| 1 | Supply and ererction of following Material |
| 2 | MS Nut Bolt with washer off size |
| 3 | Holding clamp pcc pole 8.5 mtr |
| 4 | Holding clamp pcc 11 mtr |
| 5 | Guarding angle 50×50×6×2500 with fixing with all accessories |
| 6 | Shackle/stay insulator |
| 7 | Stone pad 300×300×75mm |
| 8 | F clamp |
| 9 | Hdpe/gi pipe for cable hoisting with all accesries and connection |
| 10 | Safe Loading carriage & unloading of following material from store centre to pit site/JE Dump store |
| 11 | PCC pole 8.5 mtr long |
| 12 | PCC pole 11 mtr long |
| 13 | 11 KV Pin Insulator with GI pin |
| 14 | 11 KV Disk Insulator with Fitting |
| 15 | Acsr conductor |
| 16 | Earthing complete |
| 17 | Dropper channel |
| 18 | Stay complete |
| 19 | GI wire |
| 20 | 11 kv xlpe 3*185 sqmm cable |
| 21 | 11 KV X arm |
| 22 | T-OFF channel |
| 23 | Top channel |
| 24 | Cable jointing kit |
| 25 | 11 KV VCB |
| 26 | Erection of above material that is carriage from store center to site |
| 27 | Erection of Single PCC 8.5 mtr long Pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole) |
| 28 | Safe Installation & Commissioning Of 11 KV VCB at Control Room with all Connections. |
| 29 | Erection of Single PCC 11 mtr long Pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole) |
| 30 | Concreting of PCC 8.5/11 mtr single and double pole. |
| 31 | Erection of PCC 8.5/11 mtr long double pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole) |
| 32 | Erection of PCC 8.5/11 mtr long double pole with all accessories (All neceassry decentralized material shall be supplier by the contractor expect pole) |
| 33 | Fixing of 11 KV Pin Insulator with GI pin |
| 34 | Fixing of 11 KV Disk Insulator with Fitting |
| 35 | Fixing of Dropper Channel |
| 36 | Proper use of GI wire FOR GAURDING AND EARTHING OF POLE ETC. |
| 37 | Fixing of 11 KV X arm |
| 38 | Fixing of T-off channel |
| 39 | Fixing of top channel |
| 40 | Fixing of cabl;e jointing kit |
| 41 | Grouting and Nuzzling of 11 KV stay set complete including fixing of necessary clamps. Accessories 15 required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied by the contractor. |
| 42 | Stay concreting |
| 43 | Ordinary Earthing by 11 KV MS earth Rod 2500 mm per RESPO schedule. |
| 44 | Erection of 11 kv xlpe cable by manual methode |
| 45 | Stringing & Sagging of ACSR conductor on 11 KV line |
| 46 | Providing earthing of existing boring type earthing with connection for new pannel |
| 47 | Tree trimmimg work |
| 48 | Dismenataling of existing line and network and carriage as per instruction from work incharge Please Enable Macros to View BoQ information |