| 1 | STRENGTHENING OF 11 KV LINE WORK |
| 2 | Safe Carriage of Following line materials for 11 KV Line from Store Center to the actual site of work including measuring, weighing,Safe loading, unloading at both ends and proper stacking at site.(ALL DECENTRALISED MATERIAL (SUCH AS AL. LUGS, GROUTING MATERIAL, FENCING MATERIAL)WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR. |
| 3 | 11 KV VCB FOR O/G CTR 33/150/ SA 350 MVA /1250A) |
| 4 | 11 KV VCB FOR I/c CTR 33/150/ SA 350 MVA /1250A) |
| 5 | PCC POLE SUPPORT 8.5 MTR LONG |
| 6 | PCC POLE SUPPORT 9 MTR |
| 7 | 11 KV X-ARM V-TYPE |
| 8 | 11 KV M.S T-OFF CHANNEL |
| 9 | TOP CHANNEL 125*65*2240 MM |
| 10 | 11 KV DISC INSULLATOR COMPOSITE |
| 11 | 11 KV PIN INSULLATOR |
| 12 | STAY COMPLETE (STAY ROD 16*1800 MM WIRE 5 KG CLAMP BOLT WITH NUT WITH GROUTING) |
| 13 | G.I WIRE 6 SWG |
| 14 | ACSR RABBIT CONDUCTOR |
| 15 | EARTHING CLAMP, (ROD 20*2500 MM, 6 SWG) G.I WIRE ETC |
| 16 | 11 KV XLPE CABLE 3*185 SQMM |
| 17 | CABLE JOINTING KIT 3*185 SQMM |
| 18 | 63 KVA TRANSFORMER |
| 19 | L.T CABLE 3.5x70 SQMM |
| 20 | 11 KV COMPOSITE PIN INSULLATOR |
| 21 | NEW 250 KVA 11 /0.430 KVA 3 PHASE T/F |
| 22 | L.T CABLE 1x240 SQMM |
| 23 | ABC CABLE (3*120+1*95+1*16) SQMM |
| 24 | 3 PHASE DISTRIBUTION BOX |
| 25 | 33 KV VCB |
| 26 | 33 C.T 200/100/1 |
| 27 | LIGHTENING ARRESTOR 33 KV |
| 28 | 33 KV FUSE SET |
| 29 | BATTERY SET 24 BOLT |
| 30 | Laying/Installation work inlcuding all the works as per RESPO/UPPCL Guidelines(All decentralized material will be provided by the contractor) |
| 31 | LOOSING/UNMOUNTING OF OLD 100 KVA TRANSFORMER |
| 32 | MOUNTING/UNMOUNTING ON NEWLY CONSTRUCTED PLINTH OF 250 KV TRANSFORMER WITH ALL NECESSARY CONNECTION (COMPLETE JOB) |
| 33 | MOUNTING/UNMOUNTING OF 63 KV TRANSFORMER WITH ALL NECESSARY CONNECTION (COMPLETE JOB) |
| 34 | RECEIVED BACK OF OLD UNUSED TRANSFORMER OTHER LINE MATERIAL FROM SITE TO CENTER STORE |
| 35 | 11 KV F-CLAMP WITH NUT AND BOLT |
| 36 | X-ARM HOLDING CLAMP WITH NUT BOLT |
| 37 | STONE PAD 300*300*75 MM |
| 38 | DANGER BOARD WITH CLAMP |
| 39 | BARDED WIRE |
| 40 | CONCREATING OF POLE, (263 CU, M INCH ) |
| 41 | STAY INSULLATOR |
| 42 | FABRICATION OF 11 KV FUSE SET INSTALLED ON MIDWAY |
| 43 | HOLDING CLAMP FOR MS. CHANNEL |
| 44 | AL LUG FOR 70 SQMM CABLE |
| 45 | AL LUG FOR 240 SQMM CABLE |
| 46 | DISTRIBUTION BOX CLAMP |
| 47 | PIERCING CONNECTOR |
| 48 | I HOOCK |
| 49 | SUSPENSION CLAMP |
| 50 | DEAD END CLAMP |
| 51 | FENCING OF 250 KVA T/F |
| 52 | PIPE EARTHING |
| 53 | L.T TAIL LESS UNIT |
| 54 | PLINTH OF 250 KVA T/F |
| 55 | ERRECTION OF DOUBLE POLE STRUCTURE WITH ALL NECESSARY FITTINGS |
| 56 | MASTER RELAY |
| 57 | VACCUM INTERRUPTOR |
| 58 | CABLE LAYING BY DIGGING / DERILLING |
| 59 | PROVIDING AND LAYING OF G.I PIPE 6\\" DIA AS PER THE METHOD INSTRUCTED BY EE/SDO/JE |
| 60 | CONCRETING OF STAY |
| 61 | TRIPPING/CLOSING COIL |
| 62 | SPRING CHARGING MOTOR FOR 11 KV VCB WITH COMPLETE FITTING |
| 63 | 11 KV VCB FOR O/G CTR 33/150/ SA 350 MVA /1250A) |
| 64 | 11 KV VCB FOR I/c CTR 33/150/ SA 350 MVA /1250A) |
| 65 | ERRECTION OF PCC POLE SUPPORT 8.5 MTR LONG |
| 66 | ERRECTION OF PCC POLE SUPPORT 9 MTR |
| 67 | 11 KV X-ARM V-TYPE |
| 68 | 11 KV M.S T-OFF CHANNEL |
| 69 | TOP CHANNEL 125*65*2240 MM |
| 70 | 11 KV DISC INSULLATOR COMPOSITE |
| 71 | 11 KV PIN INSULLATOR |
| 72 | STAY COMPLETE (STAY ROD 16*1800 MM WIRE 5 KG CLAMP BOLT WITH NUT WITH GROUTING) |
| 73 | G.I WIRE 6 SWG |
| 74 | ACSR RABBIT CONDUCTOR |
| 75 | EARTHING CLAMP, (ROD 20*2500 MM, 6 SWG) G.I WIRE ETC |
| 76 | 11 KV XLPE CABLE 3*185 SQMM |
| 77 | CABLE JOINTING KIT 3*185 SQMM |
| 78 | 63 KVA TRANSFORMER |
| 79 | L.T CABLE 3.5x70 SQMM |
| 80 | 11 KV COMPOSITE PIN INSULLATOR |
| 81 | NEW 250 KVA 11 /0.430 KVA 3 PHASE T/F |
| 82 | L.T CABLE 1x240 SQMM |
| 83 | ABC CABLE (3*120+1*95+1*16) SQMM |
| 84 | 3 PHASE DISTRIBUTION BOX |
| 85 | 33 KV VCB |
| 86 | 33 C.T 200/100/1 |
| 87 | LIGHTENING ARRESTOR 33 KV |
| 88 | 33 KV FUSE SET |
| 89 | BATTERY SET 24 BOLT Please Enable Macros to View BoQ information |