| 1 | Total Amount of BoQ2 with GSTPlease enter GST in % in N column on total Amount |
| 2 | Total Amount of BoQ3 with GSTPlease enter GST in % in N column on total Amount |
| 3 | Part-A: Deployment of Resources |
| 4 | Deployment of Highly Skilled Manpower for Supervision of works (Wage component is inclusive of minimum wage rate, PF, Overheads) |
| 5 | Deployment of Skilled Manpower for Plumbing Works (Wage component is inclusive of minimum wage rate, PF, Overheads) |
| 6 | Deployment of Skilled Manpower for Conversion (Wage component is inclusive of minimum wage rate, PF, Overheads) |
| 7 | Deployment of Un-Skilled Manpower- Helper for Plumbing works (Wage component is inclusive of minimum wage rate, PF, Overheads) |
| 8 | Part-B: Deployment of Tools & Machinery |
| 9 | Boarding & Lodging charges for the resource deployed at A1 to A4 |
| 10 | Plumbing Tool Kit consisting the following minimum items (Not limited to):Drill Vice,1; Ratchet Die Set ,1;Pipe Wrench 12\\",2;Cutter,1;Adjustable Spanner 8\\",1;Monkey Plier 8\\",1;Cutting Plier 8\\",1;Hammer,1;Screw Driver Set ,1;Hammer Machine (Heavy) 26mm,1;Hammer Machine (Light) 20mm,1;Concrete Bit 6mm ,2;Concrete Drilling Bit (25 mm),2;Concrete Drilling Bit (18 mm),2;Extension (WIRE)- 10 meter 3 core,1;Measuring Tape 5 Mtrs,1;Cutter (Copper),1;Gas Torch ,1;Gas Can ,1;Soldering Wire ,1;Copper Rod (Bender) 1/2\\",1;Cutter (MLC),2Spring Balancer (Bending),2;Reamer (MLC),2;Oil & Other tolls / Consumbales required for Plumbing works including other consumables, etc. for completing the plumbing works for installing GI, Cu & MLC Pipes.The tools & tackles set should be available at site at all the time and shall be repaired, replenished as & when required if found missing/damaged. The work should not hamper due to non-availbility of Tools & Tackels. The above tools shall be handed over to GAIL Gas after completion of contract in working condition. (All mentioned tools and tackles are to be provided in 1st month only, payment shall be done in 1st RA bill after supply of tools and tackles). |
| 11 | Rope Access System for 100m length of PETZL or equivalent with all the ascessories as per the attached specifications.The above rope Access system shall be handed over to GAIL Gas after completion of contract in working condition. (All Rope Access System are to be provided in 1st month only, payment shall be done in 1st RA bill after supply of Rope access system). |
| 12 | Providing services for 4 wheeler (TATA ACE or Equivalent) on 24X7 hour with 5 KVA Generator, Electro fusion machine etc, for movement of equipment for Ground connectivity & other works ; Includes cost towrads driver,fuel, insurance, maintenance, licenses, tools, parking & other charges. The anticipated approxiamte running km/month per vehilce could be is about 1250km |
| 13 | Providing Services for 2 Wheeler for movement of work force deployed by Contractor for carrying out activites as per scope of work ; Includes cost towrads fuel, insurance, maintenance, licenses, tools, parking & other charges., safety gadgets, etc.The anticipated approxiamte running km/month per vehilce could be is about 2000km. |
| 14 | Carrying MDPE Ground Connectivity works by any method (Opencut/Moling/HDD etc.) and restoration. Separate resources, apart from those deployed under Part-A, shall be engaged for the same. |
| 15 | MDPE PIPELINE TO GI CONNECTIVITY FOR INDIVIDUAL HOUSES /APARTMENT/INDUSTRIAL/COMMERCIAL PNG CONNECTION: Laying of MDPE Pipeline of PE100 grade with SDR 11 of sizes 20mm, 32mm, 63 mm & 90 mm upto 10m length in Bengaluru Geographical Area (GA). In case the length exceeds 10m for MDPE pipeline connectivity including Road/Drain etc crossings if any, the payment for the additional length will be made prorated basis as per the SOR item (Example: If the rate for 10m connectivity is ₹3000, then laying of 2m additional MDPE beyond 10m, the payment shall be 2x(3000/10) = ₹600/-). Each Transition fitting used for last mile connectivity for PE to GI shall be considered for certification of connectivity payment under this SOR item.The following works are also included in the scope of this item: |
| 16 | Trenching of the required width and depth in all kinds of soil, asphalt roads, concrete pavements/roads, all kind of pathways or laying of PE pipes of sizes 20 mm, 32mm, 63mm & 90mm for maximum length upto 10m from saddle /tee connectivity at one end for connecting with the existing PE network and TF at the other end for GI pipe connectivity at the other end including crossing of MDPE pipes below the drains as required depending on the drain depth but not less than 1000 mm cover from drain bottom slab. |
| 17 | This item covers supply and installation of MDPE to GI Transition fitiings alongwith TF guard (Transition fitting of Size 1\\" x 32 mm with 1000 mm length 4 inch GI TF guard/ TF of size 3/4\\" x 32 mm with 1000 mm length 4\\" inch GI TF guard / TF of size 3/4\\" x 20 mm with 1000 mm length 2.5\\" inch GI TF guard/ TF of size 1/2\\" x 20 mm with 1000 mm length 2.5\\" inch GI TF guard ), Supply & Installation of 1m length GI pipes (sizes 1\\" or 3/4\\" or 1/2\\" ) as per IS-1239 (B-Class/ Medium), supply & installation of Isolation valve & end plug. Refer tender drawing for sizes of PE pipes, TF & GI pipe, valve for carrying out MDPE to GI Last Mile connectivity to various Domestic, Commercial & Industrial Customers . Each transition fitting used for Last mile connectvity for 20/ 32mm PE to GI shall be considered for certification of this connectivity payment under this SOR Item. |
| 18 | The GI pipe to be extended above ground after TF and valve to be installed in vertical portion of GI pipes, end plug to be done at the end of GI pipe. The GI pipe shall have coating with 60 micron synthetic paint of approved colour and shade. Alternatively, pipes and fittings to be applied with two coat of synthetic enamel paint of approved make and colour. The application of paint shall be before fixing the pipe to wall. |
| 19 | TF guard shall be 300-400 mm above ground level and 600 mm below ground level, filling the annular space inside the TF guard with sand. Supply of sand is included in this item. |
| 20 | Item includes pneumatic testing of the assembled section as per the specification and standard procedure of testing of the assembled section as per the specification and standard procedure of testing of the complete installation, supply and fixing of approved clamp, fasteners, supports etc. All threading shall be NPT threading with thread making machine. |
| 21 | MDPE pipeline to GI connectivity for individual houses/ Apartments for PNG connection(Connectivity from High Pressure line -4 bar(g)) for a length upto 10m and excavtion of pit upto 2m depth. For excavtion beyond 2m depth to identify charged Pipeline, additional payment shall be made as per SOR item B6.2 & B6.3 |
| 22 | For excavtion beyond 2m and upto 3m depth to identify charged Pipeline, additional payment shall be made as per this SOR |
| 23 | For excavtion beyond 3m depth to identify charged Pipeline, additional payment shall be made as per this SOR item |
| 24 | Restoration of PitsAfter laying of Pipeline, back filling with available soft soil upto depth of minimum 300mm, placing warning mat of 0.5 mm thk and 250 mm wide with tracebaility provision (as per attcahed specfications) as per given drawing or as per instruction of GGL/EIC, dressing the backfilled and compacted soil and backfilling & compaction of remaining trench depth with available soil.Restoration of the pits and all kind of surfaces (RCC/PCC Concrete/Asphalted/Tiled/Paver) upto 10 m length to the original condition 1). Restoration of Molling/HDD pits on Asphalt road shall be carried out as per requirement of Local authoritity/GBA/Municipal Corporation/BDA/KIADB/KRDCL/NHAI/BMRCL/KHB/GRAM PANCHAYAT/PWD/LOCAL ASSOCIATIONS/MORTH etc.2). Cutting of Asphalt/concrete Road top For pits: Top layer of asphalt/ Concrete shall be cut open by employing mechanized saw/cutters for maintaining straight line for excavating Entry and Exit pits.3) Restoration of entry/exit pit shall be carried out by filling the bottom layer with stone grit, followed by 200mm thk. GSB & 250mm thk. WMM with top bituminous layers comprising of 50mm thk. BM & 25mm thk. Premix carpeting matching with the existing road top level. |
| 25 | Laisoning works for making the Last Mile Connectivity to Domestic, Commercial & Industrial Customers from the existing mainline: The item includes the liasoning from the concerned authorities such as BBMP / BDA / BWSSB local offcials, traffic ploice, police, BESCOM, BSNL,NHAI, Railways, BWSSB, RTO etc. and any other utility companies / agencies such OFC operators etc for carrying out the connectivity from mainline. Repairing/replacement of all damaged utilities if any, and payment of any compensation (if claimed by owner/other utility agencies) is in scope of the Contractor. |
| 26 | Core cutting in basement walls , supplying and grouting of GI sleeves for PE pipe laying, Core cutting in concrete, stone, granite etc. upto 2”. Job needs to be carried out at customer premises or at the location informed by GG. Due care is to be taken during execution of the job, all restoration after completion is to be carried out. Tools required for the job is in the scope of contractor. Please Enable Macros to View BoQ information |