| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out th |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 Cement : 5 fine sand derived from natural sources : 10 graded stone aggregate 40 mm nominal size d |
| 3 | Construction of subgrade with material obtained from borrow pits for local earth construction of embankment with approved material obtained from abailable land and permitted and approved by Engineer in charge and as per technical specification clause 301. |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the |
| 5 | Centering and shuttering including stutting, propping etc. and removal of form for Columns, pillars, piers, abutments, posts and struts. As per DSR Code No- 5.9.6 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the |
| 7 | Steel reinforcement for R.C.C. work ready to use \\"cut and bend\\" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete in Thermo-Mechanically Treated bars of grade Fe-500D or more. As per |
| 8 | Providing and laying of 2.5 cm thick p.c.c 1:2:4 (without base concrete) with cement coarse sand and 20 mm gauge stone grite including all ISI No 601A |
| 9 | Suppply and fixing of sign board I/C all. |
| 10 | As per Order of Joint Secretary G.O. No. G-1877 Dated 21-02-2025 and Director cum-chief Engineer U.P. RED, Lucknow Latter No 801 Dated 03-03-2025 Deduction 5% for Comptetive Price Effciency Please Enable Macros to View BoQ information |