| 1 | Supply and Errection of Decentralised materials given by Contractor .Note- Consumable Material (nut&bolt&clamp) which is given by contractor. |
| 2 | Stone Pad 300x300x75mm |
| 3 | LT pole clamp with nut and bolt for PCC pole |
| 4 | Earth wire clamp for PCC pole |
| 5 | Suspension clamp |
| 6 | I Hook |
| 7 | Dead end clamp |
| 8 | LT piercing connector 120sqmm |
| 9 | LT piercing connector 50sqmm |
| 10 | Connecting lead 1x16 sqmm |
| 11 | 33kv cross arm holding clamp |
| 12 | Danger board |
| 13 | Barbed Wired |
| 14 | Nut bolt and washer(diff. size) |
| 15 | Alluminium paint |
| 16 | Red oxide paint |
| 17 | ERECTION OF WORK Note:- All Centralised Materials will be provided by Department at Store. |
| 18 | Carriage of 8.5m PCC Pole from store to site (Accroding to Estimate) with lodding and unlodding. |
| 19 | Errection of 8.5m PCC Pole with all fitting as per respo Norms. |
| 20 | Carriage of STP Pole 13 mtr long from store to site (Accroding to Estimate) with lodding and unlodding. |
| 21 | Errection of STP Pole 13 mtr long with all fitting as per respo Norms. |
| 22 | Carriage of LT ABC Cable (3x50+1x35+1x16) sqmm from store to site (Accroding to Estimate) with lodding and unlodding. |
| 23 | Errection of LT ABC Cable (3x50+1x35+1x16)sqmm with all fitting as per respo Norms. |
| 24 | Carriage of LT ABC Cable (3x95+1x70+1x16) sqmm from store to site (Accroding to Estimate) with lodding and unlodding. |
| 25 | Errection of LT ABC Cable (3x95+1x70+1x16)sqmm with all fitting as per respo Norms. |
| 26 | Carriage of LT ABC Cable (3x120+1x95+1x16) sqmm from store to site (Accroding to Estimate) with lodding and unlodding. |
| 27 | Errection of LT ABC Cable (3x120+1x95+1x16)sqmm with all fitting as per respo Norms. |
| 28 | Carriage of Extra for stays at angle location (stay rod 16x1800mm, stay wire 5 kg, stay clamp, bolt and nuts) from store to site (Accroding to Estimate) with lodding and unlodding. |
| 29 | Errection of Extra for stays at angle location (stay rod 16x1800mm, stay wire 5 kg, stay clamp, bolt and nuts) with all fitting as per respo Norms |
| 30 | Carriage of Earthing of pole by MS earthing rod 20x2500mm and 6SWG earthing wire etc store to site (Accroding to Estimate) with lodding and unlodding. |
| 31 | Errection of Earthing of pole by MS earthing rod 20x2500mm and 6SWG earthing wire etc with all fitting as per respo Norms |
| 32 | Carriage of LT distribution Box from store to site (Accroding to Estimate) with lodding and unlodding. |
| 33 | Errection of LT distribution Box with all fitting as per respo Norms. |
| 34 | Carriage of 33 kv XLPE cable 3x300 cable from store to site (Accroding to Estimate) with lodding and unlodding. |
| 35 | Errection of 33 kv XLPE cable 3x300 cable with all fitting as per respo Norms.(overhead) |
| 36 | Carriage of 33 kv outdoor cable box 3x300 from store to site (Accroding to Estimate) with lodding and unlodding. |
| 37 | Errection 33 kv outdoor cable box 3x300 with all fitting as per respo Norms. |
| 38 | Carriage of 33 kv stay set complete from store to site (Accroding to Estimate) with lodding and unlodding. |
| 39 | Errection of 33 kv stay set complete with all fitting as per respo Norms. |
| 40 | Carriage of 33 kv V type cross arm from store to site (Accroding to Estimate) with lodding and unlodding. |
| 41 | Errection of 33 kv V type cross arm with all fitting as per respo Norms |
| 42 | Carriage of Earthing complete from store to site (Accroding to Estimate) with lodding and unlodding. |
| 43 | Errection of Earthing complete with all fitting as per respo Norms |
| 44 | Carriage of 33 kv Line isolator from store to site (Accroding to Estimate) with lodding and unlodding. |
| 45 | Errection of 33 kv Line isolator with all fitting as per respo Norms |
| 46 | receive back of scrap material as per estimate |
| 47 | Concreting/Grouting of PCC/STP Pole as per respo Norms. (0.268cu.m.each) |
| 48 | Concreting/Grouting of stay as per respo Norms (0.268cu.m.each) Please Enable Macros to View BoQ information |