|
| 1 | Supply of Stay Clamp S/E For SP-23 with N&B |
| 2 | Supply of LT Clamp with N&B ST Pole SP-10 |
| 3 | Supply of Top Channel Holding Clamp for SP-23 Pole |
| 4 | Supply of Stay Clamp for SP-21 with N&B |
| 5 | Supply of Bracing Clamp Top for SP-23 with N&B |
| 6 | Supply of Bracing Clamp Bottom for SP-23 with N&B |
| 7 | Supply of MS Nut & Bolt 180x16 mm |
| 8 | Supply of Shackle Insulator 100x115 mm with N&B |
| 9 | Supply of LT Clamp with N&B ST Pole SP-21 |
| 10 | Supply of Stay Clamp for SP-10 with N&B |
| 11 | Hgeadload Cartage SP-10 Pole (1-3 Km) |
| 12 | Excavation of Pit for Stay Set |
| 13 | Erection of Single SP-23 Pole |
| 14 | Cartage SP-10 Pole, 21-50 Km |
| 15 | Excavation of Pit for Pole |
| 16 | Dismanntling of 16 KVA DTR |
| 17 | Erection of 11 KV Stay Set |
| 18 | Dismantling of LT Line 1P 2W(Weasel) |
| 19 | Installation of 16KVA DTR on pole Structure |
| 20 | Dismantling of SP-10 Single Pole |
| 21 | Fabrication of Steel |
| 22 | Erection of SP-23 Double Pole |
| 23 | Laying of AB Cable (1x16+25 mm |
| 24 | Cartage of SP-21/23 Single Pole 71-100km |
| 25 | Erection of Single SP-21 Pole, |
| 26 | Dismantling of SP-21/SP23 Single Pole |
| 27 | Dismantling of 25 KVA DTR |
| 28 | Dismantling of LT Line 3 P w W (Weasel) |
| 29 | Erection of Single SP-10 Pole |
| 30 | Dismantling of SP-23 Double Pole |
| 31 | Laying of Weasel Conductor in HT Line |
| 32 | Dismantling of 11 KV line (Weasel) |
| 33 | Installation of 25 KVA DTR on Pole Structure |
| 34 | Laying of 1 P 2W LT Line (Weasel|) |
| 35 | Laying of 3P 4W LT Line (Weasel|) |
| 36 | Cartage of Petty Material, 21-50 Km |
| 37 | Headload Cartage of Material (1-3 Km) |
| 38 | Laying of AB Cable of Size 120 Sqmm |
| 39 | Cartage of 16/25 KVA DTR, 71-100 Km |
| 40 | Headloaaad cartage SP-21/23 Pole (1-3Km) |
| 41 | Headload Cartage of 25 KVA DTR (1-3 KM) |
| 42 | Headload Cartage of 16 KVA DTR (1-3 KM) |
| 43 | Cartage of 16 KVA DTR 71-100 Km |
| 44 | Cartage of 25 KVA DTR 71-100 Km |
| 45 | Lopping & Chopping of Tree Branches Please Enable Macros to View BoQ information |