| 1 | Carriage, loading-unloading with proper stacking of following material from Central Store /department store to Site distance approx 20 Km. |
| 2 | 11 KV 3x185 sq.mm XLPE cable |
| 3 | 9/11 Mtr long ST pole |
| 4 | 11 KV cable box straight thru |
| 5 | 11 KV cable box O/D |
| 6 | 11 KV Polymeric Pin INSULATOR with Nut |
| 7 | V TYPE X ARM 65X65X6MM |
| 8 | 11 KV Polymeric Disc Insulator B&S Type |
| 9 | 11 KV Disc FITTING |
| 10 | STAY SET COMPLETE |
| 11 | ACSR DOG/RABBIT CONDUCTOR |
| 12 | GI WIRE 05 SWG |
| 13 | Fabrication, erection of cable exposure on 11 Meter long ST pole with fixing of necessary clamps, accessories required including supply and fixing of straight Ms 100x50mm Top channel (2240mm long) One no, dropper channel 100x50mm (2240mm long) 2 Nos, with arrangement of fixing 3 nos. pin insulator, along with 11 KV DO Fuse set as per RESPO spenc & direction of E/I. ST Pole shall be supplied by the deptt. |
| 14 | Fabrication, erection of single 11 Mtr ST/8.5 PCC Pole with fixing of necessary clamps, accessories required including supply & fixing of clamp, nuts & bolts, Grouting with cement, sand, brick ballast in ratio :1:4:8 and earthing as per RESPO specification & direction of E/I with fixing of T-off with fitting & tapping pole. (Only Pole shall be Supplied by the deptt.) |
| 15 | Fixing of M.S. channel |
| 16 | Earthing of poles as per RESPO norms . (All the materials supplied by contractor) |
| 17 | Grouting of poles with help of cement sand & brick ballast. |
| 18 | Painting of pole |
| 19 | Laying of 11 KV 3x185 sq.mm XLPE cable by manual method |
| 20 | Hoisting of cable with the help of GI pipe 4\\" dia each having length of 3 meter along with supply and fixing of MS brackets and GI pipe. |
| 21 | Making of bus-bar on double pole with the help of M.S. channel, M.S. T-off, pin & pin insulator |
| 22 | Sagging of ACSR weasel /Racoon conductor as per RESPO norms and in the directions of supervising Engineer including cradle type guarding] fixing/mounting of material clamps fitting etc, |
| 23 | Grouting & concreting of stay rod 1800x16 mm. Fixing , tighting and nozzling of stay wire with the pole of required tension with clamps as per RESPO schedule, complete in all respects |
| 24 | High presure testing of cable |
| 25 | Providing and fixing of danger board |
| 26 | Providing and fixing of STONE PAD |
| 27 | Providing and fixing of Nuts & Bolts OFF SIZE |
| 28 | Providing and fixing of cable route marker |
| 29 | Providing and fixing of under ground warning tape |
| 30 | Cardel Type guarding of 11 KV line made of GI No. 6/8 SWG (GI wire shall be supplied by the department ) |
| 31 | Fixing of guarding Angle with clamps, nuts and bolt . (All material Supplied by the contractor ) Please Enable Macros to View BoQ information |