| 1 | Excavation in foundation in ordinary soil( Loam,clay or sand) including lift up to 1.5 M,and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the plinth and removal and disposal of surplush earth as directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches (Where machine con not reach/move) For building work only,(Excluding royalty) |
| 2 | Cement Concrete with 4cm gauge approved Stone ballast coarse sand and cement in proporation of 12:6:1 inculuding supply of all materail labour and T&P etc.required for proper completion. |
| 3 | Cement Concrete with 4cm gauge approved stone ballast coarse sand and cement in proporation of 4:2:1 but with 2 cm gauge stone grit instead of 4cm gauge stone ballast including supply of all materials labour and T&P etc for proper completion of work. |
| 4 | R.C.C raft foundation work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:1.5:3 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. |
| 5 | R.C.C lighter beam having spans upto 6M work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:2:4 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. |
| 6 | supplying, fitting and placing un-coated HYSD bar Reinfrcement in foundation complete as per Drawing and Technical Specifications complete as per MORTH IInd Revision 2019 Specification 1600. |
| 7 | Mild steel of iron of samll size and section such as holding down bolts hold fast road,grathings etc of fabrication of hold fast nosing hold fast including bending for proper completion of the work |
| 8 | Providing & laying of 18mm thick Granite stone with 2cm thick 1:3 cement sand mortar i/c jiont filling with cement mixed with pigment including supply of all material,labour and T&P etc.required for proper completion of work |
| 9 | Providing edge moulding to 18 mm thick marble stone counters, Vanities etc., including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge. |
| 10 | Stone work plain ashlar in arches in super structure upto floor V level incement mortar 1:3 (1 cement : 3 coarse sand) including centering,shuttering and pointing with white cement mortar 1:2 (1 white cement :2 stone dust) with an admixture of pigment matching the stone shade. |
| 11 | Applying two coat enaimel paint over one coat primer including supply of all material ,labour and T&P etc.required for proper completion of work |
| 12 | Add Internal & External Electrical Fittings 12.50%@ |
| 13 | Add Say amount Please Enable Macros to View BoQ information |