| 1 | Total amount of the \\"Rate Schedule\\" sheet SCHEDULE OF QUANTITY AND RATE FOR CONSTRUCTION OF NEW 33/11 KV SUB-STATION, NAGAR NIGAM (2X12.5 MVA) UNDER EDSD, HARIDWAR ROAD UNDER EDD, RISHIKESH AGAINST E-TENDER SPECIFICATION NO.26/EDCRDDUN/2026-27 Name of The Bidder's Firm: 0.0 Sl. No. Description of Work Unit Qty Rate Amount Part [A] (Supply Portion) |
| 2 | 33/0.4 KV 100 KVA Sub-Station Transformer |
| 3 | MS Nut & Bolt off size |
| 4 | MS Plate 225x225x8 mm. |
| 5 | MS Rod 32 mm. |
| 6 | Cable Holding Clamp with N&B |
| 7 | Holding Clamp FPR GI Pipe 8/10\\" & MS Channel |
| 8 | PP & Clamp for ST Pole SP-55 with N&B |
| 9 | Stay Clamp for SP-55 with Nut & Bolt |
| 10 | Guard Insulator |
| 11 | Perforated Tray 400 mm for Cable Trench |
| 12 | Perforated Tray 100 mm for Cable Trench |
| 13 | GI Pipe 6 Meter long |
| 14 | Danger Board with Clamp N&B |
| 15 | GI Pipe 4\\" Dia |
| 16 | MS Flat 50x6 mm 0.3x10x2 for CT Structure |
| 17 | 150W, HPSV/ LED lamp with control gear & mounting accessories |
| 18 | 250W, HPSV/ LED lamp with control gear & mounting accessories |
| 19 | 11 KV Fuse Set |
| 20 | Perforated Tray 300 mm for Cable Trench |
| 21 | ACDB (AC Distribution Box) |
| 22 | Bracing Clamp for ST Pole with N&B |
| 23 | HDPE Pipe PE 80 PN6 160 mm |
| 24 | G.I. Pipe 6 inch |
| 25 | Supply of SCADA operated 33 KV,1250A-3P Indoor SF6/VCB, 31.5KAI/C Panel |
| 26 | 33 KV Fuse Set Structure |
| 27 | Danger Board with Clamp (SP-55) |
| 28 | \\"HT\\" Warning Tape |
| 29 | 33 KV HS Cable T/K 3x400 sqmm. I/D |
| 30 | Earthing Rod 20x2500 mm. |
| 31 | 9 KV 10 KA Lightening Arrester for 11 KV |
| 32 | 33 KV 10 KA Lightening Arrester |
| 33 | 33 KV HS Cable end T/K 3x400 sqmm. O/D |
| 34 | 33 KV XLPE HS Cable J/K 3x50 sqmm. O/D |
| 35 | 11 KV XLPE Cable J/K I/D 1x630 sqmm |
| 36 | 33 KV Cable XLPE 3x50 sqmm. |
| 37 | Control Cable 10x2.5 sqmm. |
| 38 | Control Cable 4x2.5 sqmm. |
| 39 | LT PVC Cable 2x6 sqmm. |
| 40 | LT PVC Cable 4x10 sqmm. |
| 41 | 11 KV VCB Transformer Incomer Panel with CTR 800/400/5A |
| 42 | Iron Clad 30 Amp. Switch |
| 43 | DCDB 24V with outgoing MCB |
| 44 | Supply of SCADA operated 33 KV,1250A-3P Indoor SF6/VCB, 31.5KA outgoing Panel for Transformer/ Outgoing |
| 45 | Supply of SCADA operated 33 KV,1250A-3P Indoor SF6/VCB, 31.5KA Buscoupler Panel for 2 Nos I/C |
| 46 | Supply of 33 KV,1250A-3P Indoor SF6/VCB, 31.5KA Bus Raiser Panel to Connect Buscoupler to I/C Panel |
| 47 | 11 KV GO Switch |
| 48 | 11 KV Bus Raiser to connect Bus Coupler Panel |
| 49 | 24 V Battery Set |
| 50 | 24 V Battery Charger |
| 51 | Drawing Board of Substation SLD |
| 52 | Name Plate of Equipment TG, LI, BI, CT, CB etc. |
| 53 | MS Bar 12 mm. Dia for Steel Reinforcement |
| 54 | G.I. Earth Strip 65x6 mm. |
| 55 | Sundry item Lug, Gland etc. |
| 56 | Fabrication 2 mtr. Long 1.8 mtr. Highwire mesh gate |
| 57 | GI Strip 40x6 mm. |
| 58 | Stone Pad 300x300x75 mm. |
| 59 | Rubber Mat (Insulated) 1Mx1Mx3MM |
| 60 | Nitrogen Injection Fire Protection system for Power Transformer |
| 61 | Instruction Board |
| 62 | Maximum & Minimum Display Board |
| 63 | Sub Station Name Board |
| 64 | Fire Extinguisher ABC Type 5 Kg. |
| 65 | Fire Bucket Stand with Buckets |
| 66 | Foam Fire Extinguisher 9 Ltr. |
| 67 | Fire Bucket Stand of MS angle |
| 68 | J/K for 3x300 sqmm. 11 KV XLPE Cable (I/D) |
| 69 | J/K for 3x300 sqmm. 11 KV XLPE Cable (O/D) |
| 70 | 11 KV XLPE Cable J/K O/D 1x630 sqmm. Total - Part [A] 0.0 Part [B] (Labour Portion) |
| 71 | NSI Earth Filling |
| 72 | Excavation in Soil |
| 73 | Cement Concreting Work in Ratio 1:4:8 for Power Transformer Plinth |
| 74 | Cement Concreting Work in Ratio 1:1:5:3 for Power Transformer Plinth |
| 75 | Brick Work in 1:4 Ratio for Power Transformer Plinth and Gravel |
| 76 | Cement Plaster Work for Power Transformer Plinth |
| 77 | Erection of 6\\" HDPE Pipe |
| 78 | Making Cable Trench |
| 79 | Brick Work 1:6 Sub Structure |
| 80 | Making Special type separate earthing for neutral /body of Power transformer by digging 3x4x12 feet deep pit at corner of Swithchyard with duly provided 1 No. coal Iron earth plates of size 18''x18''x½'' jointing them with 6'' long bolt duly coverod with layer of softcoal 60 Kg. and salt 20 Kg. (Total 80 Kg.) connecting them with the main earth mat, The earth plate shall be connected with 35x6 mm GI Strip and GI strip shall be laid upto the neutral and T/F body separately (Including supply of steel). |
| 81 | Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracking and special type bracket etc. as per RESPO schedule and local approved drawing. |
| 82 | Fixing of GI Pipe |
| 83 | Erection of following Single support pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESPO construction Manual. SP-10 Nos 8.0 0.0 |
| 84 | Erection of following Double support pole in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps as per RESPO construction Manual. SP-55 Nos 7.0 0.0 |
| 85 | Painting of poles with angle and channel and all steel part by one coat of Rod Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level. ST Pole SP-10 Nos 8.0 0.0 |
| 86 | Laying of Underground LT Cable 4x25 sqmm. in Trench |
| 87 | Laying of Underground 33 KV Cable 3x50 sqmm. (Trenchless) |
| 88 | Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work |
| 89 | Mounting and Fixing of Lightning arrestor set (3 Nos.) on double pole structure including making all connections by G.I. strip size 35x6 mm to earth point complete work (excluding cost of G.I.Strip) |
| 90 | Fixing of 11 KV XLPE Jointing Kit |
| 91 | Fixing of 33 KV XLPE Jointing Kit |
| 92 | Manual Shifting of 11 KV VCB I/C |
| 93 | Manual Shifting of 33 KV VCB |
| 94 | Shifting of 12.5 MVA Transformer |
| 95 | Erection of Power Transformer (12.5 MVA) |
| 96 | Excavation in soil of Earth for Structure erection |
| 97 | Grouting of Structure in CC 1:3:6 |
| 98 | Erection Charges of Structure |
| 99 | Erection of 11 KV VCB (O/G-B/C-I/C) Panel |
| 100 | Digging of Pit for Trench 0.6x10.15x1.5 mtr. |
| 101 | Cartage of 33 KV XLPE Cable , 0-20 Km. |
| 102 | Fixing of 33 KV Isolator Vertical Type |
| 103 | Erection of 33 KV VCB |
| 104 | Erection & Laying of LT Arm Cable 4x10 |
| 105 | Fabrication , Mounting , Fixing Bracing Set on D/P |
| 106 | Spreading & Laying of 33 KV 3x400 in HDPE |
| 107 | Making of Trench Cover |
| 108 | Laying of Control Cable |
| 109 | Manual Shifting of 11/33 KV XLPE Cable |
| 110 | Earthing of Structure using GI Strip |
| 111 | Erection of Line Isolator Structure |
| 112 | Battery Charger & Battery Installation |
| 113 | Making Loop of 33 KV XLPE Cable |
| 114 | Painting of 33 KV VCB Panels |
| 115 | Erection, Providing & Fixing of Wire Mesh fencing |
| 116 | Fabrication of Structure |
| 117 | Installation of 33 KV Post Insulator with All Connection |
| 118 | Fixing Accessories on Double Pole SP-55 |
| 119 | Painting of Double Pole SP-55 |
| 120 | Laying of Cable in Trench |
| 121 | Installation of DCDB Including Testing |
| 122 | Installation of ACDB Including Testing |
| 123 | Erection of Lightening Equipments |
| 124 | Erection of 24 Volt Battery Set |
| 125 | Erection of Stay Post |
| 126 | Fabrication of R.S. Joist 175x85 sqmm. |
| 127 | Straightening and Laying of Earth Mat |
| 128 | Painting of Isolator |
| 129 | Insatllation of Fire Extinguishers |
| 130 | Erection of Name Plates |
| 131 | Painting of Wiremesh Fencing |
| 132 | Painting of Stay Post |
| 133 | Painting of Isolator/LA/CT/Structure |
| 134 | Erection of Nitrogen Injection Fire Protection system for Power Transformer |
| 135 | Erection of 33/0.4 KV 100 KVA Sub-Station Transformer on iron structure Total - Part [B] 0.0 TOTAL [Part-(A) + Part (B)] 0.0 Place Date Superintending Engineer Please Enable Macros to View BoQ information |