| 1 | Transportation of Rig Machine for Deep Boring |
| 2 | Erection of Rig Machine |
| 3 | Misc Work such as survey |
| 4 | Drilling of 250 mm dia bore in over burden by DTH method i/c all |
| 5 | Drilling of 150 mm dia bore in hard rock by DTH method i/c all |
| 6 | Supply and laying of 185 mm dia PVC heavy duty pipe (10 kg /cm2)i/c all |
| 7 | Flushing of T/W by 250 PSI compressor i/c all |
| 8 | Makin Chamber with cover including all |
| 9 | Supply and Insttalation of Submersible Pump set capalable to deliver a minimum discharge of 9000 liters per day at 90 mtr head AC Based submersible pump single phase 01 HP on Deep Bore well of size 150 mm with suitable size of anchor wire. |
| 10 | Auto ON-Off water level controller (make- Grudfoss/ l&T/ any standard make according to pump) suitable for DC incoming power supply, having connections for low and high float switches to cut the power while tank is full and start the motor automatically when tank is empty |
| 11 | Supply and Installation of solar PV multy crystalline pannel suitable to run the solar submersible pump (1 HP) not less than 900 watt sp as capable to deliver the 9000 LPD at 90m head including counting and necessary connection in series/ paraller as per requirement of voltage for the pump. |
| 12 | Supply and jointing of cable of submersible pump ,PVC multi straind,copper conductor cable ,PVC insulated and PVC sheathed with ISI marked , of 3 core flat 4 mm 2.6 meter/ as required |
| 13 | Supply Jointing and lowering of GI Pipe 30mm dis medium grade column pipe of size in 3m length upto and below the depth of water level and connecting of top with the help of 30mm dia GI Union to supply pipe. |
| 14 | Steel work welded in built up sections / framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. In grantings, frames, guard bar, ladder, railing, brackets, gates and similar works as per SI no. 10.25.2 |
| 15 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank of approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. DSR 18.48 |
| 16 | Providing and fixing Polyethelene-Aluminium-Polyethelene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers & connectors etc., with clamps at 1.00 metre spacing. This includes testing of joints complete as per direction of the Engineer-in-charge. DSR 18.1.3 |
| 17 | Supply and fixing of 30mm dia gun metal ball valve including all material labour and t&p etc required for proper completion of the work . |
| 18 | Supply and Fixing of Sign Board and Photography Please Enable Macros to View BoQ information |