| 1 | Supply of 11 KV Line Material | Stone Pad 300x300x75 mm |
| 2 | Supply of 11 KV Line Material | Barbed Wire |
| 3 | Supply of 11 KV Line Material | Danger Board with Clamp |
| 4 | Supply of 11 KV Line Material | T off Channel 125x65x6x1300 mm |
| 5 | Supply of 11 KV Line Material | Clamp for T off Channel |
| 6 | Supply of 11 KV Line Material | Top Channel 125x65x6x2240 mm |
| 7 | Supply of 11 KV Line Material | MS Dropper Channel 100x50x6x2028 mm |
| 8 | Supply of 11 KV Line Material | F Clamp with Nut and Bolts |
| 9 | Supply of 11 KV Line Material | PG Clamp for Weseal to Weseal |
| 10 | Supply of 11 KV Line Material | GI Wire 10 SWG |
| 11 | Supply of 11 KV Line Material | Holding Clamp |
| 12 | Supply of 11 KV Line Material | Red Oxide Paints |
| 13 | Supply of 11 KV Line Material | Allunimum Paints |
| 14 | Supply of 11 KV Line Material | Guarding Angle 65x65x6x1600 mm |
| 15 | Supply of 11 KV Line Material | Guarding Clamp |
| 16 | Supply of 11 KV Line Material | Nut and Bolts with Washer |
| 17 | Supply of 11 KV Line Material | Clamp with Nut and Bolts |
| 18 | Supply of LT Line Material | Stone Pad 300x300x75 mm |
| 19 | Supply of LT Line Material | Suspension Clamp |
| 20 | Supply of LT Line Material | Dead End Clamp |
| 21 | Supply of LT Line Material | LT AB Cable 1x25+1x16 sq. mm |
| 22 | Supply of LT Line Material | Nut and Bolts with Washer |
| 23 | Supply of LT Line Material | Danger Board with Clamp |
| 24 | Safe Carriage of 11 KV Line Material | Safe carriage of line material from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side. |
| 25 | Safe Carriage of 8.5 M PCC Pole | Safe carriage of 8.5 Mtr Long PCC pole from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side. |
| 26 | Safe Carriage of 11 M STP | Safe carriage of 11 Mtr Long ST pole from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side. |
| 27 | Erection of 8.5 M PCC Single Support | Erection of 8.5 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 28 | Erection of 11 M STP Single Support | Erection of 11 mtr ST Pole as single support including fixing of all HT/LT accessories etc. complet, pole should be grouted properly as per DVVNL/RESPO norms. |
| 29 | Erection of 8.5 M PCC Double Pole | Erection of 8.5 mtr PCC as Double Pole/Section Pole including fixing of all HT/LT accessories etc. complete pole should be grouted properly as per DVVNL/RESPO norms. |
| 30 | Erection of 11 M STP Section Double Pole | Erection of 11 mtr Long ST Pole as Section Pole/ Double Pole including fixing of all HT/LT accessories etc. complete with TPMO, pole should be grouted properly as per DVVNL/RESPO norms. |
| 31 | Dismentalling old Weseal Conductor | Dismentalling of old ACSR Weseal Conductor stacking of proper place. |
| 32 | Laying ACSR Weseal Conductor | Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of ACSR Weseal Conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work. |
| 33 | Erection of Stone Pad | Fixing of Stone Pad 300x300x75 mm |
| 34 | Erection of Barbed Wire | Fixing of Barbed Wire |
| 35 | Erection of F Bracket | Fixing of F Clamp with Nut & Bolts |
| 36 | Erection of Danger Board | Fixing of Danger Board with Clamp |
| 37 | Erection of PG Clamp | PG Clamp |
| 38 | Erection of Allunimum Paint | Fixing of Alluminium Paint |
| 39 | Erection of Red Oxide Paint | Fixing of Red Oxide Paint |
| 40 | Erection of Holding Clamp | Fixing of Holding Clamp |
| 41 | Laying of GI Wire 8 SWG | Laying of GI Wire 8 SWG |
| 42 | Laying of GI Wire 10 SWG | Laying of GI Wire 10 SWG |
| 43 | Erection of Earthing Complete | Erection of Earthing Complete |
| 44 | Erection of Stay Set Complete | Fixing of Stay set complete including the work of nozzling etc. |
| 45 | Dismentalling of ST Pole etc | Dismentalling of ST Pole/Guarter & Rail Pole stacking of proper place. |
| 46 | Safe Carriage of Dismantilled Material | Safe carriage of dismantilled material (ACSR Weseal Conductor, Cross Arm, Clamp, F Clamp, Top Channel & other accessories etc.) from the pit side to the store distance 0 to 60 Km. with loading & unloading at both ends and proper stacking in store. |
| 47 | Safe Carriage of Dismantilled ST Pole etc | Safe Carriage of Dismantiled ST Pole/Gattere & Rail Pole from the pit side to store in distance 0 to 60 km with loading and unloading at both ends proper stacking in store. |
| 48 | Safe Carriage of LT Line Material | Safe carriage of line material from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side. |
| 49 | Safe Carriage of 8.5 M PCC Pole | Safe carriage of 8.5 Mtr Long PCC pole from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side. |
| 50 | Safe Carriage of LT AB Cable | Safe carriage of LT AB cable 3x50+1x35+1x16 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side. |
| 51 | Safe Carriage of LT AB Cable | Safe carriage of LT AB cable 3x120+1x95+1x16 sq. mm from store center Etah / nearest 33/11 KV S/S to direct pit site in distance range 0 to 60 Km. including loading and unloading at both side. |
| 52 | Erection of 8.5 M PCC Single Support | Erection of 8.5 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 53 | Dismentalling of LT AB Cable | Dismentalling of LT AB cable 3x50+1x35+1x16 sq. mm stacking of proper place. |
| 54 | Dismentalling of LT AB Cable | Dismentalling of LT AB cable 3x120+1x95+1x16 sq. mm stacking of proper place. |
| 55 | Dismentalling of LT AB Cable | Dismentalling of LT AB cable 1x125+1x16 sq. mm stacking of proper place. |
| 56 | Erection of LT Cable | Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of LT AB cable 3x50+1x35+1x16 sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work. |
| 57 | Erection of LT Cable | Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of LT AB cable 3x120+1x95+1x16 sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work. |
| 58 | Erection of LT Cable | Laying, sagging stringing, binding, jumpering & fixing of all accessories etc of LT AB Cable 1x25+1x16 sq. mm on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work. |
| 59 | Erection of Stone Pad | Fixing of Stone Pad 300x300x75 mm |
| 60 | Erection of Danger Board | Fixing of Danger Board with Clamp |
| 61 | Erection of Earthing Complete | Fixing of Earthing Complete |
| 62 | Erection of Stay Set Complete | Fixing of Stay set complete including the work of nozzling etc. |
| 63 | Safe carriage of dismantilled LT AB Cable | Safe carriage of dismantilled material (LT AB Cable) from the pit side to the store distance 0 to 60 Km. with loading & unloading at both ends and proper stacking in store. |