning has been carried out by him. Make: I&S /EMERSON/KROHNE MARSHALL/ YOKOGAWA ELECTRIC |
| 10 | Design, fabricate, supply, installation, testing and commissioning of indoor type motor Starter floor mounting of suitable size CRCA approved sheet metal made suitable for Pump. The panel should be anti-acid & anti corrosive complete all as specified and directed. |
| 11 | Supply, installation, testing and commissioning of Electrically Operated Intelligent Valve Actuator for existing Sluice Valve with proper wiring including necessary power pack for supply of Three Phase complete all as specified and directed:-Type : On/OffPower supply : 415 V Three PhaseEnclosure : IP 65Temperature : 0 to 50 Degree CelsiusOperation : Local / RemoteMax Torque : 200 - 2000 NmInput Signal : 24 VDCDrive HP : 1 HP Make : I&S / Auma / Rotork |
| 12 | Supply, installation, testing, commissioning and Programming of Reporting Software with user configurable reports along with data collection of parameters, events, alarms complete with user defined logo, user name, date and time, page no., header and footer all as specified and directed.MAKE : Ariva / Factory Talk View / Lab View |
| 13 | Supply only 3 Core 50 sq.mm PVC sheathed PVC insulated multistand copper armoured cable complete all as specified and directed. |
| 14 | Supply only 1 Core 2.5 sq.mm PVC insulated multistand copper wire complete all as specified and directed. |
| 15 | Supply only 1 Core 1 sq.mm PVC insulated multistand copper wire complete all as specified and directed. |
| 16 | Supply only 1 Pair 1 sq.mm PVC insulated multistand copper armoured wire complete all as specified and directed. |
| 17 | Supply only 20 Core 1 sq.mm PVC insulated multistand copper armoured wire complete all as specified and directed. |
| 18 | Supply and Fixing Galvanised Iron (GI) light grade pipeb25 mm dia ( ISI marked ) with all fittings such as elbow, tee, coupling etc laid in trenches or on pole, crossing of road, fixed on wall for protection of cables complete all as specified and directed. |
| 19 | Supply and Fixing PVC Conduit pipe heavy grade 50 mm dia ( ISI marked ) with all fittings such as elbow, tee, coupling etc laid in trenches or on pole, crossing of road, fixed on wall for protection of cables complete all as specified and directed. |
| 20 | Supply and Fixing HDPE Medium grade pipe 40 mm dia ( ISI marked ) with all fittings such as elbow, tee, coupling etc laid in trenches or on pole, crossing of road, fixed on wall for protection of cables complete all as specified and directed. |
| 21 | Supply and Fixing pipe GI Cable Tray Medium grade 80 mm dia ( ISI marked ) with all fittings such as cable tie, bend, end c, coupling etc laid on wall, fixed on wall for protection of cables complete all as specified and directed. |
| 22 | M & L for Earthing complete with GI earth plate electrode 600x600x6mm thick buried directly in ground (Earth pit not less than 1.25M deep below normal ground level) with top edge of the plate not less than 1 m below normal ground level, connected to galvanized earth strip 25x4 mm by means of nut, bolt, check nut and washers including necessary excavation and earth work in soft/loose soil, GI protection pipe light grade 40mm bore for protecting the GI strip mesh funnel alternate layer of charcoal dust and salt PCC pit 1:3:6 type C-1 using 20mm graded stone aggregate and 50mm thick RCC 1:2:4 type B-1 using 20mm graded stone aggregate cover, re-inforced with 8 mm dia MS TMT bars 80mm C/C both ways complete all as specified and shown in Electrical plate No.3 SSR part-I and connected to the earth point and testing complete all as specified and directed. |
| 23 | Design, fabricate, supply, installation, testing and commissioning of indoor type Auto Phase Reversal Unit with 2 Nos 110 Amp Contactors, 4 Nos 6 Amp MCB, Phase Failure Relay and suitable Current Transformer floor / wall mounting of suitable size CRCA approved Sheet Metal complete all as specified and directed. |
| 24 | Supply, installation, testing and commissioning of Junction Box of 40 Terminal installed at each site for proper wiring and cabling of instruments and other devices complete all as specified and directed. |
| 25 | Supply Installation, Testing & Commissioning of GSM based Modem for Communication at sites as well as SCADA station complete all as specified and directed. Please Enable Macros to View BoQ information |