| 1 | Carriage of 11 kv VCB (I/C & Outgoing) from Electricity Store CentreTajganj Agra to substation primises through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | Carriage of 11 kv VCB (I/C & Outgoing) from Electricity Store CentreTajganj Agra to substation primises through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) |
| 2 | Carriage of 11 kv XLPE Cable 3*185sqmm from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) | Carriage of 11 kv XLPE Cable 3*185sqmm from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-50Kms.) |
| 3 | Carriage of 11 kv Cable Jointing Kit 3*185sqmm (I/D & O/D) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | Carriage of 11 kv Cable Jointing Kit 3*185sqmm (I/D & O/D) from Electricity Store CentreTajganj Agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) |
| 4 | Dismentling of existing old/ burnt 11 kv VCB then opening all cable connection, bus bar connection and dragging of old VCB by mannual labour (Bandhani) from control room to sub station primises then cartage & received back of old VCB to ele. store centre Taj Agra alongwith loading, unloading both ends. (0-50km) including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Dismentling of existing old/ burnt 11 kv VCB then opening all cable connection, bus bar connection and dragging of old VCB by mannual labour (Bandhani) from control room to sub station primises then cartage & received back of old VCB to ele. store centre Taj Agra alongwith loading, unloading both ends. (0-50km) including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 5 | Installation, Commissioning and Testing of new 11 kv VCB (I/C & Outgoing) by Dragging of VCB from substation primises to control room by mannual labour (Bandhani).Complete with alignment, cable dressing, control wiring, earthing & testing as required. including the cost of arrangement of labour, T&P required for proper completion of work. | Installation, Commissioning and Testing of new 11 kv VCB (I/C & Outgoing) by Dragging of VCB from substation primises to control room by mannual labour (Bandhani).Complete with alignment, cable dressing, control wiring, earthing & testing as required. including the cost of arrangement of labour, T&P required for proper completion of work. |
| 6 | Laying & Dressing of 11 KV XLPE cable 3x185sqmm and making cable connection, bus bar connection with complete all respects. As per RESPO norms. | Laying & Dressing of 11 KV XLPE cable 3x185sqmm and making cable connection, bus bar connection with complete all respects. As per RESPO norms. |
| 7 | Laying of 11 KV XLPE cable 3x185sqmm in underground Trench including exavation, sand cushioning, brick protection, warning tape & backfilling etc. complete all respects. As per RESPO norms. | Laying of 11 KV XLPE cable 3x185sqmm in underground Trench including exavation, sand cushioning, brick protection, warning tape & backfilling etc. complete all respects. As per RESPO norms. |
| 8 | Filling of 11 KV Jointing Kit 3x185sqmm OD/ID and making connection as per direction by supervising engineer. | Filling of 11 KV Jointing Kit 3x185sqmm OD/ID and making connection as per direction by supervising engineer. |