| 1 | Total of Schedule-A (DSR 2023 Items) + Schedule-C (Horticulture DSR 2025) |
| 2 | Total of Schedule-B(NDSR Items (Manpower) |
| 3 | Total of Schedule-A(DSR 2023 Items) |
| 4 | Total of Schedule-C (Horticulture DSR 2025) |
| 5 | Total of Schedule-B (NDSR Items (Manpower) OCH-2225 APPENDIX- 3A PROFORMA FOR STATEMENT OF MINOR DEVIATIONS (Refer Clause C 2.2(d) and C 15.1 of ITT) 1. The following are the particulars of minor deviations from the requirements of the Tender Document: Sr. No Clause Deviations Price reduction for each deviation/s Note : 1. The Tenderer shall indicate price reduction against each deviation in Appendix-3A of BOQ. This price is the price which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer. 2. Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No Deviations’. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the tenderer has not proposed any deviations from tender documents. 3. It shall be noted that in case Nil/Zero/NA Price quoted by Tenderer in Appendix-3A then it shall mean that contractor has quoted same price for deviation and undeviation bid. 4. If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Appendix, it will have no effect. Signature of authorized signatory On behalf of Tenderer OCH-2225 Preamble |
| 6 | The Bill of Quantities shall be read in conjunction with Notice Inviting Tenders, Instructions to Tenderers, General and Special Conditions of Contract, Employer's Requirements, Technical Specification and other relevant documents. |
| 7 | BOQ consists of Schedule ‘A’ for Civil DSR 2023 items, Schedule 'B' for NDSR (manpower), Schedule ‘C’ for Horticulture DSR 2025 items. |
| 8 | Tenderers shall quote their offer in Indian Rupees (INR) only. Tenderers are required to be quoted percentage (%) Excess/Less for schedule-A and Schedule-C & (%) Excess for Schedule-B in figures in the appropriate highlighted cells in the BoQ sheet. Negative ( Below) quoting is not allowed in Schedule -B NDSR Items (Manpower). |
| 9 | Tenderers shall quote their offer in Indian Rupees (INR) only. Tenderers are required to be quoted percentage (%) Excess/Less for schedule-A and Schedule-C & (%) Excess for Schedule-B in figures in the appropriate highlighted cells in the BoQ sheet. All the quoted rates will be deemed to include Duties, Taxes, Octroi, Royalty etc., cost of all plants, labour, supervision, materials, transport, all temporary works, erection, maintenance, utility identification, contractor’s profit and establishment/ overheads, together with preparation of design and drawings, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contracts. For taxes and duties refer clause C2.5 of ITT & clause 10 of SCC. |
| 10 | The price offer in the BOQ shall be given without considering any deviation mentioned in Appendix-3 of FOT i.e. price in the box shall be quoted as per tender conditions without any deviation. |
| 11 | If the tenderer fails to quote rates against any item, the tender may be treated as incomplete and non- responsive and shall be rejected. |
| 12 | Errors will be corrected by the employer for any arithmetical errors in computation or summation as per contract conditions. |
| 13 | The Financial Proposal (as per BOQ) shall be uploaded online on the website http://etenders.gov.in/eprocure/app. The rates shall be quoted in the excel file provided in the bid documents. The tenderer shall download the excel file and quote the rates against each highlighted cells in BoQ1. After quoting their rates the excel file shall be uploaded accordingly. The rates shall not be offered/quoted elsewhere in the technical submission/ tender submission. |
| 14 | The actual work executed against all the BOQ as detailed in tender document would be paid on measurement basis. |
| 15 | The contractor may raise their “On Account” payments on monthly basis as per the status of work on the last day of the respective month as per clause 12 of SCC. |
| 16 | In case of DSR item the description is given in brief and detailed description of item should be as given in DSR 2023 (Civil) published by CPWD. Please Enable Macros to View BoQ information DELHI METRO RAIL CORPORATION LIMITED BOQ Name of Work: Contract No.: OCH-2225 - “Maintenance of Horticulture at Medians of roads below Metro Viaduct for Line-2N section (GTBR to SPBI) for One Year”. Schedule-A DSR 2023 Sr.No. Item Description Unit Qty Rate (Rs.)(Including GST@18%) Amount (Rs.) (Excluding GST@18%) GST Amount (Rs.) Amount |
| 17 | 13.62 13.62.1 Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture Sqm 8000.0 226.25 1533898.31 276101.6958 1810000.01 |
| 18 | 13.99 13.99.1 One or more coats on old work Sqm 8000.0 102.8 696949.15 125450.847 822400.0 |
| 19 | 13.99 13.99.1 One or more coats on old work Sqm 3666.3 102.8 319403.08 57492.5544 376895.63 |
| 20 | 300929.56 Total of DSR 2023 3310225.2 Total of DSR 2023 after DAR 2023 by considering correction factor of 0.973 3220849.12 Total of Schedule-A (DSR 2023 Items) (Exclusive of GST@18%) 2729533.15 GST @18% 491315.97 Total of Schedule-A (DSR 2023 Items) (Inclusive of GST@18%) 3220849.12 Schedule-B NDSR Items (MANPOWER) Sr.No. Item Description Unit Qty Rate (Rs.)(Including GST) Amount (Rs.) Excluding GST GST Amount (Rs.) Amount |
| 21 | NDSR -1 |
| 22 | NDSR -2 Total of NDSR 5958828.0 Total of Schedule-B NDSR Items (Manpower) (Exclusive of GST@18%) 5049854.24 GST @18% 908973.76 Total of Schedule-B NDSR Items (Manpower) (Inclusive of GST@18%) 5958828.0 Schedule-C Horticulture DSR 2025 |
| 23 | 2.4 2.4.1 Screened through sieve of I.S. designation 20 mm Cum 60.0 391.35 19899.15 3581.847 23481.0 2.4.2 Screened through sieve of I.S. designation 16 mm cum 60.0 447.05 22731.36 4091.6448 26823.0 2.4.3 Screened through sieve of I.S. designation 4.75 mm Cum 60.0 491.65 24999.15 4499.847 29499.0 |
| 24 | Total of DSR Horticulture 2025 2392350.0 Total of Schedule-C (Horticulture DSR 2025) (Exclusive of GST@18%) 2027415.25 GST @18% 364934.75 Total of Schedule-C (Horticulture DSR 2025) (Inclusive of GST@18%) 2392350.0 Total of Schedule-A + Schedule-B + Schedule-C (Exclusive of GST@18%) 9806802.64 Grand Total of Schedule-A + Schedule-B + Schedule-C (Inclusive of All) 11572027.12 . |