| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 2 | Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : bituminous road |
| 3 | Cutting road and making good the same i/c supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required of bituminous portion. |
| 4 | Cutting road and making good the same i/c supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required of water wound macadam. |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavater) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as we as 10 sqm on plan) including getting out and disposal of exavated earth, lead upto 50 and lift upto 1.5m, as directed by Engineer-in-charge. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavating only after getting permission of Engineer-in-Charge. All kinds of soil. |
| 6 | Extra for every additional lift of 1.5 or part thereof in excavation / banking excavated or stacked materials. all kind of soil. |
| 7 | 1.50 - 3.00 m |
| 8 | 3.00 - 4.50 m |
| 9 | 4.50 - 6.00 m |
| 10 | Centring and shuttering i/c strutting, propping etc. and removal of form for…. Foundation, footings, bases of columns etc. for mass concrete. |
| 11 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) |
| 12 | P/L 400mm dia Non-Pressure NP-3 Class RCC spigot socketed pipe confirming to IS:458:2003 with latest amendment laying in true alignment & position on craddle including with rubber ring (confirming to IS : 5382 with latest amendment) testing of laid pipe as per direction of Engineer incharge complete in all respect. |
| 13 | Constructing brick masonry circular manhole 1.52 m internal dia at bottom and 0.56 m dia at top in cement mortar 1:4 (1 cement : 4 coarse sand) inside cement plaster 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement, foundation concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and making necessary channel in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement, all complete as per standard design : 2.30 m deep with SFRC Cover and frame (heavy duty HD-20 grade designation) 560 mm internal diameter conforming to I.S. 12592, total weight of cover and frame to be not less than 182 kg. fixed in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including centering, shuttering all complete. (Excavation, foot rests and 12 mm thick cement plaster at the external surface shall be paid for separately) : With common burnt clay F.P.S. (non modular) bricks of class designation 10.00 |
| 14 | Extra depth for circular type manhole 1.52 m internal dia (at bottom) beyond 2.30 m : With common burnt clay F.P.S. (non modular) bricks of class designation 10.00 |
| 15 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) |
| 16 | Extra for plastering on circular work not exceeding 6.0 m in radius in one coat. |
| 17 | Neat cement punning. |
| 18 | Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS : 10910, on 12 mm dia steel bar conforming to IS: 1786, having minimum cross section as 23 mmx25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufacture's permanent identification mark to be visible even after fixing, including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) complete as per design. |
| 19 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming & watering, lead upto 50 m and lift upto 1.5 m. |
| 20 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 21 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size). |
| 22 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). Please Enable Macros to View BoQ information |