| 1 | Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights indication arrangements wherever necessary all lead ,lift, labour and tools and plants etc., complete at Tar Road |
| 2 | Excavation of cable trench 45 cm width and 75 cm depth including cost of providing sign boards, danger lights, indication arrangements wherever necessary, lead, lift, labour and tools and plants etc., complete at Tar Road |
| 3 | Laying of HT 11 KV XLPE cable (3x300sq.mm) drawing and transport of cable and other materials if any from stores to site by vehicle. This will include recoiling, coiling and loading and unloading at both ends. |
| 4 | Laying of HT 11 KV XLPE cable (3x120sq.mm) drawing and transport of cable and other materials if any from stores to site by vehicle. This will include recoiling, coiling and loading and unloading at both ends. |
| 5 | Laying of LT cables (4x240sq.mm) in the excavated trench including the portion in the structure |
| 6 | Laying of LT cables(4x120sq.mm) in the excavated trench including the portion in the structure |
| 7 | Laying of LT cables (4x25sq.mm) in the excavated trench including the portion in the structure |
| 8 | Laying of LT cables (2x16sq.mm) in the excavated trench including the portion in the structure |
| 9 | Covering HT cable by cement \\"V\\" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size on the trough |
| 10 | Refilling with HT Cable excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. |
| 11 | Refilling with LT Cable excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete. |
| 12 | Transporting 50%Cable & Other Material from Vengikkal Head Office to Spot for 3.5KM. This includes recoiling, coiling and loading and unloading at both side. |
| 13 | Transporting 50%Cable & Other Material from Vengikkal Head Office to Spot for 7KM. This includes recoiling, coiling and loading and unloading at both side. |
| 14 | Supply & Erection of 11 KV HT 3 X 300 Sqmm end Outdoor Termination Kits. |
| 15 | Supply & Erection of 11 KV HT 3 X 120 Sqmm end Outdoor Termination Kits. |
| 16 | Supply & Erection of 11 KV HT 3 X 300 Sqmm Straight Joint Kits. |
| 17 | Supply & Erection of 11 KV HT 3 X 120 Sqmm Straight Joint Kits. |
| 18 | Erection of 6 Way pillar box including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing the pillars below ground level 3 feet from ground level including cost of all materials, cost of labours including electrical works, transportation, lead, lift complete etc., |
| 19 | Erection of 4 Way pillar box including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing the pillars below ground level 3 feet from ground level including cost of all materials, cost of labours including electrical works, transportation, lead, lift complete etc., |
| 20 | Erection of Mini pillar box including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing the pillars below ground level 3 feet from ground level including cost of all materials, cost of labours including electrical works, transportation, lead, lift complete etc., |
| 21 | Erection of Double / Single Pole Structure with AB Switch for HT UG Cable including Concreting plinth with terminations Complete Set. |
| 22 | Structure Earthing |
| 23 | Supply & Painting of structures (including str.materials ,str poles Aluminum paint and snowcem paint) |
| 24 | Supply & Painting with Smoke Grey Enamel & Numbering Main & Mini pillar boxes |
| 25 | Laying of 4 X 25 sqmm cable for 3-Ph service wire connections including supply & Fixing of Lugs upto Meter Connections. |
| 26 | Laying of 2 X 16 sqmm cable for Single Ph service wire connections including supply & Fixing of Lugs upto Meter Connections. |
| 27 | Supply & Erection of Spun Pipe With Collar RCC 225MM Covering for 11KV UG 3X400Sqmm Cable Road Crossing First Quality Iron Pipe |
| 28 | Dismantling of 30' RSJ/RCC/PSC pole including Transport of Poles Materials towards road side |
| 29 | Dismantling of line all size of conductor Including of coiling |
| 30 | Dismantling of All Size of Cable |
| 31 | Releasing of all size \\" V\\" X arm and transport Towards road side |
| 32 | Releasing of Tapping X arm & Guarding X arm |
| 33 | Releasing of LT 3 Phase X arm |
| 34 | Releasing of LT Single Phase X arm /TI fitting |
| 35 | Transporting Cable & Other Material from Spot to Vengikkal Head Office for 3.5KM. This includes recoiling, coiling and loading and unloading at both side. |
| 36 | Transporting Cable & Other Material from Spot to Vengikkal Head Office for 7KM. This includes recoiling, coiling and loading and unloading at both side. Please Enable Macros to View BoQ information |