| 1 | Dismantling cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). |
| 2 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in- charge within a distance of 60 meter (200 feet). |
| 3 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre leadas per direction of Engineer-in-Charge. |
| 4 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. |
| 5 | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M. morter in foundation and plinth and T&P etc all completed as per the direction of engineer - in - charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) |
| 6 | 12 mm thick plaster with cement and coarse sand of1.25 fineness modules in (1:4) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. (AS PER PWD SOR 2022 PAGE NO 36 SI NO 13.11 NEW ITEM ) |
| 7 | Providing wall putty on New surface with approved quality material of Berger/ J.K./Birla or similar make 2 coats.AS PER PWD SOR 2022 662 NEW ITEM |
| 8 | Finishing wall with weather coat by premium acrylic exterior paint applied @ 3.28 ltr/10 sqm (Asian or Berger Brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20kg/10 sqm after thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work..Same as item 661 but for weather coat Withpremium acrylic exterior paint (Asian or BergerBrand)AS PER PWD SOR 2022 662 NEW ITEM . |
| 9 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M.in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area. (Where machine con not reach/move) |
| 10 | S/S of 22.4 to 53mm gauge stone ballast with stacking for measurment etc. all complete as per the direction of Engineer in charge (AS PER PWD SOR 2020 RMR) |
| 11 | Supply of screening material with stacking for measurment 11 etc all complete as per the direction of engineer in-charge AS PER PWD SOR 2020 RMR |
| 12 | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2022 20.2.1 |
| 13 | Supply & laying 80 mm thick Precase cement concrete i-shape interlocking paver block (Grey color) with top layer of having plan dimension 200X(160+120mm) of O.P cement smoothing gloss finish, skid resistant manufacturered from rubber moulds through vibro-compression mechanism. the compressive strength of concrete paver block shall not be less than 30 mpa (M-30) and weight 5kg .per no. confirming to 15:15658-2006 including cost of material, labour,t&p etc. required for proper completion of the work as directed by Engineer -in-charge |
| 14 | S/L Tack coat of bitumen @ 0.30 kg/m2 including heating the VG 10 bitumen spraying the bitumen with mechanically operated sparay unit fitted on bitumen boiler & cleaning and prepairing the existing road surface etc all completed as per the direction of engineer - in - charge. (AS PER RMR) |
| 15 | Providing and laying dense graded bituminous macdam with HMP producing an average output of 75 tonnes per hour using crushed aggregates from approved quarry of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler,transporting the hot mix to work site,laying with a hydrostatic paver finisher to the required grade, level alignment,rolling with smooth wheeled. vibratory and tandem rollers to achieve the desired compaction (Ref. to Mort&HSpecification no. 507 ) Adjustment for bitumen shall be done as per job mix formula and e-in-c latter No 2651 Dt 27-07-12 for proper completion of work as per direction of engineer-in-cgarge including all labour,T&P,taxes , labour cess etc. complete. |
| 16 | Providing and laying bituminous concrete with HMP crushed aggregates from approved quarry of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent by weight of total mix and filler,transporting the hot mix to work site,laying with a hydrostatic paver finisher to the required grade, level alignment,rolling with smooth wheeled. vibratory and tandem rollers to achieve the desired compaction (Ref. to Mort&HSpecification no. 507 ) Adjustment for bitumen shall be done as per job mix formula and e-in-c latter No 2651 Dt 27-07-12 for proper completion of work as per direction of engineer-in-cgarge including all labour,T&P,taxes , labour cess etc. complete. |
| 17 | R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-incharge (cost of earth works in excavation, concrete worksin foundation to be paid separately).DSR- 2021 /16.15.1 |
| 18 | Welded steel wire fabric of required width having rectangular mesh painted with two or more coats of enamelpaint of approved shade over a coat of primer (Priming & Painting to be paid for separately)DSR-2021/16.16.2 |
| 19 | Cement Concrete with 2 cm. gauge stone grit instead of 4 cm. gauge stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. Required for proper completion of the work. |
| 20 | Desposal of refused material/malwa distance up to 8 km etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2020 /231( a). |
| 21 | Deduct of old Tiles |
| 22 | Deduct of old Bricks |
| 23 | Deduct of old B/Bats |
| 24 | Surface dressing ot the ground including removing vegetation and in-equalities not exceeding 15cm deep and disposal of rubbish, lead up to 50m and lift up to1.5m. All kinds of soil. |
| 25 | Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as perClause 408. |
| 26 | S/L of stone ballast 22.4 to 53 mm size with stacking for 10 measurment etc all complete as per the direction of engineer in-charge . AS PER PWD SOR 2020 RMR |
| 27 | Supply of screening material with stacking for measurment 11 etc all complete as per the direction of engineer in-charge AS PER PWD SOR 2020 RMR |
| 28 | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2022 20.2.1 |
| 29 | Supply & laying 80 mm thick Precase cement concrete i-shape interlocking paver block (Grey color) with top layer of having plan dimension 200X(160+120mm) of O.P cement smoothing gloss finish, skid resistant manufacturered from rubber moulds through vibro-compression mechanism. the compressive strength of concrete paver block shall not be less than 30 mpa (M-30) and weight 5kg .per no. confirming to 15:15658-2006 including cost of material, labour,t&p etc. required for proper completion of the work as directed by Engineer -in-charge |
| 30 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excludingcost of imported earth, sludge or manure). |
| 31 | Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). |
| 32 | Supplying and stacking sludge at site including royalty and carriage upto 5km lead complete (sludge measured in stacks will be reduced by 8% forpayment). 1:6 of Total Volume |
| 33 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) :1:8 of Total Volume Screened through sieve of I.S. designation 20 mm |
| 34 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge |
| 35 | Rough dressing the trenched ground including breaking clods. |
| 36 | Fine dressing the ground |
| 37 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately) |
| 38 | Uprooting weeds from the trenched area after 10 to 15 days after flooding with water including disposal of uprooted vegetation. |
| 39 | Cocopeat (blocks) for urban Forest |
| 40 | Rice husk for urban forest |
| 41 | Compost |
| 42 | Vermicompost |
| 43 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately).In rows 5 cm apart in both directions |
| 44 | Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts. |
| 45 | Providing & laying Selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in charge |
| 46 | Surface dressing ot the ground including removing vegetation and in-equalities not exceeding 15cm deep and disposal of rubbish, lead up to 50m and lift up to1.5m. All kinds of soil. |
| 47 | Excavation in foundation in cutting ordinary soil including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move).PWD SOR 2022 4.1.1 |
| 48 | Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as perClause 408. |
| 49 | S/L of stone ballast 22.4 to 53 mm size with stacking for 10 measurment etc all complete as per the direction of engineer in-charge . AS PER PWD SOR 2020 RMR |
| 50 | Supply of screening material with stacking for measurment 11 etc all complete as per the direction of engineer in-charge AS PER PWD SOR 2020 RMR |
| 51 | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2022 20.2.1 |
| 52 | Supply & laying 80 mm thick Precase cement concrete i-shape interlocking paver block (Grey color) with top layer of having plan dimension 200X(160+120mm) of O.P cement smoothing gloss finish, skid resistant manufacturered from rubber moulds through vibro-compression mechanism. the compressive strength of concrete paver block shall not be less than 30 mpa (M-30) and weight 5kg .per no. confirming to 15:15658-2006 including cost of material, labour,t&p etc. required for proper completion of the work as directed by Engineer -in-charge |
| 53 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface.Providing and laying of hot applied thermoplastic compound 2.5 mmthick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes. |
| 54 | Precasting and placing in position 125 mm dia Bollards 600 mm high of required shape including providing M.S. Pipe Sleeve 50 mm dia 300 mm long in the Bollard and M.S. Pipes 40 mm dia and 450 mm long with 150x150x6 mm M.S. plate welded at bottom and embedded 150 mm in cement concrete 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources), including necessary excavation of size 250x250x450 mm deep for the same in bitumen/concrete pavement at specified spacing. |
| 55 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 56 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC :67-2012 made of high intensity grade sheetingtype-IV vide clause 801.3, fixed over aluminium sheeting 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The Retro reflective sheeting shall be tested for a certificate of having the sheeting tested for coefficient of retro reflection, daytime colour and luminance, shrinkage, flexibility, liner removal, adhesion, impact resistance, specular gloss and fungus resistance, 3 years outdoor weathering and its having passed these tests shall be obtained from International/Government Laboratory/ Institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D 4956-09) on artificial accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer / Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of the sheeting as per IRC 67:2012. Legends , letters , numerals and borders etc should be as per MoRTH specification No-801.3.7 . P xi) |
| 57 | Supply, Installation, testing and Commissioning of smart solar streetlights, including galvanized MS poles, PV modules, Battery units, Smart LED luminaires with sensors, controllers, wiring, foundations and all nacessary accessories, complete as per specifications. |
| 58 | Providing, supplying, installation, testing and commissioning of aluminium profile LED lighting in gate profiling / architectural grooves, recessed or surface mounted as per approved drawings, complete with extruded aluminium profile, opal / frosted diffuser, integrated LED strip light (minimum 10–12 W per running metre), suitable LED driver, internal wiring up to nearest junction box, fixing accessories, cutting, finishing, concealment, testing and commissioning, complete in all respect. The profile lighting shall be weather resistant (minimum IP-65) and suitable for outdoor application. |
| 59 | GST Please Enable Macros to View BoQ information |