| 1 | Carriage of following materials from Elec. Store Center Unnao to work dump site along with loading unloading and propoer stocking. Distance 0-70 Km. |
| 2 | PCC/ST Pole of diff. size |
| 3 | ACSR Weasel Conductor |
| 4 | ABC conductor Three Phase of size 3x50/3x95/3x120 sq mm |
| 5 | L.T. Cable 1x400/1x120/3.5X70/1x240/3.5x400 sq mm |
| 6 | 3-Phase LT Distribution Box |
| 7 | Other loose line materials including GI/stay wire, Single and double Pole accessories, complete stay & earthing, insulator, x-arm, jointing kit etc. |
| 8 | Carriage of following Transformer from Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking. |
| 9 | T/F 25 KVA 11/0.4 KV |
| 10 | T/F100 KVA 11/0.4 KV |
| 11 | T/F 250 KVA 11/0.4 KV |
| 12 | Mounting of following Transformer on double pole including its cartage and dragging from dump site to pit site. |
| 13 | T/F 25 KVA 11/0.4 KV |
| 14 | T/F100 KVA 11/0.4 KV |
| 15 | Placement of 11/0.433 KV Distribution Transformer from dump site to newly constructed T/F plinth and Installation cable termenation and commissioning of 250 KVA Transformer including drassing damaged cable, lugs ,Jumpering & connecting Earthing of body & neutral as per required. ( required mattrial as lugs, flat copper L plate, nuts & bolts etc for above job shall be provided by contractor) |
| 16 | Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.5 x 1.5 x1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth/side condition. |
| 17 | Fabrication and erection of Distribution Transformer fencing of frame size 3x2.4 Mtr. Including cost of M.S. Angle size 35x35x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10SWG wire fabric, including Painting of two coats of paint in iron based surfaces with ready mixed paint to give bus green shade including cleaning of oil & dust. |
| 18 | New Bore Type Earthing for Distribution transformers/Control Pannel one neutral and one for body of transformer 40 ft.deep GI pipe of size 40 mm. making all arrangements for its recharging funnel with openable cover of steel chequered plate with hinges and making connections to transformer neutral/body by GI strip of size 25x5 mm after complete running welding and connecting with pipes by clamps/nut bolts and welding. |
| 19 | Providing & fixing of Stay clamps/ LT Clamps for PCC/ST pole with Nuts & Bolts. |
| 20 | Erection of Single pole including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 21 | Erection of double pole including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site. |
| 22 | Grouting of PCC/ST Pole as per RESPO Norms with grouting materials. |
| 23 | Earthing of pole as per RESPO Norms. |
| 24 | Digging of pits, fixing nuzzling and grouting of stay set as per RESPO Norms with grouting materials. |
| 25 | Laying stringing and sagging of 11 HT Lines by ACSR weaseal conductor including all associated work with joint/jumpers and binding of insulator as required. |
| 26 | Laying stringing and sagging of aerial bunched cable including all fittings on erected PCC/ST Pole of size 3x50/3x95/3x120 sq mm |
| 27 | providing and fixing of LT SACKLE INSULATOR |
| 28 | Fixing of 11 KV disc insulator with disc fitting |
| 29 | Fixing of 11 KV Three Phase D.O. Fuse set ( with M.S. Channel with clamp) |
| 30 | Fixing of Danger board with clamp |
| 31 | Providing &fixing of top channel |
| 32 | Providing & fixing of Holding clamps for PCC/ST pole with Nuts & Bolts. |
| 33 | Providing & fixing of dropper channel |
| 34 | Providing and fixing of F BRACKET |
| 35 | providing & fixing of al. lugs |
| 36 | Fixing of L.T. cable 1x400/3.5X400 sq mm |
| 37 | Fixing of G.I barbed wire Please Enable Macros to View BoQ information |