|
| 1 | Dismentaling of 600 KVA DG set from foundation with lifting vehicle and transportation DG Set engine assembly from Partapur to Cummins DG set authorised service centere at Delhi/ jammu for over hauling and after repairing transportation to Partapur, installation complete DG set complete all as specified and directed.Note: Manpower, transporting Vehicle and lifting Crane shall be provided by contractor with own resources. |
| 2 | S & F in replacement of oil filter element of 600 KVA DG set make- Cummins complete all as specified and directed. |
| 3 | S& F in replacment of Air cleaner element (inner and outer) suitable of 600 KVA DG set make- Cummins complete all as specified and directed. |
| 4 | S& F in replacment of Fuel filter element (primary & secondary) suitable for 600 KVA DG sets make- Cummins complete all as specified and directed. |
| 5 | S& F in replacment of V Belt for water pump suitable for 600 KVA DG sets make- Cummins complete all as specified and directed. |
| 6 | M & L for Servicing and repairing of 600 KVA DG Sets self starter complete all as specified and directed. |
| 7 | M & L for Servicing and repairing of 600 KVA DG Sets Oil pump complete all as specified and directed. |
| 8 | S & F in replacement of FIP Actuator for 600 KVA DG sets , Make-Cummins complete all as specified and directed. |
| 9 | M& L for calibration of Fuel Injection Pump (FIP)/ PT pump incl FIP repairing kit complete all specified and directed. |
| 10 | M& L for calibration of Fuel Injector incl Fuel Injector repairing kit complete all specified and directed. |
| 11 | S & F in replacement of Oil pressure sensor for 600 KVA DG sets , Make-Cummins complete all as specified and directed. |
| 12 | S & F in replacement of thermostat electronic sensor of Gen Set 600 KVA complete all as specified and directed. |
| 13 | S & F in replacement core of turbo charger Model No HE800FG Make of Holset for Gen Set 600 KVA complete all as specified and directed. |
| 14 | M & L for filling best quality engine oil 20W40 type including removing of old burnt engine oil from DG sets complete all as specified and directed . |
| 15 | M & L for filling best quality antifreezing, Inhabitor Corrosion (Coolant) liquid complete all as specified and directed. |
| 16 | Dismantling and opening of complete 600 KVA engine of DG set for inspection and replacing necessary worn out / defective parts including allinment, grinding, polising of engine housing and piston head, crank shaft and after fixing defective part assembling of DG set engine and testing, commissioning for its entire satisfactory performance complete all as specified and directed. SM No 003/067/PPUR/DG/25 & 26Note : Other defective parts if required replacement shall be measured and paid separetly as under (Engine Make : Cummins, Model : KTAP-19-C-12) |
| 17 | Lower engine gasket set as per sample |
| 18 | Head gasket set as per sample |
| 19 | Piston Ring Set complete as per sample |
| 20 | Piston as per existing make and sample |
| 21 | Cylinder liner as per sample |
| 22 | Cylinder liner O ring set |
| 23 | Connecting rod bearing upper and lower |
| 24 | Connecting rod as per sample |
| 25 | Valve inlet as per sample |
| 26 | Valve exhaust as per sample |
| 27 | Valve guide as per sample |
| 28 | Valve Oil seal as per sample |
| 29 | Rocker bush of suitable size |
| 30 | Engine Cooing nozzle |
| 31 | Valve retainer as per sample |
| 32 | Bypass engine oil pipe |
| 33 | Oil sump heater |
| 34 | Hose pipe for radiator as per sample |
| 35 | Fuel injector as per existing make and sample |
| 36 | Crank main bearing as per sample |
| 37 | Crank shaft seal as per sample |
| 38 | Crank shaft as per sample |
| 39 | M & L for servicing of 600 KVA DG Sets radiator assembly complete for cleaning, cooling water spaces, and replace unservicieable rubber hose, pipes, circlip, clamps, cleaning of radiator appropriate cleaning agent, de-scaling by means of scale solvent as well as neutralizing agent to arrest leakages by means of brazing etc. complete all as specified and directed.Note: These servicing includes necessary replacement of gaskets, sealing rings, cleaning agents etc complete all as specified and directed. |
| 40 | M & L for cleaning fuel tank both internally and externally by removing all the dust / sediments etc for DG Set of capacity 600 KVA DG Set complete all as specified and directed. |
| 41 | S& F testing Trivector Meter 3Ph, 4W TVM 240V ( L-N) 5 A Cl 0.5s, with CT ratio 100/5Amp , BM RS 485 Modbus incl suitable size copper wire from CT to meter compete all as specified and directed. Cat Part No WR300BC52RS of L& T or equivalaent make |
| 42 | Demolition of concrete in ground floors and pavings complete all as specified and directed. |
| 43 | M&L for PCC 1:2:4 type B-2 using 20mm graded stone aggregate as in coping of DG set foundation including necessary form work and fair finishing to exposed surface without using extra cement complete all as specified and directed. |
| 44 | M&L for PCC 1:3:6 type C-2 using 40mm graded stone aggregate as in foundation for DG set foudation pairing of floor/paths, fencing post road cuts etc including necessary form work and fair finshing to exposed surface without using extra cement complete all as specified and directed. |
| 45 | S& F in replacement 200 mm bore , MS ERW Pipe as per IS 3589: 2001 , light grade duly welded in multiple length with special fitting i.e bend , flange , etc for DG set exhaust pipe complete all as specified and directed. |
| 46 | M & L in replacement for making support for Eaxhust pipe by round, square pipe, angle iron sections made of Fe-290 (Gde E 165) including cutting, welding and polishing etc complete all as specified and directed. |
| 47 | S&F in replacement 3- layer PP-R ( Polypropylene random Polymer) pipe ISI marked, IS-15801, 65 mm SDR 7.4 (PN16) UV stabilized hot & cold PP-R pipe incl fusion joint, polypropylene random fittings laid in trenches /walls/ceilings or laying in floors complete all as specified and directed. |
| 48 | Deduct Schedule of Credit of as listed in Schedule 'A' Part-II. Contract Sum shall be arrived after deducting the credit amount.Note :- Tenderers will not quote against this item Please Enable Macros to View BoQ information |