| 1 | PART-A |
| 2 | STRENGTHENING OF 11 KV LINE WORK |
| 3 | Safe Carriage of Following line materials for 11 KV Line from Store Center to the actual site of work including measuring, weighing,Safe loading, unloading at both ends and proper stacking at site.(ALL DECENTRALISED MATERIAL (SUCH AS AL. LUGS, GROUTING MATERIAL, FENCING MATERIAL)WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR. |
| 4 | PCC Pole 8.5 mtr long |
| 5 | ACR rabit conductor |
| 6 | 11 KV V-type Cross arm |
| 7 | F clamp |
| 8 | 11 KV Disc insulator |
| 9 | 11 KV 3*185 sqmm XLPE Cable |
| 10 | Stay Set (16*1800) |
| 11 | 11 KV 3*185 sqmm XLPE Cable O/D joint kit |
| 12 | 11 KV pin insulator |
| 13 | PCC Pole 11 mtr long |
| 14 | ABC Cable 3*50+1*35+1*16 SQMM |
| 15 | GI wire 10 SWG |
| 16 | Earthing set complete |
| 17 | Laying/Installation work inlcuding all the works as per RESPO/UPPCL Guidelines(All decentralized material will be provided by the contractor) |
| 18 | MS Channel(Dropper) |
| 19 | T off Channel |
| 20 | F clamp |
| 21 | holding clamp |
| 22 | MS Top Channel (125*65*2240 mm) |
| 23 | MS channel (125*65*1300 mm) (Toff) |
| 24 | Stone pad(300*300*75 mm) |
| 25 | MS Nuts and bolts of different sized |
| 26 | Guarding angle (65*65*1600 mm) |
| 27 | Danger board with clamp |
| 28 | concreting of poles |
| 29 | Number plate with clamp |
| 30 | HDPE pipe 120 mm dia as per the method instructed by EE/SDO/JE |
| 31 | CABLE HOSTING |
| 32 | ERRECTION OF PCC Pole 8.5 mtr long WITH ALL NECESSARY FITTINGS |
| 33 | ACR rabit conductor |
| 34 | 11 KV V-type Cross arm |
| 35 | F clamp |
| 36 | 11 KV Disc insulator |
| 37 | 11 KV 3*185 sqmm XLPE Cable |
| 38 | Stay Set (16*1800) |
| 39 | 11 KV 3*185 sqmm XLPE Cable O/D joint kit |
| 40 | 11 KV pin insulator |
| 41 | Errection of PCC Pole 11 mtr long with all necessary fittings |
| 42 | ABC Cable 3*50+1*35+1*16 SQMM |
| 43 | GI wire 10 SWG |
| 44 | Earthing set complete |
| 45 | PART-B |
| 46 | DT increasing capacity and NEW Point |
| 47 | Safe Carriage of Following line materials for 11 KV Line from Store Center to the actual site of work including measuring, weighing,Safe loading, unloading at both ends and proper stacking at site.(ALL DECENTRALISED MATERIAL (SUCH AS AL. LUGS, GROUTING MATERIAL, FENCING MATERIAL)WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR. |
| 48 | 11/0.4 KV T/F 100 KVA (old n used) |
| 49 | 11 kv composite pin insulator |
| 50 | 11 KV Disc insulator |
| 51 | PCC Pole support 8.5 mtr long |
| 52 | ACSR weasel conductor |
| 53 | LT Lead LT XLPE Cable |
| 54 | Stay set complete |
| 55 | Earthing set complete |
| 56 | ABC cable (3*120+1*95+1*16) |
| 57 | 3 phase distribution box |
| 58 | 11 KV X arm |
| 59 | Laying/Installation work inlcuding all the works as per RESPO/UPPCL Guidelines(All decentralized material will be provided by the contractor) |
| 60 | LT fuse set protection unit for 100 KVA tf with SMC box |
| 61 | LT fuse set protection unit for 63 KVA tf with SMC box |
| 62 | Danger board with clamps |
| 63 | LT PVC Cable 3.5*150/70 SQ MM |
| 64 | LT PVC Cable 3.5*70/35 SQ MM |
| 65 | Earthing complete job |
| 66 | Installation of 11/0.4 KV T/F 100 KVA (old n used) complete job including mounting/unmounting and loosing and unloosing of all the connections |
| 67 | Installation of 11/0.4 KV T/F 63 KVA (old n used) complete job including mounting/unmounting and loosing and unloosing of all the connections |
| 68 | Installation of 11/0.4 KV T/F 250 KVA complete job including mounting/unmounting and loosing and unloosing of all the connections with removing of old 100 KVA Transformer |
| 69 | received back carriage of old transformer and other line items from site to store |
| 70 | LT Cable 3.5*150 SQMM |
| 71 | 11 kv composite pin insulator |
| 72 | holding clamps for ms channel |
| 73 | ALL lugs for 150 sqmm cable |
| 74 | fabrication of 11 kc fuse set on dobule pole structure(Complete job) |
| 75 | 250 KVA Transformer |
| 76 | LT Cable 1*400 sqmm |
| 77 | 3 phase DO fuse set |
| 78 | LT AB Cable (3*95+1*70+1*16) SQMM |
| 79 | AL lugs for 400 SQMM cable |
| 80 | making of new plinth for 250 KVA Tranformer as per RESPO standard and uppcl guidelines including complete job |
| 81 | Pipe earthing |
| 82 | Fencing of transformer as per the RESPO standard and uppcl guidelines including complete job |
| 83 | Tail less unit with complete job |
| 84 | Copper L-piece 62*22*12 mm |
| 85 | Henely type tailless unit for 250 KVA |
| 86 | 11 KV TPMO |
| 87 | 11 KV Fuse set |
| 88 | Earthing set complete |
| 89 | 11 KV Disc insulator |
| 90 | stay set 16*1800 |
| 91 | 11/0.4 KV T/F 100 KVA (old n used) |
| 92 | 11 kv composite pin insulator |
| 93 | 11 KV Disc insulator |
| 94 | PCC Pole support 8.5 mtr long |
| 95 | ACSR weasel conductor |
| 96 | LT Lead LT XLPE Cable |
| 97 | Stay set complete |
| 98 | Earthing set complete |
| 99 | ABC cable (3*120+1*95+1*16) |
| 100 | 3 phase distribution box |
| 101 | 11 KV X arm |
| 102 | PART-C |
| 103 | STRENGTHENING OF LT LINE WORK |
| 104 | Safe Carriage of Following line materials for 11 KV Line from Store Center to the actual site of work including measuring, weighing,Safe loading, unloading at both ends and proper stacking at site.(ALL DECENTRALISED MATERIAL (SUCH AS AL. LUGS, GROUTING MATERIAL, FENCING MATERIAL)WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR. |
| 105 | PCC Pole 8.5 meter Long |
| 106 | LT AB cable (3*120+1*95+1*36) SQMM |
| 107 | LT AB cable (3*95+1*70+1*16) SQMM |
| 108 | LT AB cable (3*50+1*35+1*16) SQMM |
| 109 | Earthing set complete |
| 110 | Stay set |
| 111 | Stay wire |
| 112 | 3 phase distribution box |
| 113 | Laying/Installation work inlcuding all the works as per RESPO/UPPCL Guidelines(All decentralized material will be provided by the contractor) |
| 114 | Nut n bolt with washer |
| 115 | Stone pad |
| 116 | Distribution box clamp |
| 117 | Piercing connector |
| 118 | Suspension clamp |
| 119 | Dead end clmaps |
| 120 | Concreting of stay |
| 121 | Stay insulator |
| 122 | Concreting of pole |
| 123 | errection of PCC Pole 8.5 meter Long |
| 124 | LT AB cable (3*120+1*95+1*36) SQMM |
| 125 | LT AB cable (3*95+1*70+1*16) SQMM |
| 126 | LT AB cable (3*50+1*35+1*16) SQMM |
| 127 | Earthing set complete |
| 128 | Stay set |
| 129 | Stay wire |
| 130 | 3 phase distribution box Please Enable Macros to View BoQ information |