| 1 | Beldar |
| 2 | Carriage of Material Building Rubbish Stone metal (Grit and ballast etc.) including loading and unloading with all lead |
| 3 | Grading roof for water proofing treatment with water proffing compound Cement mortar 1:3 (1 cement : 3 coarse sand) |
| 4 | Providing gola 75x75 mm in cement concretee 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : |
| 5 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete New Plastered Surface (three or more coats) |
| 6 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade including all scaffolding: Two or more coats on new work including prepartion of base with primer, putty, lippy etc complete in all respect. |
| 7 | Painting exterior surface of Wall with 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty, etc complete in all respect including scaffolding and safety provision New Work |
| 8 | Making holes in stone masonry wall upto 450 mm x 450 mm size and making good in CM 1:6. |
| 9 | Providing and fixing double scaffolding system on the exterior side, upto five story made with 4\\" wooden member 1.5 m c/c horizontal and vertical direction joining with rassi, clamps, challies. The scaffolding system shall be stiffened with bracing, runner, connection of building if necessary with all essential safty features for the workmen etc complete as per direction of EI.The lavation area of the scaffolding shall be measured for payment. The payment will be made once irrespective of duration of scaffolding.Note : This item to be used for maintence work judicially |
| 10 | Repair to damaged RCC slabs, beams and columns etc for strengthening with cement mortar 1 : 2 in following steps :-i) Choping losse and cracked concretee to required depth, cleaning the exposed surface of steel and concretee with wire brush and sand papering , cleaning of concretee surface with water as necessary and getting dried.ii) Applying Epoxy primer on the exposed steel bars.iii) Applying Epoxy hardener and resin mix (as per manufectured's specification) on concretee and steel bars with brush.iv) Spreading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day.v) Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete.vi) Cure the plastered surface for 15 days, All work including scaffolding etc. complete in all respect. |
| 11 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. |
| 12 | Add extra for additional height in centring, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentring at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan are is to be measured) |
| 13 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the billets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevant IS code) |
| 14 | Rebarring work in old R.C.C structures including making bore hole to adjust required bar diameter and filling a good quality filler to provide a tensile strength as per requirement and fix the Bar to the section including cost of bars. 12 mm bar |
| 15 | Providing and laying in position specified grade of cement concretee for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.M20 grade Nominal Mix / Design Mix |
| 16 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: Please Enable Macros to View BoQ information |