| 1 | Construction of 33 KV Underground line from 132 KV Minto Park Sub Station to 33 KV Meyo Hall and 132 KV Minto Park Sub Station to 33 KV Civil LIne Sub Station. |
| 2 | Cartage of 11 Mtr STP from Store to dump store/work Site Including loading and unloading |
| 3 | Cartage of 33 KV, 3x300 sq mm XLPE cable from Store to dump store/work Site Including loading and unloading |
| 4 | Cartage of others Line Material as Earthing Road and Stay Rod set , GI Wire, Stay Wire etc. from Store to dump store/work Site Including loading and unloading |
| 5 | Fixing & grouting of stay rod with cement, sand and bricks ballast in ratio 1:4:8 and fastening the stay wire with pole and stay rod nuzzling (All require materials as Stay Clamp, Loop Insulator Bolt & nut and grouting material will be arranged by the contractor except Stay rod 16X1800 mm, Stay wire ) |
| 6 | Erection of 11 Mtr double pole support with fixing of necessary clamps, Cross Bracing angle and other accessories like channel, insulator etc.(As per RESSPO) All material provided by contractor except 11 M Long ST Pole. |
| 7 | Grouting of ST Pole, grouting in ratio 1:4:8, cement, stone grit & coarse sand, plinthing of support of size 0.4x0.45x0.3 Mtr. with cement sand& bricks blast in ratio 1:4:8 and 12 mm thick plastering around the plinth in ration 1:2:4 with 12 mm thickness curing of plinth should be done properly. (as per RESSPO) All material provided by contractor. |
| 8 | Earthing of support complete with the help of M.S. rod 20 mm dia and 2.54 Mtr. long, fastening of G.I. wire with clamps/X-arm/support to M.S. earth rod. As per RESSPO and Electrical safety rules. All material provided by contractor except Earthing Rod & G I Wire. |
| 9 | Laying of 33 KV 3x300 sq mm XLPE cable by machine drilling method. The cable shall be laid at the depth of 1050 mm from the surface of road including cartage. The cable shall be laid strictly in compliance to RESSPO Norms. |
| 10 | Drilling in cross the Railway Track 2 places , 1050 mm bellow or as per Railway clearence from the surface for laying of 8'' GI Pipe and laying of 33 KV.3x300 sq m.m XLPE cable in 8'' dia GI Pipe including cartage. All material proved by Contractor as GI Pipe except 33 KV Cable) |
| 11 | Laying of 33 KV 3x300 sq mm XLPE cable by manual method. The cable shall be laid at the depth of 1050 mm from the surface with the help of sand, brick & patiya of road including cartage. The cable shall be laid strictly in compliance to RESSPO Norms. (All required material except 33 KV cable provided by Contractor) |
| 12 | Laying of 33 KV 3x300 sq mm XLPE cable by manual buggi method. The cable shall be laid at the depth of 1050 mm from the surface of road including cartage. The cable shall be laid strictly in compliance to RESSPO Norms. (All required material except 33 KV provided by Contractor) |
| 13 | Drilling in all horizontally to cross the road/parallel to road, 1050 mm bellow from the surface for laying of HDPE Pipe and laying of 33 KV.3x300 sq m.m XLPE cable in 8'' dia HDPE Pipe including cartage. All material proved by Contractor as HDPE Pipe except 33 KV Cable) |
| 14 | Fixing of jointing kit Heat Shrink cable type end Terminations suitable for 33 KV, 3x300 sq mm XLPE cable. (As per RESSPO and Electrical Safety rule) including jointing kit. All material proved by Contractor as jointing kit |
| 15 | Outdoor/indoor jointing kit |
| 16 | Straight through jointing kit |
| 17 | Hoisting of 33 KV 3x300 sq mm XLPE cable providing GI pipe of size 6” dia 3 M long on double pole including its jumpering, complete with Channel and clamps, nut & bolts. As per RESSPO and Electrical safety rules. (All material provided by contractor except cable) |
| 18 | Painting of 11 ST Pole with Clamp and Channel 1 coat Red Oxide and 2 coat Aluminum Paint. |
| 19 | Tracing of Public Utility i.e. power cable, OFC, Ciwer/Water pipe line etc. |
| 20 | Supply & Fixing of marking stone for 33 KV U/G Line |
| 21 | Installation of Sign board at site after completed of work Sign board size 3x4 feet with stand writing material and sign board design will be provided by department and sign board, stand and grouting materials provided by contractor. Sing board will be provided by contactor as per sample provided by department. |
| 22 | Photo and Videography of before and after of the work will be provided by the contractor in soft & hard colored copy ( size 8x10\\" album ) and soft copy video in minimum 1080 P quality in pen drive in 3 set. |
| 23 | Restoration Charges of existing utilities |
| 24 | Telephone, Water Pipe Line, Sever Line etc. |
| 25 | LT/HT Line Please Enable Macros to View BoQ information |