| 1 | Prototype Telescopic Boom Crane complete with Match Truck/Wagon and all accessori es such as Lifting Beam of 120 T capacity and Light weight Polyester Slings, Steel Wire Ropes, Chains & Tools (scope as per Clause 1.2.3 of RDSO specification, as detailed at Clause 3.1.1, 3.2 & 3.5 respe ctively of RDSO specification) inclusive of any other accessory/ equipment, which the manufacturer c onsiders essential to make the crane fully operational. (List of items with their individual costs to be enclosed in the price bid) [ Warranty Period: 78 Months after the date of delivery ] ] |
| 2 | Cost of Preventive Maintenance charges for BM1 during warranty period as per Clause 3.11 of RDSO specification and Clause 15 of Section 5 of Bid Document Part-II ] |
| 3 | Cost of Comprehensive AMC for BM1for a period of 5 years after warranty period as pe r Clause 16 of Section V of Bid Document Part II [ Warranty Period: 6 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ] |
| 4 | Manufactured / Assembled Telescopic Boom Cranes complete with Match Truck. Wago n and all accessories such as Lifting Beam of 120 T Cap. and Light Weight Polyester Slings, Steel Wir e Ropes , Chains & Tools (scope as per Clause 1.2.3 of RDSO specification, as detailed at Clause 3.1. 1, 3.2 & 3.5 respectively of RDSO specification) inclusive of any other accessory/ equipment, which t he manufacturer considers essential to make the crane fully operational. (List of items as per Cl. 1.2. 3 of RDSO specification, assemblies/ sub-assemblies for fabricated goods with their individual costs t o be enclosed in the price bid) [ Warranty Period: 78 Months after the date of delivery ] ] |
| 5 | Cost of Preventive Maintenance charges for BM2 during warranty period as per Clause 3.11 of RDSO specification and Clause 15 of Section 5 of Bid Document Part-II ] |
| 6 | Cost of Comprehensive AMC for BM2 for a period of 5 years after warranty period as p er Clause 16 of Section V of Bid Document Part II [ Warranty Period: 6 years, AMC Period: 5 year s, Rate of Discounting: 10 % ] ] |
| 7 | Special Lifting Beam of min. 175 T capacity along with slings, scope of supply as per cl ause 1.2.3 (ii), as detailed at Clause 3.1.2 of RDSO specification inclusive of any other accessory/ eq uipment, which the manufacturer considers essential to make the crane fully operational. [ Warrant y Period: 78 Months after the date of delivery ] ] |
| 8 | Tunnel Fork attachment mountable to Telescopic Jib,scope of supply as per clause 1.2. 3 (iii), as detailed at Clause 3.3 of RDSO Specification inclusive of any other accessory/ equipment, w hich the manufacturer considers essential to make the crane fully operational. [ Warranty Period: 78 Months after the date of delivery ] ] |
| 9 | Cost of Preventive Maintenance charges for Special Lifting Beam (ESP1) during warrant y period as per Clause 3.11 of RDSO specification and Clause 15 of Section 5 of Bid Document Part-II ] |
| 10 | Cost of Comprehensive AMC for Special Lifting Beam (ESP1)for a period of 5 years afte r warranty period as per Clause 16 of Section V of Bid Document Part II [ Warranty Period: 6 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ] |
| 11 | Cost of Preventive Maintenance charges for Tunnel Fork Attachment (ESP2) during wa rranty period as per Clause 3.11 of RDSO specification and Clause 15 of Section 5 of Bid Document P art-II ] |
| 12 | Cost of Comprehensive AMC for Tunnel Fork attachment (ESP2)for a period of 5 years after warranty period as per Clause 16 of Section V of Bid Document Part II [ Warranty Period: 6 y ears, AMC Period: 5 years, Rate of Discounting: 10 % ] ] |
| 13 | Crane Training Simulator, scope of supply as per clause 1.2.3 (iv), as detailed at claus e 3.4 of RDSO specification inclusive of any other accessory/ equipment, which the manufacturer con siders essential to make the crane fully operational. [ Warranty Period: 78 Months after the date of delivery ] ] |
| 14 | Cost of Preventive Maintenance charges for Crane Training Simulator (ESP3) during wa rranty period as per Clause 3.11 of RDSO specification and Clause 15 of Section 5 of Bid Document P art-II ] |
| 15 | Cost of Comprehensive AMC for Crane Training Simulator (ESP3)for a period of 5 years after warranty period as per Clause 16 of Section V of Bid Document Part II [ Warranty Period: 6 y ears, AMC Period: 5 years, Rate of Discounting: 10 % ] ] |
| 16 | Cost of Training at manufacturer's works (ref. clause 4.7.1 of RDSO Specification)for 80 0 Man days ] |
| 17 | Cost of training at designated place in India (ref. 4.7.3 of RDSO specification) for 2000 man days ] |
| 18 | Cost of development of new infrastructural facilities, up-gradation of existing facilities such as tools & tackle, jigs & fixtures, test benches etc. in Selected Workshop which would be require d for manufacturing/Assembly of cranes under contract as per clause 5.2.1 & 5.2.2 of RDSO specifica tion. ] |