|
| 1 | Cleaning of drainage up to Silt at site with disposal of 60mtr. Including waste making diversion etc....allcompDrain |
| 2 | Dismantling of cement concrete or brick or granolithic floors, including base concrete & including stacking of dismantled materials as directed. By the Engineer-in-charge within a distance of 60 mt. (200 ft.)....all complete of works.non shedule item 01 Considering 70% |
| 3 | Dismantling of old interlooking. Soling bricks including stacking of dismantled material as per directed by Engineer-in charge within distance of 60 m etc....all complete of works.non shedule item 01 Considering 80% |
| 4 | Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 m.As Per P.W.D No 694 Considering 50% |
| 5 | Dismentling of brick work in lime or cement mortar and ineluding staking of materials as directed by E/I/C within a distance of 60m ....P.W.D. SI. No. 692Considering 70% |
| 6 | E/W in excavation in soil mixed with Moorum/shingle/kankar requiring the use of special T&P such as pickaxe, subals etc. (Excluding Royalty). As Per P.W.D No 251 |
| 7 | Cartage/ Disposal of surplus malva /silt up to 3 km distance from site.... All comp (Less loading charge SI No. 231-(A5)Tacken item no. 2 |
| 8 | Earthwork in filling in ordinary soil, upto 5.0 km cartage including lift upto 1.50 m & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 m from the foundation trenches, item no 253) |
| 9 | P/L concrete with 4 cm gauge brick ballast, fine sand of 1.25 F.M. and cement in the proportion of 12:6:1 in foundation and under floor including supply of all M/L and T&P etc required for proper completion of the work.item no 273 |
| 10 | First class brick work in 1:4 cement and course sand mortar in foundation and plinth including supply of all labour & material and T/P etc. required for proper completion of the work. Item no 305 |
| 11 | 12 mm thick plaster with cement & fine sand mortar in 1:4 i/c supply of all labour & material and T/P etc.required for proper completion of the work item. No 584 |
| 12 | Supply, Laying & consolidation of 22.4-53 mm gauge stone ballast and screening material by hand rammer.....All complete. |
| 13 | R.C.C. work with cement approved course sand and 2cm(3/4\\") gauge approved stone ballast in proportion of 1:1.5:3 for Slab work etc.. All comp as per P.W.D. schedule item no. 284A |
| 14 | Mild steel or iron work in plain work such as reinforcement concrete work wrought to required shape as necessary for proper completion of the work. item no 504 |
| 15 | P/L cement concrete 4:2:1 with 20mm stone aggregate,c-sand and cement etc...all compAs per P.W.D. schedule item no 279(i) 215.50+110.80 |
| 16 | Deduct cost of old Brick ballast obtained from dismantling etc all comp… |
| 17 | S/F of granite stone indication board in brick Masonary padastal etc.(1Job) |
| 18 | Deduction 5% As per government G.O Please Enable Macros to View BoQ information |