| 1 | fo|qr forj.k [k.M&lyseiqj ds vUrxZr fofHkUu LFkkuksa ij ttZj ,y0Vh0 ykbZu gksusa ds dkj.k blds LFkku ij ,0ch0 dscy ,oa iksy yxkdj ykbZu fuek.kZ djus dk dk;ZA |
| 2 | Safe loading, unloading and carriage of 8.5 M PCC Pole from departmental store to work site |
| 3 | Safe loading, unloading and carriage of 11 M PCC Pole from departmental store to work site |
| 4 | Safe loading, unloading and carriage of ACSR Weasel/Dog Conductor from departmental store to work site |
| 5 | Safe loading, unloading and carriage of XLPE Cable 185 sqmm from departmental store to work site |
| 6 | Safe loading, unloading, carriage, and installation of other line materials from departmental store to work site, complete in all respects as per site requirement. |
| 7 | Erection Of PCC Pole With All Accessories complete in all respects as per site requirement |
| 8 | Grouting of Pole |
| 9 | Earthing of Pole |
| 10 | Erection Of Stay with all Accessories |
| 11 | Grouting of Stay |
| 12 | Safe erection, stringing and sagging of ACSR Weasel/Dog Conductor, complete in all respects as per site requirement |
| 13 | Laying of XLPE Cable 185 sqmm, complete in all respects as per site requirement |
| 14 | SUPPLY AND INSTALLATION OF FOLLOWING MATERIALS: |
| 15 | Stone Pad |
| 16 | Nut and Bolts |
| 17 | F Bracket |
| 18 | Cross Arm Holding Clamp with Nut bolts |
| 19 | Clamp for stay |
| 20 | Stay Insulator |
| 21 | Dismantling of old materials (i.e., poles, transformers, conductors, AB cables, and other accessories) as per site requirements, and carriage from the work site to the Deoria store |
| 22 | fo|qr forj.k [k.M&lyseiqj ds vUrxZr fofHkUu LFkkuksa ij ttZj ,y0Vh0 ykbZu gksusa ds dkj.k blds LFkku ij ,0ch0 dscy ,oa iksy yxkdj ykbZu fuek.kZ djus dk dk;ZA |
| 23 | Safe loading, unloading and carriage of 8.5 M PCC Pole from departmental store to work site |
| 24 | Safe loading, unloading and carriage of ACSR Weasel/Dog Conductor from departmental store to work site |
| 25 | Safe loading, unloading and carriage of LT ABC (3x95+1x70+1x16) sqmm from departmental store to work site |
| 26 | Safe loading, unloading and carriage of LT ABC (3x120+1x95+1x16) sqmm from departmental store to work site |
| 27 | Safe loading, unloading and carriage of LT ABC (3x50+1x35+1x16) sqmm from departmental store to work site |
| 28 | Safe loading, unloading, carriage, and installation of other line materials from departmental store to work site, complete in all respects as per site requirement. |
| 29 | Erection Of PCC Pole With All Accessories complete in all respects as per site requirement |
| 30 | Grouting of Pole |
| 31 | Earthing of Pole |
| 32 | Erection Of Stay with all Accessories |
| 33 | Grouting of Stay |
| 34 | Safe erection, stringing and sagging of ACSR Weasel/Dog Conductor, complete in all respects as per site requirement |
| 35 | Safe erection, stringing and sagging of LT ABC (3x95+1x70+1x16) sqmm, complete in all respects as per site requirement |
| 36 | Safe erection, stringing and sagging of LT ABC (3x120+1x95+1x16) sqmm, complete in all respects as per site requirement |
| 37 | Safe erection, stringing and sagging of LT ABC (3x50+1x35+1x16) sqmm, complete in all respects as per site requirement |
| 38 | SUPPLY AND INSTALLATION OF FOLLOWING MATERIALS: |
| 39 | Stone Pad |
| 40 | Clamp for Distribution Box |
| 41 | Eye Hook |
| 42 | J Hook |
| 43 | LT Clamp with Nut Bolts |
| 44 | Lt Shckle Insulator |
| 45 | Nut bolts |
| 46 | Dismantling of old materials (i.e., poles, transformers, conductors, AB cables, and other accessories) as per site requirements, and carriage from the work site to the Deoria store |
| 47 | fo|qr forj.k [k.M lyseiqj esa 33@11 ds0oh0 fo|qr midsUn lyseiqj rglhy esa yxs budfeax ,oa vkmV xksbax] iSuy cnyus dk dk;ZA |
| 48 | Loading and carriage of outgoing V.C.B. & incoming V.C.B. with its all accessories from store center Deoria to 33/11 K.V. Sub station |
| 49 | Dismantling of old & used outgoing & incoming VCB. installed at 33/11 KV Sub Station and Sifting from control room outside of control room at 33/11 K.V. Sub station |
| 50 | Installation of new out going & incoming V.C.B. & its alignment with 11 KV Bus Bar Fixing and Fitting complete in all respect. |
| 51 | Old XLPE cable disconection from power T/f to incoming & out going V.C.B. panel than after jointing cable box reconection of power T/F to incomin & outgoing feeder & panel. |
| 52 | Loading, Unloding ,Carriage & Shifting of old & used V.C.B. with all accessories from 33/11 KV substation to Store center Deoria. |
| 53 | fo|qr forj.k [k.M lyseiqj esa 33@11 ds0oh0 fo|qr midsUn ykj esa yxs budfeax ,oa vkmV xksbax] iSuy cnyus dk dk;ZA |
| 54 | Loading and carriage of outgoing V.C.B. & incoming V.C.B. with its all accessories from store center Deoria to 33/11 K.V. Sub station |
| 55 | Dismantling of old & used outgoing & incoming VCB. installed at 33/11 KV Sub Station and Sifting from control room outside of control room at 33/11 K.V. Sub station |
| 56 | Installation of new out going & incoming V.C.B. & its alignment with 11 KV Bus Bar Fixing and Fitting complete in all respect. |
| 57 | Old XLPE cable disconection from power T/f to incoming & out going V.C.B. panel than after jointing cable box reconection of power T/F to incomin & outgoing feeder & panel. |
| 58 | Loading, Unloding ,Carriage & Shifting of old & used V.C.B. with all accessories from 33/11 KV substation to Store center Deoria. |
| 59 | fo|qr forj.k [k.M lyseiqj esa 33@11 ds0oh0 fo|qr midsUn HkVuh esa yxs budfeax ,oa vkmV xksbax] iSuy cnyus dk dk;ZA |
| 60 | Loading and carriage of outgoing V.C.B. & incoming V.C.B. with its all accessories from store center Deoria to 33/11 K.V. Sub station |
| 61 | Dismantling of old & used outgoing & incoming VCB. installed at 33/11 KV Sub Station and Sifting from control room outside of control room at 33/11 K.V. Sub station |
| 62 | Installation of new out going & incoming V.C.B. & its alignment with 11 KV Bus Bar Fixing and Fitting complete in all respect. |
| 63 | Old XLPE cable disconection from power T/f to incoming & out going V.C.B. panel than after jointing cable box reconection of power T/F to incomin & outgoing feeder & panel. |
| 64 | Loading, Unloding ,Carriage & Shifting of old & used V.C.B. with all accessories from 33/11 KV substation to Store center Deoria. Please Enable Macros to View BoQ information |