| 1 | 90 Deg Cut Point:-WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) ( Total Pole Weight with Base Plate & Stiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg) |
| 2 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 3 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 4 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306) |
| 5 | Danger Plate, 1 no's. |
| 6 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 7 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 8 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 9 | 11 KV pin insulator polymer |
| 10 | H W fitting(B&S) 70KN, 3Bolt |
| 11 | Disc insulator (B&S) 70 KN polymer |
| 12 | Earthing of Support ( Coil Type ) |
| 13 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 14 | WEDGE Connector for Clamp for 55 sq.mm conductor |
| 15 | Polycarbonate Bird Guard |
| 16 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 17 | H.T. Stay set (Complete ) |
| 18 | H.T. Stay Insulator Type-C |
| 19 | 7/10 SWG Stay Wire 15kg /stay |
| 20 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 21 | Black Paint(GIS Numbering & Zebra Stripping) |
| 22 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 23 | 11 KV Line:-WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) ( Total Pole Weight with Base Plate & Stiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg) |
| 24 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 25 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 26 | Danger Plate, 1 no's. for each pole |
| 27 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 28 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 29 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 30 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 31 | Earthing of Support ( Coil Type ) |
| 32 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 33 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 34 | 55 SQ.MM. AAAC XLPE Conductor |
| 35 | Black Paint(GIS Numbering & Zebra Stripping) |
| 36 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 37 | Polycarbonate Bird Guard |
| 38 | Civil and Services Works ( 11 KV line):-Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 39 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 40 | Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 41 | LT Line:-9 Mtr. long 300 Kg. PSC Pole |
| 42 | LT Stay set Complete |
| 43 | 7/12 SWG GI stay wire, Grade -2 |
| 44 | LT stay Clamp ( 1.40Kg/pair) |
| 45 | LT Stay insulator |
| 46 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 47 | EYE hook for XLPE Aerial bunched Cable |
| 48 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 49 | Suspension Clamp with EYE hook for ABC |
| 50 | 4C×50 mm² (P)+1C×50 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 51 | 4 WAY SERVICE Distb. Box with kit kat fuse and Aluminium bus bar. |
| 52 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 53 | GI Pipe Earthing (each 5th pole to earth) |
| 54 | Coil Earthing |
| 55 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 56 | Danger plate (LT) |
| 57 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 58 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 59 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 60 | GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 61 | Black Paint(GIS Numbering & Zebra Stripping) |
| 62 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 63 | Civil and Services Works ( LT line):-Fixing of complete LT line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 64 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1550mm) = 0.375Cu.mtr(Per Pole) |
| 65 | Construction Earthing chamber including installation of earthing pipe making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including, installation of 3 Mtr GI pipe 40/50 mm including welding of GI flat around pipe. |
| 66 | Dismantling:-Dismantling of 09/11 Mtr. Joist/ WPB Pole |
| 67 | Dismantling of 9/8 Mtr. PSC Pole |
| 68 | Dismantling of ACSR/AAAC 34/ 55mm2 from overhead line |
| 69 | Dismantling of Varous size of LT AB Cable N.B. The salvage amounting to Rs. 39,607.00 has to be deducted form contractor Bill Please Enable Macros to View BoQ information |